Title: Environmental Impact assessment : for the proposed development of heavy load site in Thilafushi
Authors: Zahid, Ahmed
Keywords: Environmental impacts
Environmental impact assessments
Environmental monitoring
Issue Date: Sep-2010
Citation: Zahid, A. (2010). Environmental Impact assessment : for the proposed development of heavy load site in Thilafushi. Male': Maldives
Abstract: This report addresses the environmental concerns of the proposed reclamation of an area of about 25,300m2 (2.53hectares) to a height of about 1.3m above MSL by dredging a harbour inside the area that is reclaimed. The total volume of sand required for the reclamation is estimated to be about 56,000 cubic metres. In order to get this volume of sand using the proposed borrow area (harbour), it is estimated that the borrow area has to be dredged to about 5m. Otherwise, an additional volume of about 18,000m3 of sand would be required to reclaim the given area. The primary objective of the project is to create a harbour for the several barges, landing crafts and other vessels owned and operated by Heavy Load, to provide safe and adequate access to the facility and to provide space for the different activities carried out on the site as well as to improve the services provided by the facility. The proposed project area is on the southeast corner of Thilafushi, which is the official landfill island for the entire Maldives. Currently, the site has two sand beds on the west and eastern sides, which mark the eastern and western edges of the proposed reclamation area. The exact area is being currently finalised by Thilafushi Corporation Limited (TCL). Once TCL finalises the exact dimensions of Heavy Load Site, dredging and reclamation works will begin. The entire external periphery of the dredge area would be sheet piled prior to dredging and filling works so as to minimize sedimentation. The southern periphery, which faces the sea, would have further protection using rock boulders, which would be installed as a final step. The project is, therefore, expected to take about eight to twelve months. A large proportion of the reef flat on the southeast end of Thilafushi has been dredged to provide access to the different industrial plots of land in the area by large vessels with an entrance channel at the southeast corner of Thilafushi reef. The proposed dredging is similar in size, however, would have less impact on the marine environment in the area. The reef flat in this area is almost completely dead with a few live porites. The reef slope is also mainly dead. Given the currents in the proposed dredge area is slow and generally in a westerly direction, the potential for the sediments to move to the reef flat would be small. However, it should be noted that there is a lack of long term data to support this observation. Therefore, sediment settlement on the reef has to be minimized and the most practicable means to achieve this would be to sheet pile the reclamation area prior to dredging. This would minimize sedimentation while further mitigation measures including silt curtains at the discharge points of the silt passages may be used. However, this would only be necessary if the silt levels reach very high levels.
URI: http://saruna.mnu.edu.mv/jspui/handle/123456789/7822
Appears in Collections:ތިމާވެށި
Environment A




Items in Saruna are protected by copyright, with all rights reserved, unless otherwise indicated.