Environment - ތިމާވެށި
Browse
8 results
Search Results
Technical ReportItem Environmental impact assessment for harbor extension works at Fares-Maathodaa, Gdh. Atoll(2016-04) Land and Marine Environmental Resources GroupBackground The non-technical summary outlines the findings of the Environmental Impact Assessment of the proposed harbour extension works at Fares-Maathodaa, Gaafu Dhaalu Atoll. The proponent of the proposed project is Ministry of Housing and Infrastructure. The total estimated cost of this project is USD 843,060. The proposed project involves extension of the existing facility (which lies on the northern side of the island) by addition of 61m (along its length) to the eastern side of the facility. The project also involves construction of the main quay wall along the extension area and a sand bund breakwater along the outer boundary. Dredged material sourced will be disposed along the shoreline to the east of extension area. Key impacts, mitigation measures and alternatives Impacts on the environment have been considered for the constructional phase and post constructional phase of the project. These impacts have been identified through interviews with the project management team, field data collection and surveys and are also based on past experience of consultant in similar development projects. Impact analysis was done using the Leopold matrix. The impacts identified are described according to their location, probability of impact, magnitude, significance and duration. Mitigation measures have also been identified for impacts which are irreversible in nature. Impact analysis showed that the main impact due to the project was during the construction phase, due to dredging activity. This impact was also anticipated to be of low effect due to the location (shallow intertidal area with seagrass beds) and scale of project (even though loss of seagrass beds from project site is a permanent impact). Overall, impacts identified were found to be of low effect and restricted to the project site, with temporary effects. Positive impact due to the project is the availability of a bigger and more planned area (dedicated area for unloading and passenger use) for use by the numerous vessels of the island and those who visit the island. Mitigation measures are discussed in the report for potential impacts, such as limiting dredging activity to low tide phase to reduce possible sedimentation impacts. Detailed mitigation measures are discussed in Section 11 of the report. Given the scope of the project and need alternative has only been considered for the material to be used for breakwater construction and location of extension. The no-project scenario which was also considered, is not feasible, given the scope of project and associated impacts on environment which are which are mainly of low effect and short term. The benefits on continuation of project outweigh the impacts and hence the no-project scenario is not considered a feasible option. The Consultant feels that the project is feasible with proper implementation of the mitigation measures proposed to minimize the impact on the environment. Stakeholder Consultation Stakeholder consultation was undertaken with Island Council regarding the concept drawing formulated by MHI. The council stated that they require a side quay wall to be included in the eastern side and if excess dredged material is available back filling areas where erosion is observed. Based on the stakeholder consultation, MHI agreed to change the concept design to include a side quay wall at the eastern side. The revised final drawing is provided in Appendix 5 of this report. Technical ReportItem Environmental impact assessment for construction and development of water supply system at Dhangethi, Adh. Atoll(2016-12) Land and Marine Environmental Resources GroupThe non-technical summary outlines the findings of the Environmental Impact Assessment of the construction and development of a freshwater production and distribution system at ADh. Dhangethi. The proponent of this project is the Ministry of Environment and Energy and total estimated cost of the project is MRF 17 million. To meet the water supply demand and to provide a quality treated water RO desalination with rainwater collection scheme is proposed for the island. The project involves the setup of a RO plant facility with two RO plants each with a capacity of producing 60m3 of freshwater per day One RO plant will be operational at anyone time while the remaining plant will be kept as a backup. Rainwater will be collected from the public buildings which will go through separate treatments before being mixed with RO desalinated water. Key impacts, mitigation measures and alternatives Impacts on the environment from various activities of the project development work (constructional impacts) and operational impacts have been identified through interviews with the Project management team, field data collection and surveys and are also based on past experience of consultant in similar projects. Impacts were analysed for their significance with the aid of a Leopold Matrix. In any development project, major direct impacts to the environment occur mainly during the construction phase. Potential direct or indirect impacts on the environment from the proposed project include: Minor to moderate impacts to the groundwater resource during drilling and construction work Impact on vegetation due to the need to cut down vegetation located at the plot Impact due to air and noise pollution during construction work Impact on marine environment due to discharge of brine Positive impact on social wellbeing and health Mitigation measures are discussed for the activities which would have potential impacts during the construction and operational phase of the project. In general, during the construction stage it is important to use a method of construction which has the least impact on the environment. Specific measures highlighted include following of established guidelines when carrying out excavation works and dewatering and transplantation of Coconut palms around the periphery of the project site. Detailed mitigation measures are discussed in Section 11 of the report. Alternatives have been considered for various components of the project and are given as possible options that may be either more practical or less expensive to the preferred options. The proposed alternatives also have taken into consideration the environmental consequences resulting from these options as compared to the preferred options. The