Environment - ތިމާވެށި
Browse
95 results
Search Results
Technical ReportItem Environmental impact assessment report for Hulhumale’ swimming area and land based facilities development project(2010-03) Land and Marine Environment Resources group Pvt LtdThe non technical summary outlines the findings of the Environmental Impact Assessment of the proposed development of swimming track and associated land based facilities. The proponent of the project is Housing Development Corporation Plc. The proposed project involves development of a swimming track and associated land based facilities at the eastern side of Hulhumale. The swimming tracks will be 20m by 25m. The total length of both tracks is 50m. The plate form and access jetty will be constructed using floats. Land based area includes, restaurants, kitchens, food outlets, toilets, changing facilities and park (including a small children’s park) A scoping meeting to discuss the development proposal and determine the Terms of Reference (TOR) for the EIA report was held between the Client (Housing Development Corporation Plc), LaMer Group Pvt Ltd as the EIA Consultant, Ministry of Housing, Transport and Environment (water and sanitation section of EPA) and representatives from Environment Protection Agency (EPA) as the Regulator on 23rd November 2009. Data collection or field was carried out during January 2010 for assessment of existing environment. Since the scope of work of the proposed project is small, existing environment data was limited to reef health, general wave, tide condition and seawater quality assessment. The water quality assessment done at the proposed swimming track area revealed alarming levels of Enterococci levels which was probably due to high number of users and disregard to general hygienic values (showering before entry to water). Also it has to be noted that an outfall pipe is location near the swimming track area and this may have some level of leakage (although close inspection showed none. Alternatives are given for location of swimming track area, since contamination of seawater is major social impact. Assessing alternatives the location identified by HDC Plc during consultation with HDC seems to be a better candidate as a location for swimming track. Mitigation measures are discussed for the construction and operational stage of the swimming track area only. Technical ReportItem Post-tsunami infrastructure rehabilitation project : rehabilitation of 6 selected harbors : social and environmental impact assessment for the rehabilitation of the harbor in Makunudhoo island, Haa Dhaal atoll(2007-11) SOGREAH Consultants; Water SolutionsThis report discusses the findings of a social and environmental impact study undertaken by Water Solutions Pvt. Ltd. and SOGREAH consultants of France upon request from Ministry of Construction and Public Infrastructure. The project involves the rehabilitation of the existing harbour in Makunudhoo, Haa Dhaal Atoll with improved infrastructures. This project is initiated by the government of Maldives with funding from Agence Française de Dévelopement” (AFD) as part of the Tsunami rehabilitation programme. The harbour of Makunudhoo has been damaged to various extents and requires repair and upgrading, including deepening the harbour basin, and increasing slightly the size. A detail assessment of the environmental and social conditions was assessed based on which a rehabilitation project has been proposed. This EIA has been prepared to assess the social and environmental impacts of this proposed rehabilitation project. Major environmental impacts of the project have been identified as resulting mainly from dredging and disposal of dredged materials. Dredging will be undertaken in the harbour basin and to some extent in the access channel. In view of the assessment, the environmental damages to marine resources have not been considered major due to the limited boundary of the project and also due to confined nature of the project. The impacts are likely to be felt on an estimated 5% of the lagoon and reef‐flat of that extensive reef system. These environmental impacts were assessed for both construction and operation phase of the project. Mitigation measures for these anticipated impacts have been identified and outlined in detail, including sedimentation control methods and other measures. These mitigation measures will have to be followed in order to minimize environmental damage. Stakeholder consultations were held with various groups, including the community and the client in order to incorporate the socio‐ economic components in the project. The proposed rehabilitation plans for Makunudhoo has been prepared after considering the needs and requirements from the community by assessing and incorporating the outcomes from the extensive community consultations held during the data collection stage. It is inevitable that there would be some negative environmental impacts, especially when dredging is undertaken. However, these minor negative impacts out weight the socioeconomic benefits gained by rehabilitating the harbour. As a result, a comprehensive monitoring component has been suggested which takes in to consideration, the most important elements that require regular checks. This monitoring component will be adhered and will allow the assessment of long term changes, despite the limited nature of the impact. The most important consideration is the socioeconomic impacts that have been assessed mainly as positive in nature. Not only they are positive, but most importantly in the long term. Therefore, it appears justified from a technical and from an environmental point of view, to carry out the proposed rehabilitation project if the island is to absorb the economic gains achieved by the project. Technical ReportItem Environmental impact assessment : for the removal of seagrass beach replenishment activities in Herathera Island Resort, Addu atoll, Maldives(2010-09) CDE ConsultingThe Herathera Island has been experiencing seaweed overgrowth for a number of years, even before construction began on the island. Similarly, the island does not have a natural beach system which is suitable for a resort product. An attempt was made in 2007 and 2008 to remedy these shortcomings by