Environment - ތިމާވެށި
Browse
52 results
Search Results
Technical ReportItem Environment impact assessment for the proposed construction of Island Waste Management Centre at Maabaidhoo, Laamu Atoll(2017-10) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to construct the Island Waste Management Centre (IWMC) in Maabaidhoo, Laamu Atoll. The proponent of this project is United Nations Development Programme (UNDP) The contractor for this project is Uni Maldives Private Limited. The main rationale for the project is to establish a sustainable waste management system in the island so that the waste is disposed and managed properly. The project is intended at constructing an island level waste management centre, with a compost ground and machineries and equipment to collect and to manage the waste. This project forms part of Low Emission and Climate Resilient Development (LECReD), a United Nations joint programme which seeks to mainstream LECReD issues into local development planning and service delivery for greater community-level ownership and sustainability of programme benefits. The proposed project involves the construction of the waste management centre. The IWMC will have a compost pit, waste segregation lots, equipment room, toilet, rainwater tank. This will be implemented as part of this project. The proposed IWMC will measure 89ft by 83ft and will be built at southern tip of the island. The proposed centre will be developed to manage the waste generated in the island and to ensure proper and sustainable disposal of waste. The waste management centre will also composting tools, compacting machineries to manage the waste. A truck of 1.5 tonnes and bins will be provided for waste collection. The duration of the construction of IWMC will take approximately 3 months. Once constructed, it will be handed over to the council for operation. The island community previously disposed waste at different locations of the island and the waste is not segregated. Following the efforts during the mangrove conservation project, all waste is now disposed to the location designated to build the IWMC under this project. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012 and Waste Management Regulations and Maldivian Land Act and Decentralisation Act. The existing condition of the island and the proposed IWMC was assessed for this report. Assessments conducted include groundwater quality assessments, and terrestrial assessments. Baseline noise levels were also recorded at the site. The assessment shows that during construction stage of IWMC, main impacts will be increased noise level, air quality degradation, loss terrestrial flora and fauna. The proposed location is a vegetated area where already most of the vegetation has been cleared. However, prior to construction few of the pioneer species will need to be cleared. Other impacts during construction stage possible contamination of groundwater and soil due to leakage of chemical and oil. During operational stage, the most significant impacts on the groundwater, greenhouse gas emission and on biodiversity. If the IWMC is poorly constructed including composting pit, likelihood leachate leaking into the ground is high and this may have irreversible impacts on groundwater quality. During operational stage, the IWMC may be receiving waste that cannot be managed at the site if unsupervised, this may result in open burning waste that result in the emission of toxic gases and chemicals which will degrade the air quality and cause GHG emission. Accumulation and mismanagement of waste also has the tendency to impact the biodiversity in the island whereby certain species are replaced by crows and rats, which will feed on waste stockpiles. The proposed is an aesthetically pleasing site and the visual amenity of the area will also be disrupted. Since the proposed site used to be a wetland, before it was reclaimed from waste, risk of flooding the area during swell tides or torrential rain is high. This may significantly impact the operation of the IWMC. Proper mitigation measures must be taken to reduce the risk of flooding. Overall this is an environmental improvement project.. Through composting and selling recyclable materials the project will also open up business opportunities for the island. In addition, irresponsible dumping and littering around the island may be stopped following the implementation of IWMC and waste management plan. The alternative options were evaluated for the no project option and alternative locations for IWMC. The “No Project” option is deemed infeasible, given the current condition of waste management and disposal in the island. Alternative locations for IWMC were also considered, however as there are no other apt locations in the island, it is proposed to go ahead with the proposed location, with stringent measures to mitigate flooding in the area. Monitoring plan is designed to assess any changes to the physical of the island, ground water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at MVR 25,000 – 35,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Maabaidhoo Island council, Maabaidhoo public, Laamu Atoll Council, Ministry of Environment and Energy, Ministry of Housing and Infrastructure and Environmental Protection Authority. Both Maabaidhoo Island Council and public are in favour of this project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. Operational stage impacts are mainly on climate change, groundwater contamination and on biodiversity. Overall, the project will have positive impacts to the island community under supervised and effective management of the IWMC. . The EIA recommends to go ahead with the project and to develop the IWMC and to follow the mitigation measures to avoid significant impacts. Stringent mitigation measures must be taken to reduce the risk of flooding at