Environment - ތިމާވެށި
Browse
26 results
Search Results
Technical ReportItem Environmental impact assessment for the proposed geotechnical students at thilafushi lagoon, Kaafu Atoll(2017-08) ސީޑީއީ ކޮންސަލްޓިންގު; CDE ConsultingThis document is submitted by China Harbour Engineering Company Limited to fulfil the requirements for an EIA under Environment Protection and Preservation Act and EIA Regulations to undertake the proposed geotechnical investigations on Thilafushi Lagoon. The proposed activity requires drilling nine boreholes to depth of 30-40 m and extracting sediment samples for laboratory assessments. The project site is the presently undeveloped shallow northwest corner of Thilafushi Lagoon. This site has been designated as a zone for port development in the previous Thilafushi Master Plans. The proposed drill size is 6” and will be undertaken using a drill rig mounted on a small floating platform. Platform will be anchored using weights. Drilled holes will be filled with Bentonite up to the top 1 m. The remaining areas will be filled with sand. This activity is part of the Thilafushi Container Port Study. The Proponent and Ministry of Economic Development has signed an MoU for an exclusive negotiation towards entering int0 an investment agreement for the construction, operation, management and financing of a seaport and free trade zone at Thilafushi Island, Male’ Atoll. The project is at its initial phase where its technical and financial feasibility is assessed. The project will only go into a design and construction phase only depending on the outcome of the assessment and the negotiations between the two parties. For the moment, the project requires surveying the project site to determine the technical feasibility. These include bathymetry surveys, geotechnical surveys and hydrodynamic studies. The project site comprise of shallow reef flat and deep lagoon. The surroundings are in poor condition. The coral reef is largely dead with limited new recruits. The proposed impact foot print is covered with coral rubble and sand. Thilafushi lagoon has undergone years of modification and the marine water quality around it is known to be in the worst conditions of any lagoon in the Maldives. The proposed activities are in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act and Environmental Impact Assessment Regulation 2012. This assessment shows that there are no significant impacts from the proposed activity. This is due to the limited the number of drill sites, the diameter of the drilling pipe, shallow depth at most sites, short drilling period, small impact foot print and absence of live coral cover or suitable substrate at the proposed drilling locations. Thus, no major mitigations measures are recommended. However, best environmental practices when working coral reef environments have been recommended. Consultations were held with Ministry of Economic Development and Thilafushi Corporation (TCL). Both parties consulted have no reservations on proceeding with the project. TCL has raised the concern that the overall port project MoU has been agreed with China Harbour Engineering without their input and asks MED to consult in the matter in the future. However, they have no issue in proceeding with the study. TCL have placed come conditions before the work can be carried out. These include regulatory clearances from EPA and to inform TCL one week prior to the start of work on site. The alternatives evaluated for the project were the no project option, reduced number of boreholes and alternative options do deal with the abandoned drill holes. No alternative option was necessary as the activities as currently designed do not have significant impacts. Monitoring programme proposed has focussed on water quality, noise and reef health. It is recommended to proceed with the project using the mitigation measures and management plan presented in this EIA. Technical ReportItem Environmental impact assessment for the proposed seagrass removal at Maafaru Island, Noonu Atoll(2017-08) ސީޑީއީ ކޮންސަލްޓިންގު; CDE ConsultingThis document is submitted to the Environment Protection Agency, by the proponent to fulfil the requirement of an EIA under the Environmental Protection and Preservation Act (EPPA) of the Maldives (4/93). This report provides the background to the proposed project components as well as an assessment of their likely environmental and social impacts, both beneficial and adverse. The proposed enhancement and mitigation measures are outlined where necessary together with an environment management plan and a monitoring programme. The project involves the removal of seagrass colonies from the eastern side of the island next to the existing settlement. The aim is to create a safe recreational swimming area for the local community. At the moment, Maafaru Island contains the largest seagrass colony in the northern Maldives and covers almost all coastal areas around the existing settlement. Locals are currently reluctant to use the lagoon for swimming as the seagrass is not conducive for standing upon and swimming. The low visibility also makes it risky for swimmers with chances of stepping on poisonous creatures such as urchins and rays. Project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012, Dredging and Reclamation Regulation, Waste