Title: Addendum 1 for environmental impact assessment of Hulhule-Hulhumale connecting link road development project in North Male‟, Atoll
Authors: Water Solutions
Keywords: Existing environment
Existing marine environment
Environmental impacts
Legislative and regulatory considerations
Environmental monitoring
Environmental management and monitoring plan
Issue Date: Sep-2017
Citation: Water Solutions. (2017). Addendum 1 for environmental impact assessment of Hulhule-Hulhumale connecting link road development project in North Male‟, Atoll. Male': Maldives
Abstract: This report discusses the findings for the first addendum of the environmental impact assessment undertaken by Water Solutions Pvt. Ltd for undertaking the construction of the link road project between Hulhule-Hulhumale.. The project is proposed by Housing Development Corporation (HDC). The island of Hulhumale has been an important growth centre since its development. Presently, Hulhumale is the fastest growing urban centre and has residential as well as industrial developments to a scale that has never been experienced anywhere in the Maldives. Being close to Male‟ and the airport, Hulhumale has been attracting migrants from all over the Maldives. Construction of the Male‟ to Hulhule Bridge is presently the biggest infrastructure project of its kind under construction in Maldives. This project is very much tied with the present link road as this link road will provide direct connection of Hullhumale and the bridge, ultimately making the traffic flow from Hulhumale to Male‟. This road will be constructed on the east side of the existing land mass of Hulhule airport by reclaiming a small area further west of the existing island. The proposed road will consists of three zones. The details of the link road project is given in the Environmental Impact Assessment Report which is prepared by Water Solutions in August 2017 and the reason for the preparation of this first addendum report is due the change in location of sand burrow areas. In the Environmental Impact Assessment Report it was said that the sand will be obtained from the Hulhumale‟ phase 2, phase 1 and Maldives Airports Company Limited (MACL). However now that idea has been dropped out and it is now planned to obtain sand from the eastern side of Uthuru Thila Falhu and the bathymetry shows the depth varies between 40 to 60 meters approximately. The details of the geographic coordinates are given in the section project descriptions and Study Area. This lagoon has been used as a sand burrow area for previous similar projects and is estimated to dredge 410,000 cubic meters of sand from this location. The dredging project is subcontracted to the Dredging International (Cyprus) and it is estimated to complete the project in five to seven days. Environmental impacts were assessed and most of the environmental impacts of the project have been identified as resulting mainly from the coral reef damage caused by reclamation of additional land. Mitigation measures for the negative impacts have been identified and outlined in detail, especially sedimentation control methods. The most important mitigation measure is the use of bund walls in the fill areas. This EIA addendum was undertaken to assess the environmental impacts of the proposed dredging and reclamation to acquire more land for the link road construction project. Based on the assessment, it has been identified that the major impacts of the project will be felt on the marine environment during the dredging and discharging of sand. This EIA addendum report also highlights some of the studies and research work undertaken in similar environments, especially in Male‟، to understand the impacts of reclamation and construction works close to reef slope and how this knowledge can be transferred to similar environments based on the type of coastal protection methods in use. The mitigation measures are provided in the report with alternatives. It is vital to conduct the activities, during both project planning and construction phase, in line with mitigation measures emphasized in the report. Socio-economic impacts of the proposed project will be immense as direct land connection of Male‟ and Hulhumale would bring significant benefits to the general public. Connection of Hulhumale, Male‟ and the airport is a vital transportation link that would save time and money for more than 200,000 people residing in the greater Male‟ region. The environmental impacts of various projects that are currently being undertaken in the airport region have caused significant damage to reef in various areas. This project will also have its impacts, but the impacts will not be anything greater than to what the environment has already been subjected to. Therefore a comprehensive monitoring programme has been suggested which covers components of coastal and marine environment to assess how the critical components of this project will affect the environment and to what extent. It is important to follow this monitoring programme not only to comply with the regulation but also to ensure that the impacts are measures in realistic terms. Though some of the components of this project contravenes with the Dredging and reclamation regulation; the amendments brought to the regulation facilitates that this project could be implemented. Hulhule island is a special zone and Under clause 10 of the dredging and reclamation regulation, special projects are exempted. As the environmental consultants, it is our opinion that this project should be allowed to proceed as the environmental impacts of this project does not pose serious concerns to the natural environment. It is a project that has far greater socio-economic benefits than these limited environmental impacts.
URI: http://saruna.mnu.edu.mv/jspui/handle/123456789/5031
Appears in Collections:ތިމާވެށި
Environment A


Files in This Item:
File Description SizeFormat 
2017-09-17 - First Addendum to the development of Hulhule Link road Project.pdf10.08 MBAdobe PDFView/Open