    Environmental impact assessment for the proposed agriculture project in Funadhoo, Gaafu Alifu Atoll
    (2017-09) Musthafa, Amir; Wahhab, Mahfooz Abdul; Adam, Rashihu
    The proposed project is to undertake an Agricultural Project located in the island of Funadhoo in North Huvadhoo Atoll at 0°33’42.85” N and 73°31’33.83”E. The nearest airport is Koodoo airport approximately 20km north of Funadhoo. This Environmental Impact Assessment (EIA) report has been prepared in order to meet the requirements of Clause 5 of the Environmental Protection and Preservation Act of the Maldives to assess the impacts of the proposed Agriculture Project in GA. Funadhoo. The main components of the project include: creating accessibility to the island, Vegetation clearance, setting up utilities, harvesting local produce, and livestock farming. Currently, about 90% of fruits and vegetables are imported from overseas to the Maldives. The majority of this food are transported to the tourist resorts and a major portion of the remainder is used by the people of Male’, Hulhumale’, Villingili and nearby islands. The quality of the fruits and vegetables which reaches the atolls is therefore, compromised and not adequate for the population in terms of quality and volume. Therefore, there has always been great need to improve on this condition. As such, one of the main objectives of this project is to meet the needs of the local communities. Interms of harvesting and growth, based on the available land, the growing area will be allocated in a manner which has minimal effects on the natural habitat and trees to effect minimum interruption. One hectare will be designed with net houses to grow most vegetables, such as cucumber, chili, tomato, capsicum and sweet melon. In addition to that, availability of affordable fruits and vegetables to the local communities in Huvadhoo Atoll will be a priority. Goods will be produced using locally available fertilizers in order to promote healthy vegetables and fruits. Another eight hectares will be used for open growing such as coconut trees, banana, papaya, pumpkin, and sweet potatoes. A two hectare area will be allocated for facility development as well as maintaining livestock. This will help to maintain a naturally fertile land and make fresh meat available in the local area. A 30kVA gensets will be established at the project site in the powerhouse, along with Two 5kVA gensets. A 10 ton RO plant will be placed in the island along with a 6 ton plant for back up. 3 septic tank systems will be put in place as sewerage system. A rainwater collection system for building roofs would be built to subsidize and support the water production facility. A micro sprinkler system will be laid along the farm for irrigation purposes. Disease control and quarantine facilities will be in place. The project is expected to be completed in 12 months. Regarding existing environment, there are no declared environmentally sensitive areas on Funadhoo island. 9 different types of vegetation species were found on Funadho during the survey. Majority of the mature trees in the island were Screw pines, typical coastal vegetation and coconut palms. It is expected that about 30 to 40 percentage of vegetation will be removed as part of the works. However, coastal vegetation will not be removed and a 20m buffer area will be maintained. The island undergoes erosion on the eastern oceanward side, although a substantial beach could be found on the western atollward side. Groundwater quality of the island was surprisingly poor, with large number of coliforms. Eastern lagoon was covered with seagrass beds, while the seagrass beds were present only near the coast on the Western side. It was observed that the Eastern lagoon was shallower compared to the Western side, having less than 1m at low tide. The results of the surveys show that 49.9% of the western reef was composed of rock with only 1.6% live corals, and limited number of target fish were observed. The legal framework for the project includes existing policy are regulation with respect to any development sensitive to the environment such as the EIA regulation, regulation on cutting and uprooting trees, Environment protection and preservation act, regulation on coral mining, waste management regulation, dredging and reclamation regulation, etc. In addition to these, there are agriculture specific regulation and guidelines, such as the Agriculture policy, general regulation for food establishment, etc. One of the most important set of guidelines with respect to the project is the Maldives Good Agriculture Standards, which has been recently formulated. While it is not mandatory to conform to the standards currently, the study strongly emphasises on its importance and recommends its incorporation to the project. Impact evaluation is undertaken by standard accepted methods. General impacts from development in uninhabited islands exists for the development such as those including vegetation removal and marine dredging, which has been noted among the more important ones. General mobilisation and setup impacts are also there, in addition to establishing and operating utilities in the island. Waste management in a secluded island such as this is important. More specific impacts occur due to handling and using chemicals and fertilizers, animal and pest control, and harvesting procedures. Mitigation measures are given for each impact. Vegetation removal is unavoidable. However, it is recommended to transplant larger trees as much as possible, and to utilise green waste as compost for the facility. Marine dredging impacts are likewise unavoidable. But the harbour is designed in such a way as to minimise the long term impacts. With regards to agricultural practices, it is strongly recommended to follow the Maldives Good Agricultural Practices. Alternatives for the project includes assessment of the no project option as per usual where the need for the project