removing seagrass and undertaking beach replenishment. Unfortunately, the beach replenishment design and implementation was flawed and new seagrass colonies have started to emerge. The island is currently is a worse condition, particularly its beach system. These environmental issues are decreasing the economic value of the tourism product being offered Resort and is reaching a point where the product may be unviable. Immediate action is required to address these issues, thus, a new and improved beach replenishment and seagrass removal programme. The proposed project involves the removal of sea grass colonies and beach replenishment. Details of the proposed project components are outlined below. a) Sea grass removal The primary component of the project is seagrass removal. Seagrass areas covering approximately 200,000 – 250,000 m2 is proposed to be cleared (see Site plan in Appendix B), 100,000 m3 of dredge waste. TwoEIA for the proposed Seagrass Removal and Beach Replenishment Activities in Herathera Island Resort Prepared by: CDE Consultancy Page| ix methods have been proposed for the project: 1) using a sand pump; 2) using an excavator and; 3) soft measures. b) Beach Replenishment Beach replenishment has been considered as part of the project to mitigate the severe erosion on the island. The dredged waste from the sea grass removal activity, after cleaning and sorting, will be used to replenish the a 2900 m beach up to 10 m from the existing shore line. Additional sand will be dredged from borrow areas within the lagoon using sand pumps and excavators. Replenishment will be carried out using a three staged process. The first stage will collect and filter sediments on designated sites. The second stage will transfer the cleaned sediments to severe erosion zones using trucks. The final stage will profile the beach using fine sand. For the direct replenishment, sand will be pumped or transferred via barges to a designated location, where loaders and trucks and move the material. Technical ReportItem Initial environmental examination for a coral frame project(2010-07) Systems Engineering and Marine ConsultingThe potential environmental impacts of the development of a coral propagation project on the island of H.A. Manafaru are assessed. Manafaru is leased to Beach House Maldives and is operated by the Waldorf Astoria collection of the Hilton group. The assessment exposes the solutions and preferred alternatives as well as mitigation measures to minimize any negative impacts whilst trying to derive the maximum positive impacts from the project. Manafaru has very little coral cover after being degraded by the 1998 bleaching event. As it is important to be proactive in reef restoration, the resort management wishes to enhance the value of the island by propagating corals using the coral frame technique. The frames will be installed near the water villas and sparsely on the house reef. Coral fragments will be attached by a marine biologist and will develop into full colonies within a few years. Coral fragments from the house reef will provide a small number of fragments and will heal rapidly. Preference will be given to damaged colonies. 136 frames of 1m2 will be initially deployed, and after the first batch, the existing frames will provide fragments for transplantation. The project will start as soon as approval is granted, and as this is a long term project, it could span several years before completion. The island of Manafaru is located inside the northernmost atoll of the Maldives, and is subject to high winds and warming waters, which may be a cause of low coral survival. As the island is located in the middle of the atoll, the waves reaching its shores are diffraction of swells, and wind waves. As the energy encountered are of second magnitude, and the reef does not form a proper crest, the waves reach the island with less obstruction than most areas. Sand displacement depends on the predominant influence during different monsoons, forming a bulging beach rather than a sand tip. Technical ReportItem Addendum to the environmental impact assessment for Three Islands, B. Thulhaadhoo(2011-06) Miruza, MohamedThe report is an addendum to the “Environmental Impact Assessment Report, Three Islands – B. Thulhaadhoo” report. The need for an addendum occurred to investigate any environmental impacts that may occur as a result of the proposed harbour expansion at B. Thulhaadhoo. The report documents the finding of the study carried out. The original Environment Impact Assessment undertook extensive surveys and research to determine the impacts carried out within a large study area including the area for the proposed harbour extension. General information on the island is therefore not provided in this addendum and is referred to this document. Furthermore, where substantial information is provided in the initial EIA on site specific data relevant for the harbour expansion, such information is highlighted in this EIA without the need for further field investigations. The study finds that there are no significant environmental impacts caused due to the proposed harbour expansion. However, the report does highlight some of the additional impacts that may occur and related mitigation measures have been provided for these. The report provides a monitoring plan for the new development while also referring to the initial monitoring plan proposed in the original EIA for continuous investigation of the environment for a sustainable development. Technical ReportItem Environmental impact assessment for the proposed reclamation of 24 hectare at Thimarafushi, Thaa Atoll, Maldives(2011-12) Water SolutionsThis report discusses the findings of an environmental impact assessment undertaken by Water Solutions Pvt. Ltd for undertaking the propose reclamation of 24 hectares in Thimarafushi island, Thaa Atoll. An area of 240,000 square meters or24 hectares will be reclaimed in order to expand the available land space for Thimarafushi, mostly for housing and industrial activities. This EIA report discusses the findings of the reclamation project. The project is proposed by Ministry of Housing and Environment. The biggest challenge facing Thimarafushi is lack of space and overcrowding. Reclamation is