Environment - ތިމާވެށި
Browse
5 results
Search Results
Technical ReportItem Environment impact assessment for flood mitigation and reclamation works at Fares-Maathoda, Gdh Atoll(2013-02) Land and Marine Environmental Resources GroupThe non-technical summary outlines the findings of the Environmental Impact Assessment for the development of flood mitigation measures at Fares-Maathodaa in Gaafu Dhaalu Atoll in the South of Maldives. The island is susceptible to flooding due to storm surges and powerful swells and was one of the worst affected islands during the powerful swells which hit the Maldives in 2007, with the entire island of Fares and one third of Maathodaa being flooded. Hence the need for proper flood mitigation measures is crucial in order to ensure the safety of the community of the island during possible similar events which may occur in the future. The project proponent of this project is United Nations Office for Project Services, who were requested by United Nations Development Programme to provide support of developing a comprehensive coastal protection and drainage management support approach to the southern island of Fares-Maathodaa. This project is part of a climate change package from the Danish Government of about $10 million to UNDP. The bid for the provision of consultancy services for carrying out detailed designs for flood mitigating measures at Fares-Maathodaa Island was won by Lanka Hydraulic Institute Ltd (LHI) (and their local counterpart, Riyan Pvt Ltd) and UNI Consulting Services. After conducting a study at the site and undertaking numerical modeling of five engineering interventions which were then proposed to UNOPS and the Government of Maldives it has been decided to construct a continuous offshore breakwater structure of length 734 m, joining the headlands of Fares and Maathodaa on the southwestern side of the island. Physical modeling was then conducted on this option. The breakwater would be constructed using armour rocks of varying sizes and weights which have been chosen based on their ability to resist extreme wave conditions without significant displacement. The core of the breakwater will be filled with dredge material obtained from within the enclosed lagoon area. The project also involves the reclamation of the enclosed lagoon area of 191,700 m2, though this component will be carried out as a second phase of the project, within a short duration of completion of the breakwater construction. Details of this phase will be addressed in a separate report formulated prior to commencement of this project. The construction of the breakwater will be undertaken by UNOPS, while reclamation will be funded and undertaken by the Government of Maldives. Technical ReportItem Environmental impact assessment : wharf reconstruction and upgrading of the existing berthing facility and slipway at FSM Thilafushi plot(2013-03) Land and Marine Environmental Resources GroupThe slipway and berthing facility used by Fuel Supplies Maldives Pvt Ltd on Thilafushi is located on the northeastern side of the island. The facility has undergone extensive damage over the years and is also not sufficient to fully cater to the needs of the company. The proposed project involves the repair of the existing slipway and modification of seaward wharf of the plot. The seaward wharf will be extended by 311 and protected by sheet piles. The wharf will be designed to cater to vessels of 2000 tonnes (alongside berthing facility). The Slipway will be designed to cater for vessels of 200 tonnes. The project also involves reconstruction of the plot separating the wall from adjacent plot at the eastern side. The proponent of the proposed project is Fuel Supplies Maldives Pvt Ltd (FSM). Fuel Supplies Maldives, incorporated on 18th December 2000 is now a joint venture between State Trading Organisation (STO) and the Maldives National Oil Company (MNOC) formed with the main objective of streamlining fuel distribution in the country and to offer easy and convenient access to fuel throughout the country (FSM website, accessed March 2013). The total estimated cost of this project is ME 1.5 million. This document presents the findings of an Environmental Impact Assessment (HA) for the repair of the existing slipway and modification of seaward wharf of the plot used by ESM Pvt Ltd in Thilafushi. Developers of such development projects are required to carry out EIA. studies under the Environmental Act of Maldives. The developer is required to obtain approval of the Environmental Protection Agency (EPA), prior to the implementations of any development activities on the island. Land and Marine Environmental Resources Group Pvt Ltd have been engaged by FSM Pvt Ltd to prepare the EIA and to provide assistance in other environmental related activities. This HA is prepared in accordance with Environmental Impact Assessment Regulations 2012 and the environmental policy and guidelines of the Government of Maldives. Technical ReportItem Environmental impact assessment for the development of MNDF coast guard base and berthing facility phase 1- reclamation works, Uthuruthilafalhu, North Male’ Atoll(2013-03) Land and Marine Environmental Resources Group Technical ReportItem Environmental impact assessment for construction of sand filled deck at Bandos Island Resort and Spa(2013-03) Land and Marine Environmental Resources GroupThe non-technical summary outlines the findings of the Environmental Impact