the proposed location. It is strongly recommended to develop and implement an environmental management plan to maximise the benefits of IWMC and ensure sustainability of operations. Technical ReportItem Environmental impact assessment for the proposed development of an agricultural island Dhurureha Thaa Atoll, Maldives(2017-09) SandcaysThis report discusses the findings of a social and environmental impact study under the proposed development of agriculture on Dhururehaa, Thaa Atoll. The project is proposed by Mohamed Latheef. The proponent aims at developing Dhurureha as an agricultural island; providing job opportunities, reducing dependency on imported produce and ultimately working towards economic diversification and growth of Maldivian economy. The agricultural activities on Dhurureha will be carried out in greenhouses as a hydroponics system. A total of 12 greenhouses (100ft by 50ft each) is proposed to be built for growing tomato, capsicum, bell pepper and lettuce. Additionally, a 60m by 30m nursery will be built on the island. Access to the island is to be provided by dredging an access channel and a 200m jetty. Water requirement for the project is to be met by utilizing an RO plant. A suitable size diesel generator will be used throughout the project to meet power requirement. Staff facilities such as accommodation, mesh room, mosque and office building will also be constructed on the island. A cold storage, general storage and small packaging facility will also be constructed on the island during construction stage. A waste collection and management station will be established for using during construction phase and operational phase of the project At present, Dhurureha is an uninhabited island not used for any purpose. However, locals of the nearby communities use the island to collect coconuts, go on picnics and gather firewood. Alternatives to project components have been identified in the project document. These include alternative uses of the island such as for a tourist resort. However, upon closer analysis of these options, the proposed development of the island for agricultural purpose was found to be more viable based on the present circumstances under which the island has been leased. Therefore, the consultants propose exploring use of alternative renewable sources to the proposed fuel based energy generation. Environmental impacts were assessed for both the construction and operation phase of the project. Most of the environmental impacts of the project have been identified as minor negative with highly positive socio-economic impacts. The main negative impacts from the project include habitat loss from vegetation clearance, sedimentation and consequent impacts on marine wildlife health and waste generation during the operational phase. The mitigation measures outlined for these impacts include conserving mature trees to the greatest possible extent, relocating large live corals at the proposed access channel area and establishing dust control plans in addition to employing best-practice guidelines during the operational phase. The most positive socio-economic impacts related to the project are increase in job opportunities, reduction in prices of agricultural produce and increase of national revenue. It is inevitable that there would be some negative environmental impacts. However, most of the impacts of the proposed project are minor compared to the positive socio-economic benefits of the proposed system. Yet, monitoring to ensure the effectiveness of the proposed project would be necessary. Therefore, a monitoring component has been suggested which takes in to consideration, the most important elements that require regular checks. This monitoring component will be adhered to and will allow the assessment of changes due to construction and implementation of the proposed agriculture project. Monitoring is specifically focussed on employment opportunities, price changes in the market, direct and indirect economic ventures, ground and marine water quality, changes in the hydrodynamics of the project area as well as impacts on the reef or marine ecological area of importance. In conclusion, it appears justified from a technical and environmental point of view, to carry out the proposed project to develop Dhurureha as an agricultural island. Technical ReportItem Environmental management plan for the proposed development of Island Waste Management Center in TH. Vandhoo(2017-09) Zuhair, Ahmed HassaanThe proposed development of Island Waste Management Center (IWMC) in Th Vandhoo is funded by the Public Sector Investment Program (PSIP) of the Government of Maldives. The aim of this project is to alleviate current waste management problems endured by the island community and thereby improve the overall environmental and public health condition of the island. The proposed IWMC will be developed in a 500 square meters’ area located in the South East side of the island. This site is at a considerable distance away from the residential population and vegetation line and meets the land allocation criteria of both Maldives Land and Survey Authority (MLSA) and Environmental Protection Agency (EPA). At present, no major vegetation exists in the site except some scrubs. However, according to the information provided by the Island Council, 7 mature coconut palms and 3 mature trees (Alexandrian laurel) were previously present at the site. The Island Council has been undertaking land clearance works since 2015, as the site has been identified by the council to develop IWMC in 2015. An EPA declared environmentally sensitive mangrove area exists in the north western side of the island. However, this area is 400 meters away from the proposed IWMC and therefore, no negative impacts to this area are envisaged to occur as a result of the project. The project will provide