a real need for Thimarafushi as the island is saturated and there are no additional land for housing plots nor industrial activities. The presently reclaimed area, although it is quite huge, most of which cannot be used for domestic use as majority of this land will be allocated to develop an airport and its boundaries. The present population of the island is 2817 and there are 350 households. This is 8 people on average per house. The island needs an additional 400 houses as existing houses are over crowded and too many families having to live in the same house is creating social and health issues. Twenty hectares will be reclaimed from area 1 and approximately 50% of this area would be usable domestic purposes due to airport development restrictions. Further development of Thimarafushi can only be achieved through creating additional land. Reclamation is therefore very much a serious requirement for the people as lack of space is causing many problems. Environmental impacts were assessed and most of the environmental impacts of the project have been identified as resulting mainly from the coral reef damage from dredging and reclamation works. Mitigation measures for the negative impacts have been identified and outlined in detail, especially sedimentation control methods. The most important mitigation measure is the use of bund walls in the fill areas. The proposed mitigation measures will have to be followed in order to minimize environmental damage. The measures proposed to minimize or mitigate environmental impacts may be considered to be quite appropriate, thereby minimizing the impact by about 90%. The main negative environmental impact of the proposed project would be sedimentation and destruction of the lagoon and some areas of the reef, which will cause death or partial death of corals. Coastal protection of the reclaimed area 2 will be undertaken in order to protect the shore. The project is mainly driven by the economic gain to the development of Thimarafushi, mainly through benefits achieved from increased land. Technical ReportItem Environmental audit of the desalination plant in Gangehi Island Resort, North Ari Atoll(2011-07) SandcaysThis report has been prepared in order to assess the environmental performance of the existing desalination plant for the purpose of registration of the plant according to the requirements of the Environmental Protection Agency. This report focuses only on the desalination plant and no other operations of the resort are incorporated within the context of this report. Environmental Impact Assessment (or Audit) is required for the registration of desalination plant under the Desalination Regulation of the Maldives. Also, desalination plant projects fall within the list of projects requiring Environmental Impact Assessment study under the Environmental Impact Assessment Regulation of the Maldives. However, since the desalination plant in Gangehi (like many other such facilities in the Maldives) has been operational when the Desalination Regulation and the EIA Regulation came into effect, the scope for this Environmental Impact Assessment has been based on that of an environmental audit of the existing facilities, focusing on the environmental compliance and performance of the existing desalination plant. Therefore, this report will include a compliance and performance audit. The compliance audit or review will assess how well the project implementation complies with the existing environmental policies or requirements by the registering authority and the performance audit will assess the actual environmental impacts of the project and how well the impacts have been mitigated during the construction as well operational phase. The performance audit will also include a review of the existing monitoring programme, discussing the deficiencies and suggesting improvements for future monitoring. There have not been any legal requirements for environmental monitoring as there has not been any EIA report for the resort facilities under consideration. Therefore, this report is based on the findings of site investigations carried out by the consultant and necessary information provided by the management and technical staff at Gangehi resort. However, it is noted that the resort has a system in place to monitor environmental performance indicators of which water quality tests undertaken in the recent past by the Proponent have been used in preparing this report. In addition to discussing the findings of the audit, a matrix will be presented which summarises the status of environmental compliance and performance for activities involving the operation and maintenance of the facility. This report will also provide recommendations for further environmental improvements to the desalination plants. Technical ReportItem Environmental impact assessment report for resort development at Fushivelavaru, Noonu Atoll(2011-04) Land and Marine Environmental Resources GroupFushivelavaru is one of the islands the Government of Maldives had recently released for tourism development. These islands were leased on the basis that Maldives had to meet the current projected bed-capacity needs in the Maldives. The non technical summary outlines the findings of the Environmental Impact Assessment of the proposed development of a 100 bed resort on the island of N. Fushivelavaru. The resort at N. Fushivelavaru will be operated by Gladonia Maldives Pvt Ltd. This document presents the findings of an Environmental Impact Assessment (EIA) for resort development at N. Fushivelavaru. Developments of this nature are required to carry out EIA studies under the Environmental Act of Maldives. The developer is required to obtain approval of the Environment Protection Agency (EPA) of Ministry of Housing and Environment (MHE), Maldives prior to the implementation of any development activities on the island. Land and Marine Environmental Resource Group Pte Ltd have been engaged Gladonia Maldives Pvt Ltd to prepare the EIA and to provide assistance in other environmental related activities. This EIA is prepared in accordance with Environmental Impact Assessment Regulations, 2007 and the Government of Maldives environmental policy and guidelines. Technical ReportItem Technical ReportItem