Title: Environmental impact assessment : wharf reconstruction and upgrading of the existing berthing facility and slipway at FSM Thilafushi plot
Authors: Land and Marine Environmental Resources Group
Keywords: Wharf reconstruction
Berthing facility
Legislative and regulatory considerations
Climate and oceanography
Marine surveys
Socio-economic environment
Constructional impacts
Mitigation measures
Environmental monitoring
Environmental impact assessments
Issue Date: Mar-2013
Citation: Land and Marine Environmental Resources Group. (2013). Environmental impact assessment : wharf reconstruction and upgrading of the existing berthing facility and slipway at FSM Thilafushi plot. Male': Maldives
Abstract: The slipway and berthing facility used by Fuel Supplies Maldives Pvt Ltd on Thilafushi is located on the northeastern side of the island. The facility has undergone extensive damage over the years and is also not sufficient to fully cater to the needs of the company. The proposed project involves the repair of the existing slipway and modification of seaward wharf of the plot. The seaward wharf will be extended by 311 and protected by sheet piles. The wharf will be designed to cater to vessels of 2000 tonnes (alongside berthing facility). The Slipway will be designed to cater for vessels of 200 tonnes. The project also involves reconstruction of the plot separating the wall from adjacent plot at the eastern side. The proponent of the proposed project is Fuel Supplies Maldives Pvt Ltd (FSM). Fuel Supplies Maldives, incorporated on 18th December 2000 is now a joint venture between State Trading Organisation (STO) and the Maldives National Oil Company (MNOC) formed with the main objective of streamlining fuel distribution in the country and to offer easy and convenient access to fuel throughout the country (FSM website, accessed March 2013). The total estimated cost of this project is ME 1.5 million. This document presents the findings of an Environmental Impact Assessment (HA) for the repair of the existing slipway and modification of seaward wharf of the plot used by ESM Pvt Ltd in Thilafushi. Developers of such development projects are required to carry out EIA. studies under the Environmental Act of Maldives. The developer is required to obtain approval of the Environmental Protection Agency (EPA), prior to the implementations of any development activities on the island. Land and Marine Environmental Resources Group Pvt Ltd have been engaged by FSM Pvt Ltd to prepare the EIA and to provide assistance in other environmental related activities. This HA is prepared in accordance with Environmental Impact Assessment Regulations 2012 and the environmental policy and guidelines of the Government of Maldives.