following components of the project have been discussed in providing these alternatives; Location of RO plant facility Source of feedwater for RO plant Brine discharge location The no-project scenario is also considered, which would mean that all environmental impacts due to the project would no longer be an issue. However, this also means that the community would have to continue using only rainwater and groundwater as main freshwater sources. Additionally, it would also mean increased health risks faced by the community due to the use of contaminated water and the loss of potential additional job creation during the operation of the service. The environmental impacts predicted for the project are minor to moderate, hence the benefits of establishing the system, though with a cost to the environment is seen to be far more beneficial than the cancellation of the project, as the health risks faced by the community is not something that should and can be overlooked. Therefore the “no-project” scenario is not a feasible solution and it is recommended that the project be continued, but with the proper implementation of all mitigation measures proposed in the report. Details of the various alternatives considered and the selected alternatives are shown in Section 10 of the report. Technical ReportItem Environment impact assessment for flood mitigation and reclamation works at Fares-Maathoda, Gdh Atoll(2013-02) Land and Marine Environmental Resources GroupThe non-technical summary outlines the findings of the Environmental Impact Assessment for the development of flood mitigation measures at Fares-Maathodaa in Gaafu Dhaalu Atoll in the South of Maldives. The island is susceptible to flooding due to storm surges and powerful swells and was one of the worst affected islands during the powerful swells which hit the Maldives in 2007, with the entire island of Fares and one third of Maathodaa being flooded. Hence the need for proper flood mitigation measures is crucial in order to ensure the safety of the community of the island during possible similar events which may occur in the future. The project proponent of this project is United Nations Office for Project Services, who were requested by United Nations Development Programme to provide support of developing a comprehensive coastal protection and drainage management support approach to the southern island of Fares-Maathodaa. This project is part of a climate change package from the Danish Government of about $10 million to UNDP. The bid for the provision of consultancy services for carrying out detailed designs for flood mitigating measures at Fares-Maathodaa Island was won by Lanka Hydraulic Institute Ltd (LHI) (and their local counterpart, Riyan Pvt Ltd) and UNI Consulting Services. After conducting a study at the site and undertaking numerical modeling of five engineering interventions which were then proposed to UNOPS and the Government of Maldives it has been decided to construct a continuous offshore breakwater structure of length 734 m, joining the headlands of Fares and Maathodaa on the southwestern side of the island. Physical modeling was then conducted on this option. The breakwater would be constructed using armour rocks of varying sizes and weights which have been chosen based on their ability to resist extreme wave conditions without significant displacement. The core of the breakwater will be filled with dredge material obtained from within the enclosed lagoon area. The project also involves the reclamation of the enclosed lagoon area of 191,700 m2, though this component will be carried out as a second phase of the project, within a short duration of completion of the breakwater construction. Details of this phase will be addressed in a separate report formulated prior to commencement of this project. The construction of the breakwater will be undertaken by UNOPS, while reclamation will be funded and undertaken by the Government of Maldives. Technical ReportItem Environmental impact assessment : wharf reconstruction and upgrading of the existing berthing facility and slipway at FSM Thilafushi plot(2013-03) Land and Marine Environmental Resources GroupThe slipway and berthing facility used by Fuel Supplies Maldives Pvt Ltd on Thilafushi is located on the northeastern side of the island. The facility has undergone extensive damage over the years and is also not sufficient to fully cater to the needs of the company. The proposed project involves the repair of the existing slipway and modification of seaward wharf of the plot. The seaward wharf will be extended by 311 and protected by sheet piles. The wharf will be designed to cater to vessels of 2000 tonnes (alongside berthing facility). The Slipway will be designed to cater for vessels of 200 tonnes. The project also involves reconstruction of the plot separating the wall from adjacent plot at the eastern side. The proponent of the proposed project is Fuel Supplies Maldives Pvt Ltd (FSM). Fuel Supplies Maldives, incorporated on 18th December 2000 is now a joint venture between State Trading Organisation (STO) and the Maldives National Oil Company (MNOC) formed with the main objective of streamlining fuel distribution in the country and to offer easy and convenient access to fuel throughout the country (FSM website, accessed March 2013). The total estimated cost of this project is ME 1.5 million. This document presents the findings of an Environmental Impact Assessment (HA) for the repair of the existing slipway and modification of seaward wharf of the plot used by ESM Pvt Ltd in Thilafushi. Developers of such development projects are required to carry out EIA. studies under the Environmental Act of Maldives. The developer is required to obtain approval of the Environmental Protection Agency (EPA), prior to the implementations of any development activities on the island. Land and Marine Environmental Resources Group Pvt Ltd have been engaged by FSM Pvt Ltd to prepare the EIA and to provide assistance in other environmental related activities. This HA is prepared in accordance with Environmental Impact Assessment Regulations 2012 and the environmental policy and guidelines of the Government of Maldives. Technical ReportItem Environmental impact assessment : for the proposed reclamation of 25.79 hectares at Eydhafushi island, Baa Atoll, Maldives(2013-07-01) Ministry of Housing and InfrastructureThis report discusses the findings of a social and environmental impact study undertaken by Water Solutions Pvt. Ltd. upon request from Ministry of Housing and Infrastructure. The