Environment - ތިމާވެށި

Browse

Search Results

Now showing 1 - 10 of 21
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for extension of Kooddoo Domestic Airport and development of a city hotel Kooddoo, GA. Atoll
    (2013-12) Adam, M. Shiham; Riyaz, Mahmood
    1. The domestic airport of Kooddoo was built during 2011 and was officially opened in 2011. This 1,200 m long airstrip in the north eastern side of the Ga Atoll serving the emerging high-end resorts have become one of the busiest and most important domestic airports in the south. It is normal to have 7-8 flights per day with mostly tourist passengers arriving and departing. Also relatively large volume local passengers make use of the route for transferring to the islands in the south or simply commuting on business trips. It was also noticed that guests with reputable business credentials were requesting to resort operators to allow their own air-craft (jet) to fly Kooddoo direct rather than having inconvenient and long layover times at Hulhule Ibrahim Nasir International Airport. 2. In order to address this need the Ministry of Tourism (previously Ministry of Tourism, Arts and Culture) engaged with the Maldives Civil Aviation Authority and the Ministry of Transport and Communication in a development project to extend the airstrip and also to upgrade and modernize the airport to provide services to international standards. Keong Hong Construction Pte Ltd, a reputable property developer in the region, won the airport development contract through competitive bidding tendered by the Ministry of Tourism. The negotiated contract agreement included development of a 50-room city hotel on Kooddoo and also development of Ga. Maamutaa as an upper-class tourist resort. Under the same agreement the Kooddoo airport will also be managed by Keong Hong Construction Pte Ltd, who now has an Aerodrome Certificate to run the airport under their name 3. Following the new Regulation on Reclamation and Dredging of Islands Lagoon and Reefs a permit for dredging and reclamation work was obtained before the scoping of the project took place. As such all paper works, including the dredging and reclamation permit was submitted for the Scoping Meeting held at EPA and was attended by stakeholders. 4. The scope of this development project is to reclaim about 260 m long and 150 m wide area from both ends of the island to extend the runway to 1,800 m, to dredge and create 500 m long entrance channel from the western corner of the reef connected to a harbour basin with access walkway jetty. The scope also includes the complete development works of the 50-room city hotel including upgrading of airport services and equipment following the expansion airport capacity. The most significant development activity with regards environmental change is the dredging of western side, reclamation of the both ends and development 25 over-water bungalows on the shallow lagoon on the western side. 5. Existing environmental conditions have been revised using the comprehensive set of baseline data gathered for the airport development project in 2011 but supplemented by additional field data gathered during the visit made in late November 2013. These have been used to assess and evaluate the environmental impacts from development activities. For activities with potential to cause significant impacts, appropriate and practical mitigation measures have been proposed. 6. Since management of Kooddoo airport is now under Keong Hong Construction Pte Ltd the plan is to upgrade and expand the utility services (production of water, generation of electrify and overhauling of sewerage system) to meet the additional requirements of the proposed city hotel. As such the developer plans to add on to the existing structures and arrangements as much as possible to cut down development costs and improve efficiency. 7. The developer pans to increase current water production capacity of 150 cubic meters per day to 450 cubic meters per day. This would involve installing and commissioning of 2 x 150 cubic meters day capacity RO plants. Electricity generation will be increased from its current capacity of 250kVA to 3110 kVA by adding 2x800 kVA units and 2x630 kVA units. The current septic sewerage system will be overhauled to modern Membrane Bioreactor (MBR) plant with a capacity to treat 200 cubic meters of sewage water per day The outflow water will have negligible amount of coliforms and so will be used for watering the plants and landscaping work. 8. Installation and commissioning of electricity generation and water production system will be done as per guidelines of the Maldives Energy Authority and Environmental Protection Agency respectively. Similarly, to ensure safety, drilling of boreholes for source water for RO plant and construction of 150,000 liters of fuel storage, and 20,000 liters of petrol will be stored in bunded areas. Environmental issues arising from these developments have been identified and practical mitigation measures have been proposed. It has been recommend that water production system and power generation system should be registered with the authorities before the its full commissioning. 9. Reclamation works and extension of runway will take place whilst the airport is in operation. In order to avoid disruption of flight schedules it is advised the developer/contractor provide method statements, including details on plans and schedule of activities that should be agreed in consultation with the Civil Aviation Authority. Coordination should be maintained at all times between the Air-traffic control tower and developer/contractor. Fortunately since the developer and airport management is the same company it is envisaged that there should not be any problems for this coordination. 