Assessment of the proposed construction of a sand filled sun deck on Bandos Island Resort and Spa, by the resort management as the proponent of the project. Bandos Island Resort and Spa located in Nort The project involves the construction of a sand filled sun deck on the southern margin of the small harbour facility on the southwestern side of the island. The area is currently filled with rock and rubble which was excavated during the construction of the harbour facility. Hence by constructing the sun deck, the resort management is looking into making the area usable and aesthetically more pleasing to the eye. Sand for this project will be sourced from the harbour basin and additional material will be purchased should this not be sufficient. The sun deck would be protected by a seawall constructed using sand/cement bags with a smooth cement finish. The total estimated cost of this project is USD 00,000 including sand filling works and construction of revetment walls. Key impacts, mitigation measures and alternatives Impacts on the environment from various activities of the project development work (constructional impacts) and post constructional impacts have been identified through interviews with the resort management team, field data collection and surveys and are also based on past experience of consultant in similar development projects. Impact analysis was done using the Leopold matrix. The main impact associated with the project is minor short term impact on the marine ecosystem quality of nearby areas (to burrow area) due to sedimentation (as a result of dredging activities). No negative impacts on the environment are expected during the post constructional phase, although a huge positive impact in terms of the utilization of an area which has been impacted and unusable is guaranteed. Mitigation measures have been discussed for the construction stage of the project. The main mitigation measure proposed is the construction of a bund and seawall around the area for sundeck construction prior to backfilling the area, in order to avoid release of fines and minimize sedimentation impact. Detailed mitigation measures are discussed in Section 11 of the report. Given the small scale of the project the only component for which an alternative has been considered is in terms of the material used to construct the sea wall. The - option has also been considered, though this would mean that the area remains unusable and filled with rock and rubble. It also means that there would be no impact on the environment from development of this project. The proposed development is assessed to bring minor short term impacts to the environment in general. Hence the "no-project" scenario is not seen as a feasible option and it is the conclusion of the consultant that the project can be carried out with minimal impact on the environment, with the proper implementation of mitigation measures discussed in the report. Technical ReportItem Initial environmental evaluation (IEE) : dive centre jetty construction at Guraidhoo, South Male' Atoll, Republic of Maldives(2011-03) Land and Marine Environmental Resources GroupWater proof Sports limited (a UK based company in association with Mr. Jalaal (resident of Guraidhoo, south Male atoll has proposed to establish a professional dive and water sports centre at Guraidhoo. The proposal has been submitted to the government of Maldives for development approval. Land has been leased to the developer at Guraidhoo after assessment of the proposal by the Ministry of Home affairs and, province office and island office respectively. A copy of the proposal is given in appendix 1 as reference. Copy of the lease permit for the construction of the dive school is provided in Appendix 2. As part of the infrastructure associated with the dive school, a small size jetty dedicated to the dive school has been proposed to develop by the proponent. Coastal development structure such as jetties are required to submit an environmental impact assessment report as specified in the EIA regulation of Maldives that came effective in 2007. A scoping meeting to agree on the terms of reference was held at EPA on 29th December 2010. Based on the description of components project at the scoping meeting it was agreed among the stakeholder that a full EIA would not be required for the project. This was based on the small scale of the project and also its related impacts based on the environmental setting and location of the project. It was decided that an Initial Environmental Evaluation would be sufficient. This Initial Environmental Evaluation (IEE) report thus fulfils the requirements specified in the Terms of Reference (ToR) prepared for this project as output of the scoping meeting held at EPA between EIA consultant, proponent, representatives from EPA and other relevant stakeholders. In preparing the report consideration has been given to cover the environmental requirements that need to be covered by EIA regulations giving due consideration to the scale, location and usage of the project and its outputs. The Terms of Reference to the project is approved by EPA on 9th January 2011. A copy of ToR is given in Appendix 3. This IEE was based on the fieldwork visit by the consultant to Guraidhoo (project site) in January 2011 to collect site specific information on the project and qualitatively assess the environmental components that would be affected from the implementation of the project.