basic infrastructure necessary to manage waste at island level and ensure composting is undertaken in the island. After completion of civil works, the IWMC will be operated by the Island Council in accordance to the Island Waste Management Plan. Training on composting for island level staffs and machinery such as, shredders, wood chippers and bottle crushers will be provided to facilitate adequate functioning of the IWMC. Waste that is not manageable at the island level will be stored and regularly transferred to a regional waste management facility (RWMF). All civil works of the project are expected to be completed within 6 months. Environmental impacts of the project were evaluated using the Rapid Impact Assessment Method (RIAM). Majority of the impacts envisaged for the project are highly positive. The project is expected to bring numerous economic benefits to the island community, in additional to the perceivable environmental and public health related benefits. The only permanent negative impact likely to occur as a result of the project is related to the removal of vegetation. However, the amount of vegetation clearance involved is minimal and therefore, if the mitigation measures proposed in this management plan are adhered, almost all the negative impacts can be brought to an acceptable level. The monitoring program proposed in the EMP will ensure the implementation of the mitigation measures and assist in the identification of unforeseen impacts throughout the project. Overall, the project is expected to provide significant socio-economic and environmental benefits for the local community. Technical ReportItem Environmental impact assessment proposed milkfish aquaculture project Matu, Gaafu Alif Atoll(2017-07) SandcaysThis report addresses the environmental concerns of the proposed milkfish (Chanos chanos) hatchery project in Ga. Matu. The project is proposed by Ministry of Fisheries and Agriculture. Concerns about live-bait availability over prolonged periods are being raised in recent years, especially in the southern atolls of Maldives. The development of aquaculture for selected bait species is seen as one possible measure to manage the live bait shortage currently faced by local fishermen. Cultured milkfish has been in use for the longlining industry in different parts of the world, and successfully piloted for the pole-and-line industry in Indonesia and Kiribati. Unlike most of the live bait species currently in use in the pole-and-line fishery, hatchery technology is well developed for milkfish. In addition, the relatively short duration to reach bait-size makes milkfish an ideal species for aquaculture development. Supplementing the tuna fishermen with cultured bait is expected to reduce the time spent on bait search, and in turn, result in increased effort directed to the tuna fishery. As live bait shortage is mostly reported from the southern atolls, the proposed hatchery site was selected from Gaafu Alif atoll, for logistical ease in distribution for the most needed areas can be made. The selected island, Matu from Ga. Atoll is 5.9 Ha small uninhabited island on the northern side of Ga.Atoll. The closest inhabited islands to the project site are Ga. Villingili and Kolamaafushi. The project aims to produce 100 tons of milkfish raised to the size of live bait used in the pole-and-line fishery. All required technical and support infrastructure will be constructed during the construction phase of the project. The operational phase will involve water circulation, feeding and rearing of cultured stock. In addition to hatchery, nursery and broodstock modules built on land, sea cages will be built for brood stock. Power will be provided for the project via diesel generators, while potable water will be provided via RO plants. Accommodation for staff and administrative buildings and waste management centre will also be constructed on the island. Access to the island will be provided via access channel and a jetty. The naturally deep lagoon will be used as a harbour during the project. Social and environmental concerns regarding the proposed project include: • Vegetation clearance during site preparation for construction of land infrastructures. This impact is considered minor negative as outmost care will be taken to reduce cutting down mature vegetation. Buildings will be adjusted as much as possible to reduce requirement of cutting or relocation of mature trees. When unavoidable, two plants for every tree cut will be planted on the island. • Sedimentation during excavation of access channel and construction of main jetty. This impact is considered as negligible as the excavation involved is very minor. Measures to reduce this impact such as working during calm weather and low-tide has been suggested as mitigation measures. • Minor impacts due to human activity in the area including littering both during construction and operational phases. • Increased nutrient loadings from faeces and uneaten food wastes, which will either dissolve or settle on the seabed beneath the cage. Since the water is deep and adequate currents exist, eutrophication is, however, unlikely. The proposed project is expected to be managed in conformity with local and international regulations and standards of relevance, especially environmental regulations and standards. Therefore, environmental impacts will be well managed, minimized and mitigated. Given that the project has major socio-economic benefits and some environmental benefits (potential to reduce pressure on wild populations of baitfish), it is recommended to allow the project to proceed as proposed. It is important to consider uncertainties and continue to monitor the project impacts and undertake appropriate mitigation measures in consultation with the EPA and other relevant government agencies. It is also necessary to undertake regular environmental monitoring activities. Technical ReportItem Environmental impact assessment proposed 13 storey building construction at M. Dhimyaath, Male’(2017-09) Jameel, Ahmed; Mohamed, HamdhoonThis report is based on the proposed 13 storey building construction at the residence, M. Dhimyaath in the capital city, Male’. The project is being developed and constructed by Dr. Mohamed Muizzu. He will be undertaking the construction works and project management including overseeing the EIA process. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under ‘Jadhuvalu R’ of the Environmental Impact Assessment Regulations 2012 of the Maldives. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions based on favorable environmental conditions with the main focus on sustainability. The project also adheres to several other rules and regulations in the Maldives and has obtained permit from the Ministry of Housing and Infrastructure to proceed. The area the project is proposed to be undertaken is a moderately built area in the heart of Male’, more towards the south western side. There is no natural terrestrial environment at site. The existing environment therefore was focused on the regional climate of Male’, and the traffic distribution, and noise pollution in the area. As could be seen from the data, this area does not encourage much traffic relative to the busier roads in Male’. There were several existing construction sites in the neighborhood. A general exterior overview of the existing structures in the area was also observed. It was found that most of the buildings in the area were in good condition. Older buildings were mostly single storey structures. Therefore, serious structural defects are expected to be at a minimum. However, the report recommends to undertake a structural defects inspection study of the buildings in the same block as the proposed site by civil engineering experts. The overall environmental impacts of the project have been assessed using frameworks found in literature. Since the development is undertaken in a moderately built area, the results indicate that the proposed project has neutral impact. However, there are some significant impacts on the environment during the construction phase of the project and these needs to be mitigated to avoid any significant damage to the environment. Significance of the impacts and mitigation measures have been provided based on previous similar projects undertaken in the Maldivian environment and based on literature. The main cause for concern regarding this project is the impact it will have on neighbours residing in this area. As such, several short-term impacts are envisaged including air pollution, noise pollution, aesthetic impacts, and safety concerns. As there are numerous high storey building projects being undertaken in Male’, there is no particular long term impact associated with this project. One significant impact specific to this project is the cumulative impact on the neighbourhood due to the sheer no. of construction projects that are simultaneously undertaken in the area. The impacts that do occur however can be easily mitigated to minimise and/or completely nullify them. The first mitigation measure proposed includes creating awareness among the construction staff and neighbours regarding the scope of the project. Other measures include properly demarcating the area, putting up dust screens, and taking other protective measures to ensure people residing and utilising the vicinity will not have to endure the impacts during the construction stage. Foundation protection measures are recommended and are provided as part of the project to prevent impact on neighbouring structures. Dewatering procedure also needs to be undertaken with care, details of which are given in the report. During the operation stage of the project, parking and waste management are issues of note. Alternatives, including the no project option and alternatives for some project components are also discussed. Regarding project design, a few alternatives are recommended such as providing a green area at the terrace, while the pros and cons of making a larger parking area is also discussed. An environmental monitoring program is provided at the end of the report, which provides details on the parameters to monitor on site, and the frequency in which it needs to be done. Estimated costs for the monitoring works are given. Implementation of the program is essential for the sustainable development of the project. In conclusion, it is discussed the impact such major housing projects have for the increasing population density in Male’, and how it can be prevented at a policy level. However, taking this project as a standalone development project in an already heavily built island city, it can be concluded that no significant long-term impacts are predicted. Therefore, it is recommended that the project go ahead as proposed with precautions and mitigation measures in place. Technical ReportItem Addendum 1 for environmental impact assessment of Hulhule-Hulhumale connecting link road development project in North Male‟, Atoll(2017-09) Water SolutionsThis report discusses the findings for the first addendum of the environmental impact assessment undertaken by Water Solutions Pvt. Ltd for undertaking the construction of the link road project between Hulhule-Hulhumale.. The project is proposed by Housing Development Corporation (HDC). The island of Hulhumale has been an important growth centre since its development. Presently, Hulhumale is the fastest growing urban centre and has residential as well as industrial developments to a scale that has never been experienced anywhere in the Maldives. Being close to Male‟ and the airport, Hulhumale has been attracting migrants from all over the Maldives. Construction of the