is discussed at length. It is concluded that the no project option is not viable at this stage. Other alternatives such as those for the project site, harbour area, water source, sewage options, and energy source has been discussed. The project has proposed the most simple and commonly used sources and it is recommended to proceed with these for the time being, while the harbour has been designed in the most environment friendly manner possible. Stakeholder consultations were carried out with different government authorities in addition to respective councils. The councils were generally supportive of the project. However, they all unanimously stated that they recommend more involvement of the island communities in development such as these. The government authorities expressed concern with respect to projects such as these and the agricultural industry of the Maldives in general. Monitoring program has been proposed as per usual. It is recommended to carry out annual monitoring even after the construction works have been completed. Important monitoring parameters include groundwater monitoring, marine water, marine life, shoreline, product water, general health and safety at site, etc. One of the key points with regards to impacts is, the scale/magnitude of works will be much less compared to other types of development which takes place in uninhabited islands such as airport developments or more typically, resort developments. The operation stage of the project will also be much more environment friendly than other developments. However, the main area of concern with regards to operation is apart from general good practices in maintenance and waste management, the use of fertilizers and chemicals. This can be regulated if it is ensured that the operation is in compliance with MGAP. In fact, the entire operation can be made sustainable once the operation fully conforms to the guidelines as provided by MGAP. Considering these factors and the great socio economic benefits the project will bring to the regional community, the project can be regarded to be environment friendly on a long term basis. With proper operating procedures as outlined in MGAP, mitigation measures as given in this study, and subsequent monitoring, it is recommended for the project to proceed as proposed.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for beach nourishment, Anantara Kihavah Villas, Baa Atoll, Maldives
    (2013-05) Zahid; Musthafa, Amir
    This report is based on the proposed beach nourishment works in Anantara Kihavah Villas, also known as Kihavah Huravalhi. The island is located in Baa atoll, 133 away from the Ibrahim Nasir International Airport in Hulhule’. Access to the island is mainly by sea planes. The operations of the resort island are under Anantara Hotels and Resorts, which is a renowned luxurious hotel group. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under the ‘Jadhuvalu R’ of the Environmental Impact Assessment Regulations 2012 of the Maldives. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions in an environmentally sound manner, thereby ensuring the environmental sustainability of the project. In order to ensure a uniform volume of beach is available all around the island for its guests throughout the year, the operators have started undertaking a biannual sand pumping operation in the island recently. Beach Nourishment works at Kihavah is carried out by pumping sand from the lagoon to replenish 250m length of the eroded shoreline on the SW side. The proposed program is a continuous process for Kihavah, in order to maintain beach area available throughout the year for its guests. The process is integral in maintaining guest satisfaction and the overall quality of the resort. Sand for the nourishment is obtained from the lagoon on the SW side of the island, 70m away from the shoreline. The borrow area is 100 – 150m away from the reef edge on the SW side of the island. Alternatives, including the no project option and alternatives for the project components have been given Alternative methods are proposed, such as use of Sand filled nylon bags laid side by side perpendicular to the shoreline in the form of temporary groynes. The groyne field is proposed to be relocated depending on the seasonal variation to the long shore sediment transport. Sand will be pumped to a small extent to fill the sand bags. Further alternatives such as the use of hard engineering structures are also given, such as, creations of near shore breakwaters, rock revetments and creating feeder headlands have been looked into, but not recommended to be implemented in this environment. The overall environmental impacts of the project have been assessed using frameworks found on literature and the results indicate that the proposed project has a net positive impact. However, there are some significant impacts on the environment during the construction phase of the project and these needs to be mitigated to avoid any significant damage to the environment. Significance of the impacts and mitigation measures has been provided based on previous similar projects undertaken in the Maldivian environment and based on literature. In general, soft engineering techniques, as used for this project are favourable to the environment and it is the wish of the operators that such techniques be employed as much as possible without resorting to hard engineering solutions. Furthermore, the minor negative impacts from the project will be localised to the small lagoon in which Kihavah is located. Since there are no other islands in the lagoon, there will be no impacts on any neighbouring communities. It is recommended to continue to monitor the impacts of the proposed project by regular monitoring of shorelines and near shore currents and the changing marine environment. A two stage monitoring plan is given, which recommends monthly monitoring during the 1st year and less frequent monitoring for the next 5 years. Undertaking the monitoring, along with the mitigation measures is necessary to ensure the sustainable development of the project with minimum harm to the environment. Beach nourishment is widely regarded as an environmentally friendly method to combat coastal erosion. It is thus recommended that given the positive socio economic and environmental impacts from the project far outweighs the few negative local impacts, and since the project has major socio-economic benefits, it is advisable to allow the project to proceed as proposed.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment : proposed 14 storey building construction in G. Hudhukoka, Male'