10. The estimated volume of material recovered from dredging /excavation works is around 70,000 cubic meters. However, the estimated volume required for reclamation is estimated at 120,000 cubic meters. Alternative borrow areas have been identified to make up for this short fall. The issues were discussed at the Scoping Meeting and it was agreed that area on the south eastern side where the reef-flat is widest may be identified as a potential borrow area. Climate condition and orientation of the Kooddoo reef is such that lagoon often times becomes rough, thus prohibitive safe entry. As such hard structures (breakwaters) have been proposed for the channel and the harbor basin. 11. The proposed reclamation work on either end of the island extends close to the reef edge, creating the possibility of blocking the water exchange from the eastern and western side. It was noted that this may cause disruption of the established longshore drifts flow around the island creating areas of pockets of erosion and accretion. Since it will be difficult to predict such changes, appropriate environmental monitoring have been proposed. The developer/operator is encouraged to follow the monitoring programme and report to the authorities on a regular basis. Environmental monitoring allows detecting environmental change so that appropriate remedial action may be taken or addressed in a timely manner. 12. A Leopold Matrix has been used to classify the magnitude and importance of possible impacts which may arise during the constructional and operational phase of the project. Leopold Matrix is the most widely used methodology for identifying the impact of a project on the environment. It is a two dimensional matrix which cross references between the activities which are foreseen to have potential impacts on the environment and the existing conditions (environmental and social) which could be affected. It was concluded that the short term minor to moderate impacts as identified above outweigh the medium to long term socio-economic benefits to the region, to the tourism sector and to the country in general. 13. Since the Kooddoo Island is going to have three distinct business entities, namely Kooddoo Fisheries Maldives Ltd, Kooddoo Airport, and the Kooddoo City Hotel, the EIA report includes, an officially approved boundary demarcations in Annex 3.
  • Thumbnail Image
    Item
    Technical Report
    Environment impact assessment for flood mitigation and reclamation works at Fares-Maathoda, Gdh Atoll
    (2013-02) Land and Marine Environmental Resources Group
    The non-technical summary outlines the findings of the Environmental Impact Assessment for the development of flood mitigation measures at Fares-Maathodaa in Gaafu Dhaalu Atoll in the South of Maldives. The island is susceptible to flooding due to storm surges and powerful swells and was one of the worst affected islands during the powerful swells which hit the Maldives in 2007, with the entire island of Fares and one third of Maathodaa being flooded. Hence the need for proper flood mitigation measures is crucial in order to ensure the safety of the community of the island during possible similar events which may occur in the future. The project proponent of this project is United Nations Office for Project Services, who were requested by United Nations Development Programme to provide support of developing a comprehensive coastal protection and drainage management support approach to the southern island of Fares-Maathodaa. This project is part of a climate change package from the Danish Government of about $10 million to UNDP. The bid for the provision of consultancy services for carrying out detailed designs for flood mitigating measures at Fares-Maathodaa Island was won by Lanka Hydraulic Institute Ltd (LHI) (and their local counterpart, Riyan Pvt Ltd) and UNI Consulting Services. After conducting a study at the site and undertaking numerical modeling of five engineering interventions which were then proposed to UNOPS and the Government of Maldives it has been decided to construct a continuous offshore breakwater structure of length 734 m, joining the headlands of Fares and Maathodaa on the southwestern side of the island. Physical modeling was then conducted on this option. The breakwater would be constructed using armour rocks of varying sizes and weights which have been chosen based on their ability to resist extreme wave conditions without significant displacement. The core of the breakwater will be filled with dredge material obtained from within the enclosed lagoon area. The project also involves the reclamation of the enclosed lagoon area of 191,700 m2, though this component will be carried out as a second phase of the project, within a short duration of completion of the breakwater construction. Details of this phase will be addressed in a separate report formulated prior to commencement of this project. The construction of the breakwater will be undertaken by UNOPS, while reclamation will be funded and undertaken by the Government of Maldives.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed development of sewerage system at Eydhafushi, Baa Atoll, Maldives
    (2008-08) Oriental Consultants; Yachiyo Engineering