Management Regulation 2013, and the Environmental Liability Regulation. The project parameters cannot adhere to the dredging reclamation regulation as is states that no dredging can be undertaken within 500 m form the ocean side reef edge and 50 m from vegetation line. The island‟s eastern shoreline is located within 500 m of the ocean side reef edge and proposed swimming area covers areas within 50 m of the shoreline. Therefore, discussions must be held between the proponent and the Ministry before the commencement of the project in order to solve this issue. The assessment shows that the proposed development involves major impacts on the marine environment particularly temporary loss of benthic organisms, and potential changes to coastal hydrodynamics and beach stability. Key mitigation measures for the construction stage include undertake construction works during calm weather conditions as much as possible particularly when wave activity is calmer, and carrying out the activities in as short a time period as possible to allow normal conditions to reestablish in the area as soon as possible. Operational stage impacts are limited to potential erosion arising from changes to the coastal hydrodynamics. The changes to the beach will likely occur as the new beach system tries to achieve equilibrium with the changed coastal conditions. However as it is not possible to determine beforehand whether this will occur, no specific erosion prevention measures are proposed but appropriate action will be decided after monitoring the changes. The alternatives were evaluated for the project but the current designs and methods have been preferred due to the significant advantages that the proposed design has over alternatives. An alternative location which was considered on the South East section of the island was rejected due to the practical, financial, and environmental limitations. Other locations could not be considered as significant developments have been proposed for locations both to the North and South of the existing community. The only feasible location is the proposed location on the North West of the island. Silt screens were considered as an alternative sedimentation control measure. However given the small size of the project area, the use of the proposed bund walls is preferred as it is more financially feasible. Monitoring of the project is crucial particularly the changes to hydrodynamics, shoreline, water quality, and lagoon benthos recovery. Particular attention should be given to monitor the erosion patterns along the Eastern section of Maafaru island. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. In conclusion, the project provides significant socio-economic benefits for the local community. Technical ReportItem Environment impact assessment for the proposed construction of Island Waste Management Centre at Maabaidhoo, Laamu Atoll(2017-10) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to construct the Island Waste Management Centre (IWMC) in Maabaidhoo, Laamu Atoll. The proponent of this project is United Nations Development Programme (UNDP) The contractor for this project is Uni Maldives Private Limited. The main rationale for the project is to establish a sustainable waste management system in the island so that the waste is disposed and managed properly. The project is intended at constructing an island level waste management centre, with a compost ground and machineries and equipment to collect and to manage the waste. This project forms part of Low Emission and Climate Resilient Development (LECReD), a United Nations joint programme which seeks to mainstream LECReD issues into local development planning and service delivery for greater community-level ownership and sustainability of programme benefits. The proposed project involves the construction of the waste management centre. The IWMC will have a compost pit, waste segregation lots, equipment room, toilet, rainwater tank. This will be implemented as part of this project. The proposed IWMC will measure 89ft by 83ft and will be built at southern tip of the island. The proposed centre will be developed to manage the waste generated in the island and to ensure proper and sustainable disposal of waste. The waste management centre will also composting tools, compacting machineries to manage the waste. A truck of 1.5 tonnes and bins will be provided for waste collection. The duration of the construction of IWMC will take approximately 3 months. Once constructed, it will be handed over to the council for operation. The island community previously disposed waste at different locations of the island and the waste is not segregated. Following the efforts during the mangrove conservation project, all waste is now disposed to the location designated to build the IWMC under this project. