Title: Addendum 2 to the environmental impact assessment report for the development of a transit hotel and luxury villas at Baa Finolhas
Authors: Land and Marine Environmental Resources Group
Keywords: Quaywall construction
Revetment construction
Jetty construction
Environmental impacts
Mitigation measures
Environmental monitoring
Environmental impact assessments
Issue Date: Nov-2014
Citation: Land and Marine Environmental Resources Group. (2014). Addendum 2 to the environmental impact assessment report for the development of a transit hotel and luxury villas at Baa Finolhas. Male': Maldives
Abstract: This non-technical summary highlights the findings of the Second Addendum to the Environmental Impact Assessment of the proposed development of a Transit Hotel and Luxury Villas on the island of Finolhas in Baa Atoll by Coastline Hotels and Resorts Pvt Ltd. The proponent has brought changes to the concept plan, based on which the EIA for the project was approved. The EIA report was submitted and approved on 21st January 2013. A revised concept plan has been approved and a conditional development approval by the Ministry of Tourism has been provided, conditional to environmental clearance by EPA. This addendum therefore covers description of these changes, their environmental impacts and any mitigation measures that are required in context of environmental impacts and mitigation measures described in the EIA of 2013, The changes proposed to the concept are;  Quay wall construction on the land side of the harbour basin  Revetment construction on the south western shoreline  Construction of a temporary jetty on north eastern lagoon These changes are fully discussed in Section 4 of the report, while impacts and monitoring required are discussed in Sections 5 and 6. While the proposed changes to the concept range from minor to moderate (few cases), the environmental footprint of the proposed changes are anticipated as low. Revetment works proposed is likely to have a positive impact to the shoreline where it has been proposed and nearby shoreline, as the primary objective of the revetment was to control severe erosion in this area. Quay wall, although not part of original concept would provide additional mooring space within the harbour in addition to reducing sediment fill up into the harbour basin without the quay wall. The quay wall construction will not completely block water flow across the harbour along the shoreline as there are gaps in the revetment beneath harbour wall ways. Temporary jetty has been proposed for the construction period only (second phase of the overall project, described in EIA 2013). Hence no significant additional impacts are expected to occur due to the changes to the concept plan and construction of temporary jetty. Therefore, it is concluded that the mitigation and monitoring proposed in the EIA for this development is more than sufficient to address these requirements of the project.
URI: http://saruna.mnu.edu.mv/jspui/handle/123456789/4310
Appears in Collections:ތިމާވެށި
Environment A


Files in This Item:
File Description SizeFormat 
Finolhas EIA - Addendum II.pdf7.87 MBAdobe PDFView/Open