    This report discusses the findings of a social and environmental impact study undertaken by Oriental Consultants and Yachiyo Engineering of Japan at the request of the Ministry of Environment, Energy and Water. Although this is a rehabilitation project, the sewerage system in Eydhafushi is beyond rehabilitation and needs a complete makeover. Therefore, in accordance with the requirements of the EIA Regulation, an EIA is proposed to be done for the proposed project. The project involves the decommissioning of the existing system and development of a new sewerage system in Eydhafushi. This project is initiated by the government of Maldives with funding from Japan Bank for International Cooperation (JBIC) as part of the tsunami rehabilitation programme. The existing sewerage system of Eydhafushi was built by the people on a need basis by different individuals connecting their septic tank systems to gravity flow sewer pipes disposing to the lagoon. The system is not so functionable and has some environmental problems, which need to be addressed. The system is similar to the “Small Bore Sewerage System”, which is basically a gravity flow system which the government in collaboration with UNICEF established in some of the most populous island such as Kandholhudhoo and Hinnavaru. The environment of Eydhafushi may be described as well managed, with few environmental problems with appropriate solid waste management, well maintained private sewer lines with nearshore outfalls, clear lagoon which is seeing increasing signs of pollution from nearshore disposal of sewage using multiple outfalls spread around the island, good housing with apropriate ventilation, sound level of urban planning, presence of beach and recreational areas and groundwater less contaminated compared to several islands of similar size and population density. Stakeholder consultations were held with various groups, including the community and the client in order to incorporate the socio‐economic components in the project. It was observed that the community of Eydhafushi is less dependent upon the government than many other islands, which are dependent for reasons of bureaucratic system of government people have been used to. Environmental impacts were assessed for both the construction and operation phase of the project. Most of the environmental impacts of the project have been identified as positive resulting mainly from improvements to groundwater and lagoon water quality and resulting reduction in water‐borne and water‐related diseases and general ill‐health. The main negative impact of the project would be that of excessive drawdown on the aquifer resulting from the improved sewerage system. There are other minor negative impacts such as small amount of excavation to lay the outfall pipe and dewatering to lay the sewer network in some areas including dewatering for the construction of manholes, lift stations and sumpwell at the STP and outfall. These impacts are considered to be moderate but short‐term. The socio‐economic benefits of the project may be considered to outweigh the negative impacts of the project. Mitigation measures for anticipated negative impacts have been identified and outlined in detail, including minimizing dewatering, laying the sewers properly including the outfall, locating the outfall at adequate depth, including secondary treatment before discharging final effluent to sea, removal of existing sewers and outfalls and improvements to lagoon and coastal conditions in order to attain the benefits of the project. The main mitigation measure would be water conservation and measures to minimize drawdown on the aquifer. This is considered necessary whatever the sewerage system, if it uses groundwater for flushing. The proposed design for Eydhafushi sewerage system has been prepared after considering all impacts, discussions with community and consideration of mitigation measures. It is inevitable that there would be some negative environmental impacts. However, these are minor compared to the positive effects of the proposed system. Yet, monitoring to ensure the effectiveness of the proposed system would be necessary. Therefore, a monitoring component has been suggested which takes in to consideration, the most important elements that require regular checks. This monitoring component will be adhered to and will allow the assessment of changes due to construction and implementation of the proposed sewerage system. Monitoring is specifically focussed on ground and surface water quality changes. Reef monitoring is considered inappropriate given the scale of anthropogenic damage to the reefs of Eydhafushi. In conclusion, it appears justified from a technical and environmental point of view, to carry out the proposed project to improve sanitation in Eydhafushi.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment : wharf reconstruction and upgrading of the existing berthing facility and slipway at FSM Thilafushi plot
    (2013-03) Land and Marine Environmental Resources Group
    The slipway and berthing facility used by Fuel Supplies Maldives Pvt Ltd on Thilafushi is located on the northeastern side of the island. The facility has undergone extensive damage over the years and is also not sufficient to fully cater to the needs of the company. The proposed project involves the repair of the existing slipway and modification of seaward wharf of the plot. The seaward wharf will be extended by 311 and protected by sheet piles. The wharf will be designed to cater to vessels of 2000 tonnes (alongside berthing facility). The Slipway will be designed to cater for vessels of 200 tonnes. The project also involves reconstruction of the plot separating the wall from adjacent plot at the eastern side. The proponent of the proposed project is Fuel Supplies Maldives Pvt Ltd (FSM). Fuel Supplies Maldives, incorporated on 18th December 2000 is now a joint venture between State Trading Organisation (STO) and the Maldives National Oil Company (MNOC) formed with the main objective of streamlining fuel distribution in the country and to offer easy and convenient access to fuel throughout the country (FSM website, accessed March 2013). The total estimated cost of this project is ME 1.5 million. This document presents the findings of an Environmental Impact Assessment (HA) for the repair of the existing slipway and modification of seaward wharf of the plot used by ESM Pvt Ltd in Thilafushi. Developers of such development projects are required to carry out EIA. studies under the Environmental Act of Maldives. The developer is required to obtain approval of the Environmental Protection Agency (EPA), prior to the implementations of any development activities on the island. Land and Marine Environmental Resources Group Pvt Ltd have been engaged by FSM Pvt Ltd to prepare the EIA and to provide assistance in other environmental related activities. This HA is prepared in accordance with Environmental Impact Assessment Regulations 2012 and the environmental policy and guidelines of the Government of Maldives.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed reclamation of runway extension Gan International Airport Addu City, Maldives