Male‟ to Hulhule Bridge is presently the biggest infrastructure project of its kind under construction in Maldives. This project is very much tied with the present link road as this link road will provide direct connection of Hullhumale and the bridge, ultimately making the traffic flow from Hulhumale to Male‟. This road will be constructed on the east side of the existing land mass of Hulhule airport by reclaiming a small area further west of the existing island. The proposed road will consists of three zones. The details of the link road project is given in the Environmental Impact Assessment Report which is prepared by Water Solutions in August 2017 and the reason for the preparation of this first addendum report is due the change in location of sand burrow areas. In the Environmental Impact Assessment Report it was said that the sand will be obtained from the Hulhumale‟ phase 2, phase 1 and Maldives Airports Company Limited (MACL). However now that idea has been dropped out and it is now planned to obtain sand from the eastern side of Uthuru Thila Falhu and the bathymetry shows the depth varies between 40 to 60 meters approximately. The details of the geographic coordinates are given in the section project descriptions and Study Area. This lagoon has been used as a sand burrow area for previous similar projects and is estimated to dredge 410,000 cubic meters of sand from this location. The dredging project is subcontracted to the Dredging International (Cyprus) and it is estimated to complete the project in five to seven days. Environmental impacts were assessed and most of the environmental impacts of the project have been identified as resulting mainly from the coral reef damage caused by reclamation of additional land. Mitigation measures for the negative impacts have been identified and outlined in detail, especially sedimentation control methods. The most important mitigation measure is the use of bund walls in the fill areas. This EIA addendum was undertaken to assess the environmental impacts of the proposed dredging and reclamation to acquire more land for the link road construction project. Based on the assessment, it has been identified that the major impacts of the project will be felt on the marine environment during the dredging and discharging of sand. This EIA addendum report also highlights some of the studies and research work undertaken in similar environments, especially in Male‟، to understand the impacts of reclamation and construction works close to reef slope and how this knowledge can be transferred to similar environments based on the type of coastal protection methods in use. The mitigation measures are provided in the report with alternatives. It is vital to conduct the activities, during both project planning and construction phase, in line with mitigation measures emphasized in the report. Socio-economic impacts of the proposed project will be immense as direct land connection of Male‟ and Hulhumale would bring significant benefits to the general public. Connection of Hulhumale, Male‟ and the airport is a vital transportation link that would save time and money for more than 200,000 people residing in the greater Male‟ region. The environmental impacts of various projects that are currently being undertaken in the airport region have caused significant damage to reef in various areas. This project will also have its impacts, but the impacts will not be anything greater than to what the environment has already been subjected to. Therefore a comprehensive monitoring programme has been suggested which covers components of coastal and marine environment to assess how the critical components of this project will affect the environment and to what extent. It is important to follow this monitoring programme not only to comply with the regulation but also to ensure that the impacts are measures in realistic terms. Though some of the components of this project contravenes with the Dredging and reclamation regulation; the amendments brought to the regulation facilitates that this project could be implemented. Hulhule island is a special zone and Under clause 10 of the dredging and reclamation regulation, special projects are exempted. As the environmental consultants, it is our opinion that this project should be allowed to proceed as the environmental impacts of this project does not pose serious concerns to the natural environment. It is a project that has far greater socio-economic benefits than these limited environmental impacts. Technical ReportItem Environment impact assessment for the proposed construction of island waste management centre at Kunahandhoo, Laamu Atoll(2017-10) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to construct the Waste Management Centre (IWMC) in Kunahandhoo, Laamu Atoll. The proponent of this project is United Nations Development Programme (UNDP). The main rationale for the project is to establish a sustainable waste management system in the island so that the waste is disposed and managed properly. The project is intended at constructing an island level waste management centre, with a compost ground and machineries and equipments to collect and to manage the waste. This project forms part of Low Emission and Climate Resilient Development (LECReD), a United Nations joint programme which seeks to mainstream LECReD issues into local development planning and service delivery for greater community-level ownership and sustainability of programme benefits. The proposed project involves the construction of the waste management centre. The IWMC will have a compost pit, waste segregation lots, equipment room, toilet, rainwater tank. This will be implemented as part of this project. The proposed IWMC will measure 84ft by 89ft. The proposed centre will be developed to manage the waste generated in the island and to ensure proper and sustainable disposal of waste. The waste management centre will also composting tools, compacting machineries to manage the waste. A truck of 1.5 tonnes and bins will be provided for waste collection. The duration of the construction of IWMC will take approximately 3 months. Once constructed, it will be handed over to the council for operation. At present, there is no designated site waste disposal. The island community disposes waste at different locations of the island and the waste is not segregated. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012 and Waste Management Regulations and Maldivian Land Act and Decentralisation Act. The existing condition of the island and the proposed IWMC was assessed for this report. Assessments conducted include groundwater quality assessments, and terrestrial assessments. Baseline noise levels were also recorded at the site. The assessment shows that during construction stage of the IWMC, main impacts will be increased noise level, air quality degradation and loss terrestrial flora and fauna. The proposed location is a vegetated area where already most of the vegetation has been cleared. However, prior to construction few of the pioneer species will need to be cleared. Other impacts during construction stage possible contamination of groundwater and soil due to leakage of chemical and oil. During operational stage, the most significant impacts on the groundwater, greenhouse gas emission and on biodiversity. If the IWMC is poorly constructed including composting pit, likelihood leachate leaking into the ground is high and this may have irreversible impacts on groundwater quality, especially given the island has low groundwater lens is prone to flooding. The IWMC may be receiving waste that cannot be managed at the site if unsupervised, this may result in open burning waste that result in the emission of toxic gases and chemicals which will degrade the air quality and cause GHG emission. Accumulation and mismanagement of waste also has the tendency to impact the biodiversity in the island whereby certain species are replaced by crows and rats, which will feed on waste stockpiles. The visual amenity of the area will also be disrupted. However, through composting and selling recyclable materials the project will also open up business opportunities for the island. In addition, irresponsible dumping and littering around the island may be stopped following the implementation of IWMC and waste management plan. Overall this is an environmental improvement project. The alternative options were evaluated for the no project option and alternative locations for IWMC. The “No Project” option is deemed infeasible, given the current condition of waste management and disposal in the island. Alternative locations for IWMC were also considered, however as there are no other apt locations in the island, it is proposed to go ahead with the proposed location, since the IWMC will be built with 1ft elevated as a mitigation measure. Monitoring plan is designed to assess any changes to the physical of the island, ground water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at MVR 25,000 – 35,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Kunahandhoo Island council, Kunahandhoo public, Laamu Atoll Council, Ministry of Environment and Energy, Ministry of Housing and Infrastructure and Environmental Protection Authority. Both Kunahandhoo Island Council and public are in favour of this project, although the newly elected council not fully acquainted with the project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. Operational stage impacts are mainly on climate change, groundwater contamination and on biodiversity. Overall, the project will have positive impacts to the island community under supervised and effective management of the IWMC. . The EIA recommends to go ahead with the project and to develop the IWMC and to follow the mitigation measures to avoid significant impacts. It is strongly recommended to develop and implement and environmental management plan to maximise the benefits of IWMC and ensure sustainability of operations. Technical ReportItem Environment impact assessment for the proposed construction of island waste management centre at Dhanbidhoo, Laamu Atoll(2017-10) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to construct the Waste Management Centre (IWMC) in Dhanbidhoo, Laamu Atoll. The proponent of this project is United Nations Development Programme (UNDP). The main rationale for the project is to establish a sustainable waste management system in the island so that the waste is disposed and managed properly. The project is intended at constructing an island level waste management centre, with a compost ground and machineries and equipments to collect and to manage the waste. This project forms part of Low Emission and Climate Resilient Development (LECReD), a United Nations joint programme which seeks to mainstream LECReD issues into local development planning and service delivery for greater community-level ownership and sustainability of programme benefits. The proposed project involves the construction of the waste management centre. The IWMC will have a compost pit, waste segregation lots, equipment room, toilet, rainwater tank. This will be implemented as part of this project. The proposed IWMC will measure 98ft by 98ft and it will be developed on the southern tip of the island. The proposed centre will be developed to manage the waste generated in the island and to ensure proper and sustainable disposal of waste. The waste management centre will also composting tools, compacting machineries to manage the waste. A truck of 2 tonnes and bins will be provided for waste collection. The duration of the construction of IWMC will take approximately 3 months. Once constructed, it will be handed over to the council for operation. The location, which has been approved, by EPA and MLSA is approximately 1km from the residential and requires the development of an access road. This will incur additional cost and the distance also makes it impractical to transfer waste on a daily basis. At present, there is no designated site waste disposal. The island community disposes waste at two different locations of the island and the waste is not segregated. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012 and Waste Management Regulations and Maldivian Land Act and Decentralisation Act. The existing condition of the island and the proposed IWMC was assessed for this report. Assessments conducted include groundwater quality assessments, air quality and terrestrial assessments. Baseline noise levels were also recorded at the site. The assessment shows that during construction stage of the IWMC, main impacts will be increased noise level, air quality degradation and loss terrestrial flora and fauna. The proposed location is a vegetated area where already some of the vegetation has been cleared. However, if the allocated site is chosen for the construction of IWMC, an access road will need to be developed which will require more vegetation to be cleared including palm trees. Other impacts during construction stage possible contamination of groundwater and soil due to leakage of chemical and oil. During operational stage, the most significant impacts on the groundwater, greenhouse gas emission and on biodiversity. If the IWMC is poorly constructed including composting pit, likelihood leachate leaking into the ground is high and this may have irreversible impacts on groundwater quality. The IWMC may be receiving waste that cannot be managed at the site if unsupervised, this may result in open burning waste that result in the emission of toxic gases and chemicals which will degrade the air quality and cause GHG emission. Further to this, distance to the IWMC from the residential zone means a longer commute route which will further contribute to GHG emission from transportation. Accumulation and mismanagement of waste also has the tendency to impact the biodiversity in the island whereby certain species are replaced by crows and rats, which will feed on waste stockpiles. The visual amenity of the area will also be disrupted and given that the nearest island in the vicinity will be developed to a resort this poses major issues in the long term. However, through composting and selling recyclable materials the project will also open up business opportunities for the island. In addition, irresponsible dumping and littering around the island may be stopped following the implementation of IWMC and waste management plan. The alternative options were evaluated for the no project option and alternative locations for IWMC. The “No Project” option is deemed infeasible, given the current condition of waste management and disposal in the island. Given the unfeasibility of the proposed site for IWMC due to the long distance for transportation from the residential zone and from the harbour, alternative locations for the IWMC explored. It is recommended that any other location within 200ft from either the northern or southern direction from the residential zone is feasible or building IWMC. This provides a feasible transportation distance from the collection entities also to the harbour where the recyclable materials can be easily traded. Monitoring plan is designed to assess any changes to the physical of the island, ground water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at MVR 25,000 – 35,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Dhanbidhoo Island council, Dhanbidhoo public, Laamu Atoll Council, Ministry of Environment and Energy, Ministry of Housing and Infrastructure and Environmental Protection Authority. Both Dhanbidhoo Island Council and public are in favour of this project, although the newly elected council not fully acquainted with the project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. Operational stage impacts are mainly on climate change, groundwater contamination and on biodiversity. Since the proposed location for the IWMC is not practical in terms of transportation of waste and the need to develop an access road which will incur additional cost, it is recommended to consider alternative locations for the IWMC. Overall, the project will have positive impacts to the island community under supervised and effective management of the IWMC. . The EIA recommends to go ahead with the project and to develop the IWMC at a site that will not cause major loss of biodiversity or cause GHG emissions. It is strongly recommended to develop and implement and environmental management plan to maximise the benefits of IWMC and ensure sustainability of operations. Technical ReportItem Environmental impact assessment proposed mixed use residential complexes in Hulhumale’ hiyaa vehi project(2017-10) Zuhair, Mohamed; Shakir, Ibrahimi) AMIN Construction Pvt. Ltd. proposes to develop 3 Real Estate Complexes for mixeduse residential and commercial purposes in Hulhumale’ known as Hiyaa Vehi Project. The project will be undertaken in 3 land plots (C2-1; C2-2; C2-3) located on Moonimaa Magu and Reethigas Magu. The complex in each land plot will comprise of two residential blocks with a common ground and first floor. The first block (Block A) in each complex will be 13-storey and the second block (Block B) will be 14-storey. The land area of the plots are C2-1 (25,487.52ft2 / 2,367.87m2), C2-2 (27,543.31ft2 / 2,558.86m2) and C2-3 (27,282.07ft2 / 2,534.59m2). Each complex will be developed in a floor area of 14,962ft2 (1,390m2) and the remaining areas will be left as open space. ii) Upon completion of the proposed project, Block A will have 62 apartments and Block B