Environment - ތިމާވެށި
Browse
20 results
Search Results
Technical ReportItem Environmental impact assessment for road development project at R. Dhuvaafaru(2016-10) Water SolutionsThis report discusses the findings of a social and environmental impact study undertaken by Water Solutions Pvt. Ltd. at the request of Ministry of Housing and Infrastructure. This EIA report covers road development project at Dhuvaafaru, Raa Atoll. This project would undertake total length of the roads that would be 3.2 km. The roads will be built with pavements on either side of the roads on wider roads. A pavement will be one side on narrower roads. The pavements would have 3 service ducts which can be used for provision of the utility services to the island. The surface of the pavements will be of precast concrete blocks and driving surface would be of asphalt. Drainage areas are provided between pavement and driving surface and provision for tree planting is given on regular intervals. Dhuvaafaru is one of the islands in a group of islands that government has selected to undertake the road project implemented by Ministry of Housing and Infrastructure. Dhuvaafaru is the most populated island in Raa Atoll. After the 2004 Tsunami R. Kandholhudhoo people was relocated to Dhuvaafaru in 2008. Road Development project is implemented at islands where there is a huge demand for residential and commercial land. The proposed project would help to improve the living condition of the island and facilitate the focus island development at the selected island. Environmental and socioeconomic impacts of the project were assessed. The road developed and associated work with the project would have significant impacts on the island of Dhuvaafaru. The impacts of the project result mainly from vegetation removal and excavation of the harbour basin and beaching area to borrow the backfill material to level the road surface and levelling work carried out at the roads. The impact of the excavation activities would be of sedimentation. This impact is considered to be minor and short-term. The implementation of the project and paving the road surface would have socio-economic benefits to the island. The socio-economic benefit outweighs the negative impacts of the project on the physical environment of the Dhuvaafaru. Mitigation measures for these anticipated impacts have been identified and outlined in detail, including sedimentation control methods and measures for minimizing negative effects of generation of waste. These mitigation measures will have to be followed in order to minimize environmental damage. The details of the project have been established based on the landuse plan that had been developed for Dhuvaafaru. Alternative designs and technologies have been investigated for the different components of the project. However, the present project design seems to be a feasible option in terms of costs, durability and safety. An environmental management plan with environmental monitoring has been developed including the most important elements that require regular checks. This monitoring component need to adhere to and would allow assessing the changes due to the road development project. Although the project involves inevitable negative environmental impacts, such impacts are predicted to be not severe as to not undertake the project in accordance with the landuse plan developed for the island. The project is justifiable in light of the socio-economic conditions and anticipated benefits resulting from the project, which seem to outweigh the negative environmental impacts. Technical ReportItem Addendum 2 environmental impact assessment for the reclamation and expansion at Ibrahim Nasir International Airport, Hulhulhé, Kaafu Atoll(2015-09) Water SolutionsThis report discusses the findings of an addendum that carried out for the environmental impact study (EIA) which was carried out by Water Solutions Pvt. Ltd. at the request of Maldives Airports Company Limited in July 2014. This EIA Addendum 2 report covers for changes that had been made to the reclamation component of the Ibrahim Nasir International Airport (INIA) expansion project. The report also covers proposed 7.1 m wide road development on southern end of the island and development of a 4.84 km sewerage collection, treatment and disposal system via 495m ocean outfall as part of the Ibrahim Nasir International Airport expansion and modernisation project. Refer to the Environmental Impact Assessment for the Proposed Expansion and Reclamation at Ibrahim Nasir International Airport (2015) for the details of the project. This EIA report has been approved by EPA. It is not seen that any significant environmental impacts would be due to the changes that had been brought to the reclamation component, addition of the road and sewerage system as part of the development, other than those outlined in the Environmental Impact Assessment for the Proposed Expansion and Reclamation at Ibrahim Nasir International Airport (2015). The project involves inevitable negative environmental impacts to the natural environment of the island. Technical ReportItem Environmental impact assessment for the construction of a harbor in Filladhoo, Haa Alifu Atoll, Maldives(2016-12) Water SolutionsThis report discusses the findings of environmental impact study undertaken by Water Solutions Pvt. Ltd. upon request from Ministry of Housing and Infrastructure for the proposed harbour development project in HA. Filladhoo. HA. Filladhoo is located on the eastern rim of Haa Alifu atoll and has a population of 576 (Census, 2014). Majority of the island community depend on fishing and agriculture as their main economic activity. Until now, the island has no modern harbour facility and is one of the most crucial issues faced by the island community. This project is initiated by the government of Maldives as part of its national