    (2013-01) Sandcays
    This report discusses the findings of a social and environmental impact study under the proposed runway extension at Gan International Airport, Gan, Addu City. The project is proposed by Addu International Airport Pvt. Ltd. The project is targeted at extending the runway by reclamation of land from the surrounding lagoon so that larger aircrafts can be accommodated. The dredged area will be utilized for sea plane operations in the near future. Coastal protection of the reclaimed area as well as the dredge area for seaplane operations will form an integral part of the project. At present large aircrafts A320 and Boeing 777 can only do an emergency landing and regular operations is not possible. With the increasing demand for large international carriers the runway needs to be extended. The airport not only caters for Addu City but is the international hub in the south of the Maldives catering for a large local population and an ever increasing tourist population in Addu City, Fuah Mulah and Huvadhoo Atolls. Therefore, the proposed runway extension is an immediate need for Gan International Airport. In addition, resort and other economic developments in the southern atolls will increase the demand for seaplane operations and this demand is very strong at present. Therefore, adequate areas need to be identified for seaplane operations. Shallow lagoon areas which can be easily protected from waves is most suitable and the proposed dredge areas on the southern lagoon of Gan are the only potential areas for seaplane operations and their future expansion. Alternatives have been identified in the project document. These include alternatives for the runway extension as well as dredge areas. The runway has been proposed to be extended to 350m initially with the possibility of further expansion in the future. The proposed area for extension is the western end of the runway between Gan and Feydhoo. Two dredge areas were identified as the southwest lagoon area and the southeast lagoon areas. These two options are being currently studied by comparing costs of dredging against operational costs. In terms of their social and environmental impact, both options are equally suitable. Further options were identified during the EIA process including the scoping meeting. One important option identified by the environmental consultants was extending the runway more to the eastern end than the west in order to minimize the impact on the flow between Gan and Feydhoo. This option has been favoured by the Consultants initially. However, taking into consideration the greater negative impacts on the marine environment from the option, the consultants chose to recommend the alternative of reclaiming the entire area between Feydhoo and Gan and to not extend the runway to the eastern side. This option may have additional dredging costs, however, the costs of protecting the reclaimed area is expected to counter balance the increased costs of dredging. In addition, the onshore and offshore protection proposed under the project together with a groyne system for Feydhoo and other affected areas, proposed as mitigation measures, will help to minimize the impacts on longshore transport. Therefore, this option may be favoured. Environmental impacts were assessed for both the construction and operation phase of the project. Most of the environmental impacts of the project have been identified as positive resulting mainly from improved transportation, increased economic activities in the southern atolls of the Maldives, direct and indirect employment opportunities, increase in related business ventures, and so on. The main negative environmental impact of the project is identified to be the changes in hydrodynamics between Feydhoo and Gan and the resulting impacts on the southern, especially southeastern shoreline of Feydhoo. The Proponent is willing to undertake monitoring and if necessary computer modelling to identify mitigation measures and undertake such measures at their cost. There are also few negative impacts of the project relating to changes in landuse as a result of the project. The main impact relating to landuse would be further developments on the southeast corner of Feydhoo, which is the only area of Feydhoo with nice sandy beach. Land owners in the area may be affected. However, industrial developments could take place in the area. The main mitigation measure for the proposed project would be the provision of shore protection to the southeast beach on Feydhoo. The City Council raised concern that this area is even at present under threat of erosion during storms and that they have been considering shore protection measures for this side. Therefore, it would be ideal if such shore protection can be incorporated as mitigation measures under the proposed runway extension project. Secondly, there will be the well-known impact of sedimentation from dredging and reclamation and mitigation measures that shall be implemented. These include provision of bunds and control of dredge water