    (2018-01) Musthafa, Amir
    This report is based on the proposed 14 storey building construction at the residence, G. Hudhukoka in the capital city, Male’. The proponent is Mohamed Hassan Fulhu. The proponent has appointed the contractor, Caution Construction Pvt. Ltd. to undertake the construction works and project management including overseeing the EIA process. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under ‘Jadhuvalu R’ of the Environmental Impact Assessment Regulations 2012 of the Maldives. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions based on favourable environmental conditions with the main focus on sustainability. The project also adheres to several other rules and regulations in the Maldives and has obtained permit from the Ministry of Housing and Infrastructure for the project to proceed. The area the project is proposed to be undertaken is a moderately built area in central areas of Male’. There is no natural terrestrial environment at site. The existing environment therefore was focussed on the regional climate of Male’, and the traffic distribution, and noise pollution in the area. The project area endures heavy traffic. This is further exasperated due to limited space on the roads, resulting in frequent traffic jams. A general exterior overview of the existing structures in the area was also observed. It was found that most of the buildings in the area were old structures and maybe prone to some damages. A more detailed assessment was undertaken in 2013, and there is no major difference visually in the past 4-5 years. Serious structural defects are expected to be at a minimum, especially considering the standard foundation protection methods. The overall environmental impacts of the project have been assessed using frameworks found in literature. Since the development is undertaken in a moderately built area, the results indicate that the proposed project has neutral impact. However, there are some significant impacts on the environment during the construction phase of the project and these needs to be mitigated to avoid any significant damage to the environment. Significance of the impacts and mitigation measures have been provided based on previous similar projects undertaken in Male’ and based on literature. A cause for concern regarding this project is the impact it will have on neighbours residing in this area. As such, several short-term impacts are envisaged including air pollution, noise pollution, aesthetic impacts, traffic issues and safety concerns. As there are numerous high storey building projects being undertaken in Male’, there is no particular long term impact associated with this project, albeit an increase in cumulative impacts. The main reason an EIA was required for the project was due to the height of the building, which consequently results in a large population living in the same ecological footprint. The notable impacts that do occur can be easily mitigated to minimise and/or completely nullify them. Mitigation measure proposed includes creating awareness among the construction staff and neighbours regarding the scope of the project. Other measures include taking protective measures to ensure people residing and utilising the vicinity will not have to endure the impacts during the construction stage. Foundation protection measures are recommended and are provided as part of the project to prevent impact on neighbouring structures in addition to a 1m offset from the adjacent building. Dewatering procedure also needs to be undertaken with care, details of which are given in the report. Care should also be taken to prevent any damage to the road and disruption to traffic during transport of machinery and equipment. Alternatives, including the no project option and alternatives for some project components are also discussed. No project option is not viable, as construction is taking place in the owners only currently available land. Regarding construction methodology, a few alternatives are recommended. Regarding the design, there are recommendations to make the development greener. These include interior landscaping to incorporate plants, use of green walls, use of LED lights, rooftop solar panels, etc. An environmental monitoring program is provided at the end of the report, which provides details on the parameters to monitor on site, and the frequency in which it needs to be done. Monitoring can be undertaken successfully by incorporating environmental monitoring in building maintenance setup. Estimated costs for the monitoring works are provided. Implementation of the program is essential for the sustainable development of the project. In conclusion, it is discussed the impact such major housing projects have for the increasing population density in Male’, and how it can be prevented at a policy level. However, as is the case for all similar projects, taking this project as a standalone development project in an already heavily built island city, it can be concluded that no significant long-term impacts are predicted, none that the island community is not yet enduring. It is thus recommended that given the positive socio economic impacts from the project far outweighs localised negative impacts, it is advisable to allow the project to proceed as proposed.