programme to provide safe harbour to each and every inhabited island of Maldives. Presently, lack of a harbour is an obstacle for the economic expansion and diversification of the island. Lack of a harbour in Filladhoo has many developmental obstacles for the island. At present the only way to access the island is by means of jetties on the west side of the island. For mooring the vessels, fisherman and other vessel owners use deep lagoon areas of the island. The construction of the harbour includes the following: Construction of 312 m quay wall on inner side and both ends of the harbour using T-shaped concrete blocks. Deepening the harbour basin to 3 meters at mean sea level. Dredging of the harbour basin which is 650 feet long and 250 feet wide. Construction of 298 m long breakwater with rock boulders. Reclamation of the area between the harbour and shoreline and both sides of the harbour by using dredged material from the harbour basin. Dredging of an access channel to a depth of 3 meters at Mean Sea Level (MSL). Construction of 5m wide pavement along the quaywalls. Construction of revetments to protect the proposed reclamation areas. Clearance of an access road to the harbour. Road length is approximately 345m and 14m wide. The dredging work for the project is expected to generate around 50,000 m3 of dredged material. The dredged material will be used for reclamation and road levelling purpose. The proposed project is therefore geared towards developing a third generation harbour on the south west side of the island with an entrance channel and breakwaters to protect the harbour basin. The harbour is expected to ease many of the challenges faced by the islanders, especially for the vessel owners, as safe mooring will be guaranteed. As this is a completely new development, significant negative impacts on the island marine environment will be felt through permanent habitat modification and direct destruction of the marine environment. Indirect impacts can also be felt on the mangrove area of Filladhoo without proper measures. Similarly, the coral reef and lagoon area will be directly and indirectly impacted for this project. As the same time, the socio-economic impacts of this project will be significantly felt on a very large scale and not necessarily for the islanders only. In such projects, environmental damage cannot be avoided and hence the goal should be to undertake the works in the most least damaging manner. As a large area of the marine and coastal environment will be affected, careful implementation of the mitigation measures and adopting methods which minimizes the damage will be the key for this project. Most of these measures are the best practice guidelines and protocols that does not require large finances to implement. Stakeholder consultations were held with various groups including island council and the client in order to incorporate the socio-economic components in the project. Stakeholders, most importantly the island community representatives were the most significant as they have the maximum knowledge and experience from the daily difficulties faced due to lack of a harbour. The development of the harbour in Filladhoo will have significant environmental impacts to the island, most of which will be felt on the coastal and the marine environment. The project takes place in an environment that has not been modified or damaged previously. However, natural erosion of the island has been affected to the area of the island. Social impacts of this project will be significant and will benefit the community as well as the region. The development of a harbour in Filladhoo is expected to bring many beneficiaries to island community. Proposed mitigation measures need to be taken to minimize or avoid the proposed impacts. Proper measures need to be taken to protect and preserve the mangrove area near the harbour location. Although the project involves inevitable negative impacts, the project is justifiable in light of the socioeconomic conditions and anticipated benefits resulting from this project. Technical ReportItem Environmental impact assessment for the proposed agriculture development project at Lh. Lhohi(2016-08) Water SolutionsThis report discusses the findings of a social and environmental impact study undertaken by Water Solutions Pvt. Ltd. at the request of Frozen Lemons Pvt Ltd. This EIA report covers agriculture development project at Lhohi, Lhaviyani Atoll. Lhohi is located on the southern side of Lhaviyani Atoll. This island is leased to Frozen Lemons Pvt Ltd by Ministry of Fisheries and Agriculture. Frozen Lemons is the proponent of this project. Frozen Lemons had acquired substantial knowledge and information about commercial agriculture and officials of the company had travelled to neighbouring countries and visited different agriculture projects to gain more experience and information on different agriculture businesses which could be development in islands of Maldives. The project is proposed in Lh. Lhohi. The vision is to establish agriculture in Lhohi which ensure commercial and environmental sustainability. The main aim of this agricultural project is to lessen import of agriculture products to meet the local demand. Work is planned for sustainable agrofarming ensuring the use of environment friendly technology. Under this project, fertilizers will be made using the waste on the island itself and different types of fruits and vegetables will be grown. Agriculture on the island will be done in three main ways. It will be done directly on land, in greenhouses and using hydroponic technology. Water for the crops will be of two sources: harvesting rainwater and desalination using seawater. The Drip Irrigation System will be used for water conservation and will be the main system for watering the plants. The project will develop the necessary infrastructure in the area