flow in to the environment. Methods of sediment control have been discussed in the report in detail. Use of silt screens where relevant has been identified as an important measure. It is recommended to ensure that sedimentation is kept to a minimal as such use of cutter suction dredger has been recommended. It is inevitable that there would be some negative environmental impacts. However, most of the impacts of the proposed project are minor compared to the positive socio-economic benefits of the proposed system. Yet, monitoring to ensure the effectiveness of the proposed project would be necessary. Therefore, a monitoring component has been suggested which takes in to consideration, the most important elements that require regular checks. This monitoring component will be adhered to and will allow the assessment of changes due to construction and implementation of the proposed extension of the runway. Monitoring is specifically focussed on water quality, mainly turbidity and total suspended solids during the construction phase. Changes in the hydrodynamics of the project area as well as impacts on the reef or marine ecological are of importance. In conclusion, it appears justified from a technical and environmental point of view, to carry out the proposed project to extend the runway of Gan International Airport to the west. However, there are alternative that may be more suitable and shall be considered with caution and after understanding the costs and discussions with relevant government authorities.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for construction of sand filled deck at Bandos Island Resort and Spa
    (2013-03) Land and Marine Environmental Resources Group
    The non-technical summary outlines the findings of the Environmental Impact Assessment of the proposed construction of a sand filled sun deck on Bandos Island Resort and Spa, by the resort management as the proponent of the project. Bandos Island Resort and Spa located in Nort The project involves the construction of a sand filled sun deck on the southern margin of the small harbour facility on the southwestern side of the island. The area is currently filled with rock and rubble which was excavated during the construction of the harbour facility. Hence by constructing the sun deck, the resort management is looking into making the area usable and aesthetically more pleasing to the eye. Sand for this project will be sourced from the harbour basin and additional material will be purchased should this not be sufficient. The sun deck would be protected by a seawall constructed using sand/cement bags with a smooth cement finish. The total estimated cost of this project is USD 00,000 including sand filling works and construction of revetment walls. Key impacts, mitigation measures and alternatives Impacts on the environment from various activities of the project development work (constructional impacts) and post constructional impacts have been identified through interviews with the resort management team, field data collection and surveys and are also based on past experience of consultant in similar development projects. Impact analysis was done using the Leopold matrix. The main impact associated with the project is minor short term impact on the marine ecosystem quality of nearby areas (to burrow area) due to sedimentation (as a result of dredging activities). No negative impacts on the environment are expected during the post constructional phase, although a huge positive impact in terms of the utilization of an area which has been impacted and unusable is guaranteed. Mitigation measures have been discussed for the construction stage of the project. The main mitigation measure proposed is the construction of a bund and seawall around the area for sundeck construction prior to backfilling the area, in order to avoid release of fines and minimize sedimentation impact. Detailed mitigation measures are discussed in Section 11 of the report. Given the small scale of the project the only component for which an alternative has been considered is in terms of the material used to construct the sea wall. The - option has also been considered, though this would mean that the area remains unusable and filled with rock and rubble. It also means that there would be no impact on the environment from development of this project. The proposed development is assessed to bring minor short term impacts to the environment in general. Hence the "no-project" scenario is not seen as a feasible option and it is the conclusion of the consultant that the project can be carried out with minimal impact on the environment, with the proper implementation of mitigation measures discussed in the report.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed agriculture project on Dhandhoo, Baa. Atoll
    (2013-03) Adam, M. Shiham; Riyaz, Mahmood
    Baa Atoll Hanifaru was leased in 2008 to Mr. Mohamed Shareef of Maafannu Sunny Coast to develop agricultural activities. Following Environmental Regulation, an EIA Screening Form was submitted to EPA during early 2009. However, after elapse of some considerable period, the erstwhile Ministry of Housing and Environment declared Hanifaru Bay (lagoon) as a protected site under environmental law. Later Hanifaru was also declared as a protected site. In order compensate for this unexpected ‘taking away’ of Hanifaru, the Ministry of Fisheries and Agriculture, in consultation with Mr. Mohamed Shareef, arranged an alternative island – Baa Dhandhoo. The proposal under consideration is to develop Baa Atoll Dhandhoo as an agricultural island along with three other minor functions. The primary business model is based on production of high quality agricultural products. The island would also be a facility providing complementary and alternative medicine (CAM) services. To complement this function a small nursery of about 4,000 sq feet is proposed to grow indigenous medicinal plants that are becoming rare/extinct. Finally a small visitor centre is proposed which would allow visitors to learn about the activities on the island. Two main approaches − the AutoPot and hydroponics systems − are proposed for the production of rock-melon, cucumber, capsicum, chillies, lettuce, tomatoes etc. The growth system is completely contained either in the grow pots or in water medium. The main development feature of the island is 6 x 4,000 sq feet green houses to set up the AutoPot and hydroponics system. The green houses will be imported and assembled at site. Similarly the AutoPot system will be imported and assembled at site. The hydroponics system will be constructed locally from the imported material. Construction of the buildings will be kept to a minimum; staff accommodation, kitchen / dining facilities will be constructed to accommodate no more than 15 people for the agricultural works. Treatment rooms for CAM treatments will be built on the northern side of the island. A small stilt-jetty is constructed on the western side of the island. A complete list of the buildings is given in the layout plan. The island would be self-contained, and so water production and power generation will take place on the island. An RO plant of 10 cubic meters / day capacity is proposed with intake from the lagoon. To supplement the water production rainwater will be harvested from every possible roof on the island. A 25kW diesel power generator will installed for producing electricity. Storage of diesel on the island will be minimal transporting the required amounts from the nearby islands. The baseline environmental conditions were assessed using standard methods. Significant erosion was observed on the north-western and northern side of the island while accretion was evident on the western side. There appears to be a directional shift of the island to west. However, observation of such magnitude of movement has entirely due to seasonal erosion and accretions have been observed in some islands of Baa Atoll. No interventions for mitigating erosion were proposed at this stage. Biannual monitoring of shoreline was proposed to determine the seasonal dynamics of the island beach. No hard structures are proposed at this stage. A Leopold Matrix was used to determine the scale and extent of the impacts. The short-term environmental impact from this development project would to the island ecosystem from clearance of vegetation. About 60-80 palms may have to remove and/or relocated for the development work that will be replaced accordingly. Loss of top-soil, and shade and the clearance may affect the vegetation around the periphery. It is recommended that clearance take place only where necessary. Septic tanks systems have been proposed for disposing human waste and pose no long-term negative environmental impact considering the small number of people expected to be based on the island. It is recommended that non-biodegradables should be regularly removed from the island for disposal in to another island with arrangement made with the Council. Biodegradable waste from the plant material will be left to appropriately degrade on the island, thereby contributing nutrients pool of the island ecosystem. The Atoll Council and the resorts were consulted regarding the project and their views were considered. There was full support of the Council and no issues were highlighted. There were also no issues raised from the resorts except they wished see only minimal landscape Impacts during the operation phase are considered to be negligible. Overall the impact from the Project will be positive – demonstration of effective economic and sustainable use of uninhabited small islands inducing encouragement for climatesmart type agriculture.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the development of a mariculture project in R. Fenfushi
    (2013) ReefTAC Maldives
    This Environmental Impact Assessment (EIA) was prepared to fulfill the requirements of Clause 5 of the Environmental Protection and Preservation Act (No. 4/93) of the Maldives for assessing the potential environmental impacts associated with the development of a mariculture project in R. Fenfushi. The project is proposed by Seaharvest Maldives Pvt. Ltd. This report identifies both negative and positive impacts that may arise from the implementation of the proposed project, during both construction and operation. Justifications and rationale are provided for implementing the various components of the project. Mitigatory measures are suggested for swift action should a negative impact arise. An environmental monitoring plan that will aid in measuring the actual impacts of the proposed project is also included. The major activities of the proposed project are described under ‘Scope of Work’. The project will be implemented in two phases which upon completion will include the construction of jetties, sea-cages, packing facility, shore protection, powerhouse, plant nursery, hatchery facility, accommodation blocks and related infrastructures. Approximately 176.9sqm of land area will be used for the development. The proposed project will be carried out over a period of 8 months. The project will involve the culture of Epinephelus fuscoguttatus, Brown-marbled Grouper in sea-cages. A hatchery facility will be established by the end of Phase 2, where E. fuscoguttatus will be bred, eggs incubated and larvae raised through to fingerling stage prior to fattening in sea-cages for harvest. The next chapter, ‘Description of the Environment’, describes the general environmental setting and geographic location of R. Fenfushi. Climate and physical factors including the monthly average