Browsing by Author | މުސައްނިފުން "އިބްރާހިމް ނަޢީމް"
Now showing 1 - 12 of 12
- Results Per Page
- Sort Options
Technical ReportItem Environment Impact Assessment for the proposed harbor construction phase 1 of Kulhudhuffushi, H. Dhaal Atoll, Maldives.(Ministry of Construction and Public Infra Structure, 2008-03) Shah, Hassan; Naeem, Ibrahim; ޙަސަން ޝާހް; އިބްރާހިމް ނަޢީމް ArticleItem Environmental Impact assessment notes for H. DH. Finey harbor construction project : Finey, thiladhunmathee dekunu-buri, Maldives(Ministry of Construction and Public Infra Structure, Maldives, 2008-01-21) Naeem, Ibrahim; އިބްރާހިމް ނަޢީމް1 Summary This impact note deals with the construction of a harbor at Finey in Haa-Dhaalu Atoll. 1. The implementing agency for this project is Ministry of Construction and Public Infrastructure (MCPI). The project will be executed under the Access Improvement Program of the government. The project was awarded to Maldives Transport and Contracting Company Limited (MTCC). 2. The proposed site for the project on the eastern side of the Island appears to be the most appropriate location for the harbor development taking into account environment, construction feasibility and economics of the proposed development. There is apparently a justifiable need to sacrifice a portion of beach (with no vegetation) from the Island to make the mouth of the entrance channel safe, to keep the harbor basin calm and to prolong the life the breakwaters. 3. Baseline environmental condition at the project site indicated that the coral cover around the harbor basin area was very low. The coastal vegetation around the proposed harbor area was also typical and does not represent any specific preservation value. 4. Significant environmental impacts are predicted for the proposed development project. But these are short term impacts (e.g. sedimentation). These impacts can be mitigated through proposed environmental impact mitigation measures. ArticleItem Environmental impact assessment note for R.Kinolhas harbor construction project, Kinolhas, Maalhosmadulu Uthuruburi, Maldives(Ministry of Construction and Public Infrastructure (MCPI), 2008-02) Naeem, Ibrahim; އިބްރާހިމް ނަޢީމްThis impact note deals with the construction of a harbor at Kinolhas in Raa Atoll. 1. The implementing agency for this project is Ministry of Construction and Public Infrastructure (MCPI). The project will be executed under the Access Improvement Program of the government. The project was awarded to Aima Construction Private Limited, Maldives. 2. The proposed site for the project on the northern side of the Island appears to be the most appropriate location for the harbor development taking into account environment, construction feasibility and economics of the proposed development. There is apparently a justifiable need to sacrifice a portion of beach (land with no vegetation) from the Island to make the mouth of the entrance channel safe, the keep the harbor basin calm and to prolong the life the breakwaters. 3. Baseline environmental conditions at the project site indicated that the coral cover around the harbor basin area was very low. The coastal vegetation around the proposed harbor area was mainly kaani, boakashikeyo, uni and dhiggaa, and does not represent any specific preservation value. 4. Significant environmental impacts are predicted for the proposed development project. But these are short term impacts (e.g. sedimentation). These impacts can be mitigated through proposed environmental impact mitigation measures. ArticleItem Environmental impact assessment notes for H.Dh. Kumundhoo harbour construction project, Kumundhoo, Thiladhunmathee Dhekunu-buri, Maldives(Ministry of Construction and Public Infrastructure (MCPI), 2008-01-20) Ibrahim, Naeem; އިބްރާހިމް ނަޢީމްThis impact note deals with the construction of a harbor at Kumundhoo in Haa- Dhaalu Atoll. 1. The implementing agency for this project is Ministry of Construction and Public Infrastructure (MCPI). The project was awarded to Heavy load Maldives Private Limited. 2. The proposed site for the project on the south-western side of the Island appears to be the most appropriate location for the harbor development taking into account environment, construction feasibility and economics of the proposed development. There is apparently a justifiable need to sacrifice a portion of land (with vegetation) from the Island to make the mouth of the entrance channel safe, the keep the harbor basin calm and to prolong the life the breakwaters. 3. Baseline environmental condition at the project site indicated that the coral cover around the harbor basin area was very low. The coastal vegetation around the proposed harbor area was also typical and does not represent any specific preservation value. 4. Significant environmental impacts are predicted for the proposed development project. But these are short term impacts (e.g. sedimentation). These impacts can be mitigated through proposed environmental impact mitigation measures. ArticleItem ހުކުރު ޚުޠުބާ(ދިވެހިބަހާއި އަދަބަށް ޚިދުމަތްކުރާ މަޖްލިސް, 1981-01-01) އިބްރާހިމް ނަޢީމް; Naeem, Ibrahim ArticleItem ރީތިކޮށް ޢަރަބި ލިޔުމުގެ މައްޗަށް ވިސްނައިލާންވެއްޖެ(ދިވެހިބަހާއި އަދަބަށް ޚިދުމަތްކުރާ މަޖްލިސް, 1981-04) އިބްރާހިމް ނަޢީމް; Naeem, IbrahimItem .ކުންފުންޏެއް ޖަވާހިރުފުންޏަކައް ވެނިމެނީއެވެ(ދިވެހިބަހާއި ތާރީޚަށްޚިދުމަތްކުރާ ޤައުމީ މަރުކަޒު, 1981-09-01) އިބްރާހިމް ނަޢީމް; Naeema, Ibraahim ArticleItem މަސްވެރިން ސަމާލުވަމާތޯ؟(މިނިސްޓްރީ އޮފް ފިޝަރީޒް އެންޑް އެގްރިކަލްޗަރ, 1999) އިބްރާހިމް ނަޢީމް; Naeem, Ibrahim ArticleItem ދިވެހި ބަހުގެ ލިޔުންތެރިކަމުގެ ހުނަރުވެރިކަން(Dhivehi Bahaai Thareekhah Khidhumaiykuraa Qaumee Majlis, 1994-05-01) Naeem, Ibrahim; އިބްރާހިމް ނަޢީމްItem ދިވެހި ޤަޥްމިއްޔަތު ދިރުވުމާމެދު އަޅުގަނޑަށް ފެންނަގޮތް(ދިވެހިބަހާއި ތާރީޚަށްޚިދުމަތްކުރާ ޤައުމީ މަރުކަޒު, 1981-08-01) Naeem, Ibrahim; އިބްރާހިމް ނަޢީމް ArticleItem ގާހުދުވުން - މިވަނީކީއްބާ؟(މިނިސްޓްރީ އޮފް ފިޝަރީސް, 1998-12-10) އިބްރާހިމް ނަޢީމް; Naeem, IbrahimItem ގިނަ ކުދީންގެ ލިޔުން ރީތި ނުވަނީ ކީއްވެތޯއެވެ؟(ދިވެހިބަހާއި އަދަބަށް ޚިދުމަތްކުރާ މަޖްލިސް, 1980-12-01) އިބްރާހިމް ނަޢީމް; Naeem, Ibrahim