of power, water, sewage and wastewater to make the proposed agriculture project sustainable. The project also involves developing accommodation and living areas for the researchers and famers on the island. The EIA was undertaken to assess the environmental and social impacts of this project. Based on the assessment, it has been identified that the major impacts of the project will be felt on the terrestrial environment. Lhohi is not a large island that has been included in the EPA’s Environmental Sensitive Areas list due to the small mangrove ecosystem found on a small area of the island. The development on the island would be carried out by leaving a buffer from the mangroves areas. This would significant reduce the impacts on the mangroves found the island due to the proposed agriculture development on the island. Moreover, there will be impacts on marine environment from jetty constructions. During the operational stage, environmental concerns are much less and are associated with energy, water, and waste and wastewater management. The mitigation measures are provided in the report with alternatives. It is vital to conduct the activities, during both construction and operational stage, in line with mitigation measures emphasized in the report. Socio-economic impacts of the proposed project will be creation of job opportunities in the atoll and development of the agricultural industry in the country. This project will create enormous economic opportunities both in the construction and operational stage through creation of both short-term and permanent jobs and business opportunities especially for the locals at Kurendhoo. This project will introduce and promote the development of agriculture production systems on commercial scale enabling Maldives to provide additional avenue for employment and income generation. Towards the end of the report, a monitoring programme has been suggested which covers components of terrestrial, coastal and marine environment. It is important to follow this monitoring programme not only to comply with the regulation but also to ensure that the impacts are measures in realistic terms. Technical ReportItem Addendum to the environmental impact assessment for the harbour development at Kelaa, Haa Alifu Atoll, Maldives(2016-03) Water SolutionsThis report is an addendum to the EIA for the harbour development project at HA. Kela carried out in 2015 based on the change of the scope of the project. This addendum to EIA has been undertaken by Water Solutions Pvt. Ltd. at the request of Ministry of Housing and Infrastructure for the change of scope to the harbour expansion and redevelopment project at HA. Kela. Refer to the EIA for the harbour development project at HA. Kela (2015) for the details of the harbour development project at HA. Kela. Ministry of Housing and Infrastructure awarded the harbour development contract to Capital Investment and Finance Limited. Capital Investment and Finance Limited recommended Ministry of Housing and Infrastructure to expand the harbour to east than to west as this would reduce the breakwater development cost of the project. Ministry of Housing and Infrastructure in consultation with Kelaa Island Council and Kelaa Island Community agreed to expand the harbour expansion to east of the exiting harbour. The main change to scope of the project is to expand harbour to east of the existing harbour. Additionally, it is proposed to extend the breakwater by 15 m on north eastern side as protection measure to protect the area which would be reclaimed as part of the project. The new harbour expansion would allow to reuse the existing quay wall blocks which is located on north eastern side of the harbour. EPA has granted an approval to carry out the required dredging and reclamation associated with the harbour development at the island with the revised harbour design. Environmental impacts due to the changes to scope of the harbour development project at Kelaa have been assessed. The impacts on the island due to the extending the harbour to east and extending the length of breakwater to north east would not be significant as those identified in the EIA for the harbour development in HA. Kelaa (2015). The impact of excavation would be that of sedimentation. This impact is considered to be minor and short-term. Excavation would have irreversible impacts. Reclaiming the adjacent area north east of harbour would improve the condition of beach on this side of the island. Moving the harbour extension from west to east would help to keep the huge beach on western side of the island keeping the identity of the island. The changes brought to the scope of the project conform to prevalent environmental legislation. Mitigation measures for these anticipated impacts have been identified and outlined, including sedimentation and stagnation control methods. These mitigation measures need to be followed in order to minimize environmental damage. The project scope has been changed considering the needs and requirements of the community by consulting members of the Island Council and Island Community. The EIA Addendum also allowed to explore alternatives for the changes brought to the project and identified key mitigation strategies. Alternative locations and alternative designs have been investigated for the harbour development. However, the present project design seems to be an acceptable the island council and island community. Technical ReportItem Environmental impact assessment the road development project at ADH. Mahibadhoo(2015-10) Water SolutionsThis report discusses the findings of a social and environmental impact study undertaken by Water Solutions Pvt. Ltd. at the request of Maldives Road Development Cooperation. This EIA report covers road development project at Mahibadhoo, Alifu Dhaalu Atoll. This project would undertake total length of the roads that