values of temperature, rainfall and sunshine as well as baseline data collected on a field survey trip to the site are provided in this section. Subsections include bathymetry, beach profiles, vegetation, terrestrial fauna, wind speed, wave data, current speed and direction, sediment transportation, temperature, rainfall and humidity. Water samples were collected to achieve an understanding of the natural water quality parameters and to assist in conducting monitoring programs. Biological factors were also assessed, including marine substrate and coral analyses, fish counts and socio-economic surveys. All activities during both construction and operational stages of the proposed mariculture project will be carried out in accordance with existing plans, policies, guidelines, laws and regulations of the Maldives and relevant international conventions to which Maldives is party to. The applicable policies, laws and regulations include the Environment Law, Environment Protection and Preservation Act 1993 (EPPA), Environmental Impact Assessment Regulations, 2012, Strategic Economic Plan, National Environment Action Plan III, The Fisheries Act, National Biodiversity Strategy and Action Plan, Protected Areas and Environmentally Sensitive Areas, Regulation on Sand and Aggregate mining, Regulation on Coral Mining, Regulation on Removal of Trees, Waste and Wastewater Regulations and Policies and International Conventions, Treaties and Protocols. Under the chapter of ‘Potential Impacts on the Natural Environment and Mitigation Measures’ details of potential environmental impacts and relevant mitigation measures are provided. The main environmental impacts of the proposed project will be from clearing of vegetation, piling for jetty construction, and fattening fish in the lagoon. Though access to fishermen will become restricted, the project is anticipated to bring about positive direct and indirect impacts to the socio-economic environment. The chapter on ‘Alternatives’ discusses the possible alternatives to the various components of the proposed project with their key advantages and disadvantages followed by recommendations. This includes the ‘no project option’ and its’ advantages, disadvantages and recommendations. An environmental monitoring and management plan is included, which is necessary to ensure that changes and impacts to the environment are identified and mitigation measures swiftly implemented. It is mandatory to submit detailed monitoring reports to the Environment Protection Agency of the Ministry of Environment and Energy. Consultations and inter-agency coordination was carried out to discuss the components of the project between relevant stakeholders. All consulted stakeholders were supportive of the proposed slipway project. Details of these meetings are provided. This EIA demonstrated that both short and long term impacts are expected to arise from the development of the proposed mariculture project at R. Fenfushi. This includes negative environmental impacts to the marine and terrestrial environment and mainly positive impacts to the socio-cultural environment. After consideration of predicted impacts and identification of appropriate mitigation measures, the consultant concludes that the project is feasible, given all applicable laws and the recommendations of this EIA are adhered to and the monitoring program carried out as outlined. ReefTAC Maldives Pvt. Ltd. acknowledges the work of all participants involved in the collection of data and preparation of this EIA, and wishes to thank the Proponent, Raa Atoll Council and residents of R. Fainu, Kinolhas and Meedhoo for their continuous assistance and cooperation throughout the period of this EIA.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed harbour development in Velidhoo, Noonu Atoll, Maldives
    (2011-03) Sandcays
    The proposed harbour development project in Noonu Velidhoo is of medium scale project in which the proposed project falls under rehabilitation of an existing harbour, which has been in need of extensive repair and improvement through modification and improved design. Under the proposed project, a 24 m wide entrance will be dredged (modification of an existing entrance) along with deepening of harbour basin. The existing harbour basin from quay wall will be dredged to a width of 76.2 m and a length of 289m. An additional 30m quaywall with associated harbour basin dredging will also be undertaken. The proposed concept has not been discussed with the community so far. Therefore, some of the community views that have been incorporated in this EIA report along with further formal consultations need to be given consideration in finalising the design. However, the community has been waiting for the project for quite some time and the first elected Island Council is under a lot of pressure to initiate the works. Therefore, it is recommended to allow the project to proceed while any further modifications to the proposed design can be finalized in consultation with the relevant stakeholders during the construction phase. Taking this into consideration the environmental impacts have been assessed for the worst case scenario in which the Proponent takes into consideration all demands of the community and provide the final detailed design to the EPA in due course. The recommended alternative proposed in this EIA report has been based on informal community consultations held with some key members of the community. The overall environmental impacts of the project have been assessed using appropriate matrices and the results indicated that the proposed project has net positive impact. Given that the project has several socio-economic benefits although there would be some negative environmental impacts, it is recommended to allow the project to proceed as proposed.