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012 and Waste Management Regulations and Maldivian Land Act and Decentralisation Act. The existing condition of the island and the proposed IWMC was assessed for this report. Assessments conducted include groundwater quality assessments, and terrestrial assessments. Baseline noise levels were also recorded at the site. The assessment shows that during construction stage of IWMC, main impacts will be increased noise level, air quality degradation, loss terrestrial flora and fauna. The proposed location is a vegetated area where already most of the vegetation has been cleared. However, prior to construction few of the pioneer species will need to be cleared. Other impacts during construction stage possible contamination of groundwater and soil due to leakage of chemical and oil. During operational stage, the most significant impacts on the groundwater, greenhouse gas emission and on biodiversity. If the IWMC is poorly constructed including composting pit, likelihood leachate leaking into the ground is high and this may have irreversible impacts on groundwater quality. During operational stage, the IWMC may be receiving waste that cannot be managed at the site if unsupervised, this may result in open burning waste that result in the emission of toxic gases and chemicals which will degrade the air quality and cause GHG emission. Accumulation and mismanagement of waste also has the tendency to impact the biodiversity in the island whereby certain species are replaced by crows and rats, which will feed on waste stockpiles. The proposed is an aesthetically pleasing site and the visual amenity of the area will also be disrupted. Since the proposed site used to be a wetland, before it was reclaimed from waste, risk of flooding the area during swell tides or torrential rain is high. This may significantly impact the operation of the IWMC. Proper mitigation measures must be taken to reduce the risk of flooding. Overall this is an environmental improvement project.. Through composting and selling recyclable materials the project will also open up business opportunities for the island. In addition, irresponsible dumping and littering around the island may be stopped following the implementation of IWMC and waste management plan. The alternative options were evaluated for the no project option and alternative locations for IWMC. The “No Project” option is deemed infeasible, given the current condition of waste management and disposal in the island. Alternative locations for IWMC were also considered, however as there are no other apt locations in the island, it is proposed to go ahead with the proposed location, with stringent measures to mitigate flooding in the area. Monitoring plan is designed to assess any changes to the physical of the island, ground water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at MVR 25,000 – 35,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Maabaidhoo Island council, Maabaidhoo public, Laamu Atoll Council, Ministry of Environment and Energy, Ministry of Housing and Infrastructure and Environmental Protection Authority. Both Maabaidhoo Island Council and public are in favour of this project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. Operational stage impacts are mainly on climate change, groundwater contamination and on biodiversity. Overall, the project will have positive impacts to the island community under supervised and effective management of the IWMC. . The EIA recommends to go ahead with the project and to develop the IWMC and to follow the mitigation measures to avoid significant impacts. Stringent mitigation measures must be taken to reduce the risk of flooding at the proposed location. It is strongly recommended to develop and implement an environmental management plan to maximise the benefits of IWMC and ensure sustainability of operations. Technical ReportItem Mundoo Island waste management center environmental management plan(2017-10) CDE Consulting Technical ReportItem Maavah Island waste management center environmental management plan(2017-10) CDE Consulting Technical ReportItem Environment impact assessment for the proposed construction of island waste management centre at Kunahandhoo, Laamu Atoll(2017-10) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to construct the Waste Management Centre (IWMC) in Kunahandhoo, Laamu Atoll. The proponent of this project is United Nations Development Programme (UNDP). The main rationale for the project is to establish a sustainable waste management system in the island so that the waste is disposed and managed properly. The project is intended at constructing an island level waste management centre, with a compost ground and machineries and equipments to collect and to manage the waste. This project forms part of Low Emission and Climate Resilient Development (LECReD), a United Nations joint programme which seeks to mainstream LECReD issues into local development planning and service delivery for greater community-level ownership and sustainability of programme benefits. The proposed project involves the construction of the waste management centre. The IWMC will have a compost pit, waste segregation lots, equipment room, toilet, rainwater tank. This will be implemented as part of this project. The proposed IWMC will measure 84ft by 89ft. The proposed centre will be developed to manage the waste generated in the island and to ensure proper and sustainable disposal of waste. The waste management centre will also composting tools, compacting machineries to manage the waste. A truck of 1.5 tonnes and bins will be provided for waste collection. The duration of the construction of IWMC will take approximately 3 months. Once constructed, it will be handed over to the council for operation. At present, there is no designated site waste disposal. The island community disposes waste at different locations of the island and the waste is not segregated. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012 and Waste Management Regulations and Maldivian Land Act and Decentralisation Act. The existing condition of the island and the proposed IWMC was assessed for this report. Assessments conducted include groundwater quality assessments, and terrestrial assessments. Baseline noise levels were also recorded at the site. The assessment shows that during construction stage of the IWMC, main impacts will be increased noise level, air quality degradation and loss terrestrial flora and fauna. The proposed location is a vegetated area where already most of the vegetation has been cleared. However, prior to construction few of the pioneer species will need to be cleared. Other impacts during construction stage possible contamination of groundwater and soil due to leakage of chemical and oil. During operational stage, the most significant impacts on the groundwater, greenhouse gas emission and on biodiversity. If the IWMC is poorly constructed including composting pit, likelihood leachate leaking into the ground is high and this may have irreversible impacts on groundwater quality, especially given the island has low groundwater lens is prone to flooding. The IWMC may be receiving waste that cannot be managed at the site if unsupervised, this may result in open burning waste that result in the emission of toxic gases and chemicals which will degrade the air quality and cause GHG emission. Accumulation and mismanagement of waste also has the tendency to impact the biodiversity in the island whereby certain species are replaced by crows and rats, which will feed on waste stockpiles. The visual amenity of the area will also be disrupted. However, through composting and selling recyclable materials the project will also open up business opportunities for the island. In addition, irresponsible dumping and littering around the island may be stopped following the implementation of IWMC and waste management plan. Overall this is an environmental improvement project. The alternative options were evaluated for the no project option and alternative locations for IWMC. The “No Project” option is deemed infeasible, given the current condition of waste management and disposal in the island. Alternative locations for IWMC were also considered, however as there are no other apt locations in the island, it is proposed to go ahead with the proposed location, since the IWMC will be built with 1ft elevated as a mitigation measure. Monitoring plan is designed to assess any changes to the physical of the island, ground water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at MVR 25,000 – 35,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Kunahandhoo Island council, Kunahandhoo public, Laamu Atoll Council, Ministry of Environment and Energy, Ministry of Housing and Infrastructure and Environmental Protection Authority. Both Kunahandhoo Island Council and public are in favour of this project, although the newly elected council not fully acquainted with the project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. Operational stage impacts are mainly on climate change, groundwater contamination and on biodiversity. Overall, the project will have positive impacts to the island community under supervised and effective management of the IWMC. . The EIA recommends to go ahead with the project and to develop the IWMC and to follow the mitigation measures to avoid significant impacts. It is strongly recommended to develop and implement and environmental management plan to maximise the benefits of IWMC and ensure sustainability of operations. Technical ReportItem Environment impact assessment for the proposed construction of island waste management centre at Dhanbidhoo, Laamu Atoll(2017-10) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to construct the Waste Management Centre (IWMC) in Dhanbidhoo, Laamu Atoll. The proponent of this project is United Nations Development Programme (UNDP). The main rationale for the project is to establish a sustainable waste management system in the island so that the waste is disposed and managed properly. The project is intended at constructing an island level waste management centre, with a compost ground and machineries and equipments to collect and to manage the waste. This project forms part of Low Emission and Climate Resilient Development (LECReD), a United Nations joint programme which seeks to mainstream LECReD issues into local development planning and service delivery for greater community-level ownership and sustainability of programme benefits. The proposed project involves the construction of the waste management centre. The IWMC will have a compost pit, waste segregation lots, equipment room, toilet, rainwater tank. This will be implemented as part of this project. The proposed IWMC will measure 98ft by 98ft and it will be developed on the southern tip of the island. The proposed centre will be developed to manage the waste generated in the island and to ensure proper and sustainable disposal of waste. The waste management centre will also composting tools, compacting machineries to manage the waste. A truck of 2 tonnes and bins will be provided for waste collection. The duration of the construction of IWMC will take approximately 3 months. Once constructed, it will be handed over to the council for operation. The location, which has been approved, by EPA and MLSA is approximately 1km from the residential and requires the development of an access road. This will incur additional cost and the distance also makes it impractical to transfer waste on a daily basis. At present, there is no designated site waste disposal. The island community disposes waste at two different locations of the island and the waste is not segregated. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012 and Waste Management Regulations and Maldivian Land Act and Decentralisation Act. The existing condition of the island and the proposed IWMC was assessed for this report. Assessments conducted include groundwater quality assessments, air quality and terrestrial assessments. Baseline noise levels were also recorded at the site. The assessment shows that during construction stage of the IWMC, main impacts will be increased noise level, air quality degradation and loss terrestrial flora and fauna. The proposed location is a vegetated area where already some of the vegetation has been cleared. However, if the allocated site is chosen for the construction of IWMC, an access road will need to be developed which will require more vegetation to be cleared including palm trees. Other impacts during construction stage possible contamination of groundwater and soil due to leakage of chemical and oil. During operational stage, the most significant impacts on the groundwater, greenhouse gas emission and on biodiversity. If the IWMC is poorly constructed including composting pit, likelihood leachate leaking into the ground is high and this may have irreversible impacts on groundwater quality. The IWMC may be receiving waste that cannot be managed at the site if unsupervised, this may result in open burning waste that result in the emission of toxic gases and chemicals which will degrade the air quality and cause GHG emission. Further to this, distance to the IWMC from the residential zone means a longer commute route which will further contribute to GHG emission from transportation. Accumulation and mismanagement of waste also has the tendency to impact the biodiversity in the island whereby certain species are replaced by crows and rats, which will feed on waste stockpiles. The visual amenity of the area will also be disrupted and given that the nearest island in the vicinity will be developed to a resort this poses major issues in the long term. However, through composting and selling recyclable materials the project will also open up business opportunities for the island. In addition, irresponsible dumping and littering around the island may be stopped following the implementation of IWMC and waste management plan. The alternative options were evaluated for the no project option and alternative locations for IWMC. The “No Project” option is deemed infeasible, given the current condition of waste management and disposal in the island. Given the unfeasibility of the proposed site for IWMC due to the long distance for transportation from the residential zone and from the harbour, alternative locations for the IWMC explored. It is recommended that any other location within 200ft from either the northern or southern direction from the residential zone is feasible or building IWMC. This provides a feasible transportation distance from the collection entities also to the harbour where the recyclable materials can be easily traded. Monitoring plan is designed to assess any changes to the physical of the island, ground water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at MVR 25,000 – 35,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Dhanbidhoo Island council, Dhanbidhoo public, Laamu Atoll Council, Ministry of Environment and Energy, Ministry of Housing and Infrastructure and Environmental Protection Authority. Both Dhanbidhoo Island Council and public are in favour of this project, although the newly elected council not fully acquainted with the project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. Operational stage impacts are mainly on climate change, groundwater contamination and on biodiversity. Since the proposed location for the IWMC is not practical in terms of transportation of waste and the need to develop an access road which will incur additional cost, it is recommended to consider alternative locations for the IWMC. Overall, the project will have positive impacts to the island community under supervised and effective management of the IWMC. . The EIA recommends to go ahead with the project and to develop the IWMC at a site that will not cause major loss of biodiversity or cause GHG emissions. It is strongly recommended to develop and implement and environmental management plan to maximise the benefits of IWMC and ensure sustainability of operations. Technical ReportItem Isdhoo Island waste management center environmental management plan(2017-10) CDE Consulting Technical ReportItem Mundoo island waste management center environmental management plan(2017-10) CDE Consulting Technical ReportItem Maamendhoo Island waste management center environmental management plan(2017-10) CDE Consulting
- «
- 1 (current)
- 2
- 3
- »