would be 2.9 km. Mahibadhoo is one of the islands in a group of islands that government has selected to undertake the road project implemented by Ministry of Housing and Infrastructure. Road Development project is implemented at islands where there is a huge demand for residential and commercial land. The proposed project would help to improve the living condition of the island and facilitate the focus island development at the selected island. Environmental and socioeconomic impacts of the project were assessed. The road developed and associated work with the project would have significant impacts on the island of Mahibadhoo. The impacts of the project result mainly from vegetation removal and excavation of the harbour basin to borrow the backfill material to level the road surface and levelling work carried out at the roads. The impact of the excavation activities would be of sedimentation. This impact is considered to be minor and short-term. The implementation of the project and paving the road surface would have socio-economic benefits to the central region of the Maldives. The socio-economic benefit outweighs the negative impacts of the project on the physical environment of the Mahibadhoo. Mitigation measures for these anticipated impacts have been identified and outlined in detail, including sedimentation and stagnation control methods and measures for minimizing negative effects of generation of waste. These mitigation measures will have to be followed in order to minimize environmental damage. The details of the project have been established based on the landuse plan that had been developed for Mahibadhoo. Alternative designs and technologies have been investigated for the different components of the project. However, the present project design seems to be a feasible option in terms of costs, durability and safety. An environmental management plan with environmental monitoring has been developed including the most important elements that require regular checks. This monitoring component need to adhere to and would allow assessing the changes due to the road development project. Although the project involves inevitable negative environmental impacts, such impacts are predicted to be not severe as to not undertake the project in accordance with the landuse plan developed for the island. The project is justifiable in light of the socio-economic conditions and anticipated benefits resulting from the project, which seem to outweigh the negative environmental impacts. Technical ReportItem Environmental impact assessment for the harbour development at Omadhoo, Thaa Atoll, Maldives(2016-03) Water SolutionsThis report discusses the findings of environmental impact study undertaken by Water Solutions Pvt. Ltd. upon request from Ministry of Housing and Infrastructure for the proposed harbour development project in Th. Omadhoo. Th. Omadhoo is located on the southern rim of Thaa atoll and has a population of 456. Majority of the island community depend on fishing as their main economic activity. Until now, the island has no harbour facility and is one of the most crucial issues faced by the island community. This project is initiated by the government as part of its national programme to provide safe harbour to each and every inhabited island of Maldives. Presently, lack of a harbour is an obstacle for the economic expansion and diversification of the island. Lack of a harbour in Omadhoo has many developmental obstacles for the island. At present the only way to access the island is by means of a damaged jetty on the north side of the island. For mooring the vessels, fisherman and other vessel owners use deep lagoons within the island reef system. In rough weather, getting in out of the island is almost impossible. Some of the vessels have to go to a nearby harbour for mooring in unfavourable weathers. This is the dilemma the islanders have faced until now. The construction of the harbour at Th. Omadhoo includes construction of a quay wall on inner side and both ends of the harbour using T-shaped concrete blocks, deepening the harbour basin to 3 meters at mean sea level, dredging of the harbour basin which is 500 feet long and 250 feet wide, construction of 563 feet long breakwater with rock boulders, reclamation of the area between the harbour and shoreline by using dredged material from the harbour basin, reclamation of area east of harbour, dredging of an access channel to a depth of 3 meters at Mean Sea Level (MSL). The dredging work for the project is expected to generate around 28,462 m3 of dredged material. The dredged material will be used for reclamation purpose. A 563 ft long seawall would be constructed on western side of the area which would be reclaimed between harbour and the island to protect the reclaimed area from erosion. The project also include construction of 146 ft seawall at the area which is presently used to access the island. The proposed project is therefore geared towards developing a third generation harbour on the north side of the island with an entrance channel and breakwaters to protect the harbour basin. Since, the harbour is proposed to be constructed on the lagoon, the area between the harbour and island shoreline will be reclaimed using the dredged material from harbour basin. The harbour is expected to ease many of the challenges faced by the islanders, especially for the vessel owners, as safe mooring will be guaranteed. A detail environmental assessment was undertaken for this project and the findings are reported in this EIA. This EIA has been prepared to assess the social and environmental impacts of this proposed project. As this is a completely new development, significant negative impacts on the island marine environment will be felt through permanent habitat modification and direct destruction of the marine environment. Similarly, the coral reef will be directly