project involves reclamation of 25.79 hectares in Eydhafushi island, Baa Atoll. The project aims to increase the available land space in Eydhafushi island, mostly to address the housing needs of the community. This EIA report discusses the findings of the reclamation project. The project is proposed by Ministry of Housing and Infrastructure. One of the biggest development challenges facing Eydhafushi island is lack of space for further development. Reclamation is a realistic need for the island as the island is presently saturated with no additional land for housing plots nor industrial activities. The present population of the island is roughly 3190 (Eydhafushi Island Council, 2013). The island council has got more than 400 applications for new housing plots. None of these applications can be processed at present. Existinghouses are overcrowded and too many families having to live in the same house is creating social and health issues. Due to lack of space, quite a number of houses have now been constructed to at least two or more storey’s. Unfortunately, the island council is unable to allocate new housing plots due to lack of space. Twenty five (25.79) hectares will therefore be reclaimed from the south and south east side of the existing island that would be developed and zoned for both residential and commercial use. Reclamation is therefore a serious necessity for the people of Eydhafushi. Environmental impacts were assessed and most of the environmental impacts of the project have been identified as resulting from the dredging and reclamation works. Dredging and reclamation projects constitute significant amount of sedimentation and it is the biggest threat to the marine environment. Mitigation measures for the negative impacts have been identified and outlined in detail, and sedimentation control methods have been specifically focused due to its seriousness. The most important mitigation measure is the use of bund walls in the fill areas to contain sedimentation of the remainder of the reef or at least minimize it significantly. The proposed mitigation measures will have to be followed in order to minimize environmental damage. The measures proposed to minimize or mitigate environmental impacts may be considered to be quite appropriate, thereby minimizing the impact by about 90%. The main negative environmental impact of the proposed project would be sedimentation and destruction of the lagoon and a large area of the reef, which will cause death of corals in the direct impact zone and partial death of corals in other areas. A coastal protection method and extents have also been suggested in the EIA in order to protect the shoreline. The project is mainly driven by the social and economic gain for the development of Eydhafushi island through benefits achieved from increased land. The project is also expected to affect the house reef of Sonevafushi indirectly through sedimentation. Stakeholder consultations were held with various groups, including the island council and the client in order to incorporate the socio-economic components in the project. Stakeholders, most importantly the island community represented by the Island council was the most significant as they have the maximum knowledge and experience from the daily difficulties faced and issues of the island. On a daily basis, the council receives request / complains from the general public on various issues and these have been incorporated in the report. Discussion and information were given to the management of Sonevafushi resort regarding the project and their concerns and views were also incorporated in the stakeholder consultations. The project would have a lot of negative environmental impacts. However,balancing these negative impacts and the socioeconomic benefits gained is something that is very difficult to measure. As a result, a comprehensive monitoring component has been suggested which takes in to consideration, the most important elements that require monitoring, most importantly a mechanism and means to measure and value the social benefit of the project. This monitoring component will be adhered and will allow the assessment of long term changes, despite the potential negative impacts. As the socio-economic impacts are going to be felt in the long term, monitoring these changes is very essential. The reclamation of Eydhafushi does pose significant threats to the marine environment as a large area of the reef will be destroyed. The project also pose some challenges to the environment and operation of the nearby resort, Sonevafushi. There will be direct and indirect damage to corals in the vicinity of the project site as well as indirect sedimentation impacts to the neighbouring resort, Sonevafushi. Despite these negative impacts, this project will benefit the community of Eydhafushi significantly through increased availability of land for housing and commercial activities. The limited space available for reclamation in Eydhafushi is something that has its long term impacts. With the implementation of this project, the entire reef system will fully besaturated and there will not be any opportunities for further reclamation. While this is the long term outlook, the area available for expansion on the other is very limited and although there are advantages, the project does pose serious questions about the future development of the island. The additional land created will provide a temporary solution for housing and other commercial activities, but for a limited period. Unless this land is utilized in the most efficient way, the benefits will not last long. The government in collaboration with the Island council therefore needs to develop a practical master plan to utilize the additional land in a way to sustain a balance between development and land use. Land use planning should consider the housing needs for the future generation as well as balance with economic and recreational facilities. These are questions that need to be answered as otherwise; the reclaimed land will be fully saturated within a matter of few years Technical ReportItem Environmental impact assessment for the development of MNDF coast guard base and berthing facility phase 1- reclamation works, Uthuruthilafalhu, North Male’ Atoll(2013-03) Land and Marine Environmental Resources Group Technical ReportItem Environmental impact assessment for construction of sand filled deck at Bandos Island Resort and Spa(2013-03) Land and Marine Environmental Resources GroupThe non-technical summary outlines the findings of the Environmental