and indirectly impacted for this project. As the same time, the socio-economic impacts of this project will be significantly felt on a very large scale and not necessarily for the islanders only. In such projects, environmental damage cannot be avoided and hence the goal should be to undertake the works in a least damaging manner. As a large area of the marine and coastal environment will be affected, careful implementation of the mitigation measures and adopting methods which minimizes the damage will be the key for this project. Most of these measures are the best practice guidelines and protocols that does not require sting financially to implement. Stakeholder consultations were held with various groups including island council, island community, Ministry of Housing and Infrastructure and Ministry of Environment and Energy in order to incorporate the socio-economic components in the project. Stakeholders, most importantly the island community representatives were most significant as they have the maximum knowledge and experience from the daily difficulties faced due to lack of a harbour. Alternative locations and alternative designs have been investigated for the harbour development. The development of the harbour in Omadhoo will have significant environmental impacts to the island, most of which will be felt on the coastal and the marine environment. The project takes place in an environment that has not been modified or damaged previously. However, natural erosion of the island has been affected to the southern area of the island. The biggest threat to the islands when a harbour is developed is the disruption it causes to natural movement of the beach. Social impacts of this project will be significant and will benefit the community as well as the region. The development of a harbour in Omadhoo is expected to bring many beneficiaries to island community. Although the project involves inevitable negative impacts, the project is justifiable in light of the socioeconomic conditions and anticipated benefits resulting from this project. Therefore, it is justifiable to undertake the project. Technical ReportItem Environmental impact assessment for the proposed Blue’s 300 apartments at Hulhumalé(2014-08) Water SolutionsEIA report has been prepared to assess the environmental and social impacts of constructing 300 housing units at Hulhumalé of Kaafu Atoll. This project will be implemented by Noomadi Resort & Residences Anstalt for Maldives Police Services. The land areas identified for the housing project has no major tree and hence there will be no tree clearing as part of the project. The project is part of the Government commitment to provide affordable housing to people of the Maldives. The project aims to build 300 housing units which can accommodate 300 families of Maldives Police Service. All activities of the project will be closely monitored by site supervisors to be identified by Noomadi Resort & Residences Anstalt. This is mainly to avoid any environment and social issues. A close relationship and open communication need to be established to avoid any future disagreements and social issues during execution of the project work with the Hulhumalé community. The most significant impacts of the project will be resulting from the construction waste that would be generated as part of the project. As a mitigation measures, construction waste would be managed in accordance with the waste management guidelines issued by Environmental Protection Agency. The construction waste generated at the island would be collected and temporarily stored at designated area. The collected waste then will be transported to Thilafushi for final disposal. This report will highlight major findings and predicted impacts of the proposed housing project. The report is developed in consultation with project proponent and in accordance with Environmental Impact Assessment Regulation. An environmental management plan with environmental monitoring has been developed including the most important elements that require regular checks. This monitoring component need to adhered to and would allow to assess the changes due to the implementation of the project. Although the project involves inevitable negative environmental impacts, such impacts are predicted to be not severe as to not undertake the project in accordance with the master plan. The project is justifiable in light of the socio-economic conditions and anticipated benefits resulting from the project, which seem to outweigh the negative environmental impacts. Technical ReportItem Environmental impact assessment for the proposed SIFCO apartments at Hulhumalé(2014-11) Water SolutionsThis EIA report has been prepared to assess the environmental and social impacts of constructing 300 housing units at Hulhumalé of Kaafu Atoll. This project will be implemented by NOOMADI Resorts and Residences Anstalt for Maldives National Defence Force. This report highlighted major findings and predicted impacts of the proposed housing project. The report is developed in consultation with project proponent and in accordance with Environmental Impact Assessment Regulation 2012 and Environmental Protection Agency. The land areas identified for the housing project has no major tree and hence there will be no tree clearing as part of the project. The project is part of the Government commitment to provide affordable housing to people of the Maldives. The project aims to build 300 housing units which can accommodate 300 families of Maldives National Defence Force. Under this project have two bed rooms and three bed rooms would be developed. The project would be implemented at Lot No: 11490, 11491 and 11492. The total plot area for the developed is 4,922.22 m2. The total area that would be allocated for the residential use would be 44,989.32 m2 and commercial use would be 3,819.43 m2. All activities of the project will be closely monitored by site supervisors to be identified by Noomadi Resorts and Residences Anstalt. This is mainly to avoid any environment and social issues. A close relationship and open communication need to be established to avoid any future disagreements and social issues during execution of the project work with the Hulhumalé community. The most significant impacts of the project will be resulting from the construction waste that would be generated as part of the project. As a mitigation measures, construction waste need be managed in accordance with the waste management guidelines issued by Environmental Protection Agency. The construction waste generated at the island would be collected and temporarily stored at designated area. The collected waste then will be transported to Thilafushi for final disposal by the contractor. An environmental management plan with environmental monitoring has been developed including the most important elements that require regular checks. This monitoring component need to be adhered and would allow to assess the changes due to the implementation of the project. Although the project involves inevitable negative environmental impacts, such impacts are predicted to be not severe as not to undertake the project in accordance with the Hulhumale development master plan. The project is justifiable in light of the socio-economic conditions and anticipated benefits resulting from the project, which seem to outweigh the negative environmental impacts. Technical ReportItem Environmental impact assessment for the reclamation and expansion at Ibrahim Nasir International Airport, Hulhulhé, Kaafu Atoll(2014-07) Water SolutionsThis report discusses the findings of an environmental impact study (EIA) undertaken by Water Solutions Pvt. Ltd. at the request of Maldives Airports Company Limited. This EIA report covers for reclamation and Ibrahim Nasir International Airport (INIA) expansion project. The reclamation component is to reclaim additional 86 hectares of land at Hulhulhe and undertake coastal protection. The eight hundred and sixty five thousand cubic meters of the fill materials for the reclamation would be borrowed using Trailing Suction Hopper Dredger (TSHD) from borrow sites to be identified by dredging contractor. Reclaimed land would be projected with 9,483 m of coastal protection using various materials. The INIA expansion component includes development of second runway east of existing runway, development of a new terminal building on western side of the island and creation of a new fuel farm. The Ibrahim Nasir International Airport is located on the Hulhulé Island which is formed on a large reef in the south eastern side of North Malé Atoll. The Hulhulé Island was reclaimed and constructed in year 1964 for creation of airport and now services the majority of visitors to Maldives. Hulhulé Island is located at about 6km North-East of Male’. Hulhumalé and Farukolhufushi islands are also located in the same reef system. The expansion and modernization Project will increase both the number and efficiency of the aircraft gates, and increase and reallocate the terminal building to achieve higher effective capacity. The project aims at optimizing the airport landside and airside areas and thereby limiting the environmental impact. The sustainable designing approach is to have an efficient runways & taxiway system design along with modern architecture for the International Airport. Environmental impacts of the project were assessed. The reclamation of the shallow lagoon around Hulhulhe would have an impact on the marine environment of the island however, it is not seen that this would be an irreversible impact on the island environment. The impacts of the project result mainly from reclamation work result from sedimentation and changing morphology of the island. During dredging and reclamation activity, impact of sedimentation on inhabited islands, nearby resort and diving sites are a concern that needs to be addressed. The reclamation and coastal protection of reclaimed land would facilitate to undertake the expansion project at INIA. This project would have socio-economic benefits to the Maldives. The socio-economic benefit outweigh the negative impacts of the project on the physical environment of the Hulhulhe especially allowing more land to further expand and develop the island as a modern international airport. Mitigation measures for the anticipated impacts have been identified and outlined in detail, including sedimentation and stagnation control methods and measures for minimizing negative effects of generation of waste. These mitigation measures will have to be followed in order to minimize environmental damage. The details of the project have been established based on the physical development plan that had been developed for INIA. Alternative locations and alternative designs have been investigated for the different components of the project. Further studies need to be carried out to weigh whether the present project design is feasible in terms of costs, durability and safety. An environmental management plan with environmental monitoring has been developed including key elements that require regular checks. This monitoring component need to adhere to and would allow assessing the changes due to the reclamation of additional land at Hulhulhe lagoon. The project involves inevitable negative environmental impacts to the natural environment of the island. However such impacts do not prevent undertaking the project in accordance with the existing plan developed for the INIA. Detail studies need to be undertaken to have a clear understanding of the present condition of the environment and landuse patterns that could facilitate developing a master plan that would help to develop the airport expansion to meet and cater for the future demand.