Impact Assessment of the proposed construction of a sand filled sun deck on Bandos Island Resort and Spa, by the resort management as the proponent of the project. Bandos Island Resort and Spa located in Nort The project involves the construction of a sand filled sun deck on the southern margin of the small harbour facility on the southwestern side of the island. The area is currently filled with rock and rubble which was excavated during the construction of the harbour facility. Hence by constructing the sun deck, the resort management is looking into making the area usable and aesthetically more pleasing to the eye. Sand for this project will be sourced from the harbour basin and additional material will be purchased should this not be sufficient. The sun deck would be protected by a seawall constructed using sand/cement bags with a smooth cement finish. The total estimated cost of this project is USD 00,000 including sand filling works and construction of revetment walls. Key impacts, mitigation measures and alternatives Impacts on the environment from various activities of the project development work (constructional impacts) and post constructional impacts have been identified through interviews with the resort management team, field data collection and surveys and are also based on past experience of consultant in similar development projects. Impact analysis was done using the Leopold matrix. The main impact associated with the project is minor short term impact on the marine ecosystem quality of nearby areas (to burrow area) due to sedimentation (as a result of dredging activities). No negative impacts on the environment are expected during the post constructional phase, although a huge positive impact in terms of the utilization of an area which has been impacted and unusable is guaranteed. Mitigation measures have been discussed for the construction stage of the project. The main mitigation measure proposed is the construction of a bund and seawall around the area for sundeck construction prior to backfilling the area, in order to avoid release of fines and minimize sedimentation impact. Detailed mitigation measures are discussed in Section 11 of the report. Given the small scale of the project the only component for which an alternative has been considered is in terms of the material used to construct the sea wall. The - option has also been considered, though this would mean that the area remains unusable and filled with rock and rubble. It also means that there would be no impact on the environment from development of this project. The proposed development is assessed to bring minor short term impacts to the environment in general. Hence the "no-project" scenario is not seen as a feasible option and it is the conclusion of the consultant that the project can be carried out with minimal impact on the environment, with the proper implementation of mitigation measures discussed in the report. Technical ReportItem Environmental impact assessment for coastal modification works at Robinson Club Maldives, Funamaudua, GA. Atoll(2013-04) Land and Marine Environmental Resources GroupThe non-technical summary outlines the findings of the Environmental Impact Assessment of the proposed construction of geo-bag revetment structure at Robinson Club Maldives (GA. Funamaudua). The proponent of the proposed project is Robinson Club Maldives. The total estimated cost of this project is USD 1.5 million. The proposed project involves the construction of a 215 m long geo-bag revetment structure on the northwestern side of the island from the deck area of the main restaurant up to the jetty to the water villas. The project also involves maintenance dredging work at the entrance and channel on the southwestern side of the island and removal of tombolo formed near the service islet. Impacts on the environment from various activities of the construction work and during the operation of the facility have been identified through interviews with the project management team, field data collection and surveys and are also based on past experience of consultant in similar development projects. The impacts identified are also described according to their location, extent and characteristics. Mitigation measures have also been identified for impacts which are irreversible in nature. Impact analysis was done using the Leopold matrix. The main impacts foreseen for the construction phase are the impacts on marine environment and habitat in terms of loss of habitat, disturbance to lagoon bottom and reef flat area and sedimentation impacts. However, these impacts are expected to be minor to moderate at the entrance channel. Sedimentation impacts due to both maintenance dredging at entrance channel and revetment bed leveling works are also envisaged to the minor to moderate due to low live coral cover at the areas and small scale of work. During the operational stage, the small islet is expected to be a cause of formation of future tombolo. Therefore shoreline monitoring is one of the key mitigation measures recommended in the report. Positive impacts due to the project are expected to be beach formation due to accretion of sand by natural process as a result of the gradual slope of new revetment structure. Alternatives have been considered for various components of the project and are given as possible options that may be either more practical or less expensive to the preferred options. The proposed alternatives also have taken into consideration the environmental consequences resulting from these options as compared to the preferred options. The following components of the project have been discussed in providing their alternatives; Coastal protection method Design and materials used for construction of revetment structure Method of excavation Burrow area location The no-project scenario is also considered, which would mean that all environmental impacts due to the project would no longer be an issue. However, given that impacts to the environment due to the project are minor to moderate, this option is not seen as a feasible option, as the benefits to the proponent in terms of environmental advantages (control of current erosion issues due to presence of tombolo) and financial advantages (currently, damage to restaurant deck area makes it unsafe for guest use) from the continuation of the project, outweigh the impacts on the environment due to the implementation of the project. Details of the various alternatives considered and the selected alternatives are shown in Section 9 of the report.