will have 72 apartments in each complex. Hence the total residential use units will be 402 in the three complexes. The Ground Floor and First Floors of the three complexes will be developed as commercial, parking and access ways. A total of 33 car parking slots and over 500 motorcycle parking slots together with some commercial units will be developed in each complex in ground and first floors. iii) The sites will be excavated to a depth of 2.5m to lay the foundations. The entire boundary will be shored with corrugated sheets supported by iron beams as a safety measure while preparing the site ready for construction. The buildings will be developed separately. Each building will rest on a raft foundation. MWSC and STELCO utility services based in Hulhumale’ will be used for all construction and operation purposes. Dewatering will be primarily done on the open areas nearby, hence, no groundwater will be lost from the proposed development. Excavated material will be transported to designated areas in Hulhumale’ 2. iv) The EIA has been prepared as per the EIA Regulations 2012 developed directly under the Environmental Protection and Preservation Act and identifies that development of such buildings exceeding 31m in height and over 10 storeys with greater than 5ft foundation require an EIA to be undertaken and approved by EPA before commencement of construction. Terms of Reference for the EIA was approved by 19 September 2017. v) In addition to Environmental Protection and Preservation Act, EIA Regulations, the project has to comply with Dewatering Regulation, Waste Management Regulation, Hulhumale’ Planning and Building Construction Regulation: Neighborhood 2 and 3, Land Act as well as comply with Maldives National Building Code recommendations. vi) In order to understand existing environmental conditions of the proposed project area, assessments have been undertaken including ambient noise levels, traffic volume and movement, groundwater quality, soil and vegetation, physical condition of the roads. vii) The proposed project will be undertaken in 3 land plots C2-1; C2-2; C2-3. C2-1 is located at 4°13'16.84"N / 73°32'26.01"E. C2-2 is located at 4°13'14.65"N / 73°32'25.79"E and C2-3 is located at 4°13'12.57"N / 73°32'25.59"E. All land plots are located on Moonimaa Magu and Reethigas Magu. viii) The highest noise level was recorded at Site 1 located on the southern side of the project site having 51dB. This is relatively low noise levels compared to other areas due to low traffic and minimal activities that are currently happening in the area. Occasional traffic found on the southern side of the project area raises noise level to a certain degree. Site 2 which is located in the middle of the plots had lesser noise (45dB) as no major activities are happening in the area. Site 3 located on the northern side of the plots had slightly increased noise (49dB) which is attributed to some temporary work happening in the plots. Site 4 located on the western side had the lowest level (43dB) as there are no major activities currently happening in the area. ix) The highest traffic along the road recorded was from motorcycles having 28 during the hourly period. The second highest traffic volume is from cars, mainly taxis having an hourly movement of 12 at the time of the assessment. Some movement of trucks and lorries were seen mainly coming and going out of construction sites. x) The general condition of the soil indicates that upper layers of the soil profile contains medium to dense coral sand with varying depths of loose sand below 2m. Groundwater is found at a depth of 1.4m. xi) The groundwater condition at the site is normal with no peculiar condition of parameters tested, except that some 1 MPN/100ml of Faecal Coliform counts have been recorded from C2-1. However, this is not a serious level. All other sites had 0 Coliform Counts. xii) There are no vegetation found inside the project boundary. However, some mixed mature vegetation are found by the roadside which is out of the proposed project boundary. Hence, there is no requirement for removing these vegetation and there will be no major impacts on these vegetation. xiii) There are currently no buildings adjacent to the proposed plot or the immediate surrounding area, however, some buildings similar to the proposed project is planned to be undertaken within the vicinity. C2-4, which is the southern plot (not part of the project) is getting ready for construction. Also, about 75m southwest of the proposed project, a site is getting ready for construction. xiv) The road condition by the project site namely Reethigas Magu and Moonima Magu are in good condition. No damages and cracks have been observed. xv) The environmental impacts that may be associated with the proposed project are predicted and assumed in the EIA Report. These environmental impacts are divided into construction phase and operation phase environmental impacts. Most of the construction phase environmental impacts are believed to occur from excavation, dewatering, construction activities, operation of construction machinery and vehicles and construction waste disposal. The main environmental impacts believed to occur during operation phase of the project include domestic waste and increased traffic within and around areas. xvi) With appropriate environmental management and mitigation measures as well as conformity to all the legal and regulatory requirements as outlined in the EIA Report, the project is believed to control or minimize most of the environmental and social impacts both during construction and operation phases of the development. Important considerations with regards to mitigating environmental impacts include closing the boundary of the project area, placing safety and dust nets around the building, regularly transporting construction waste and avoiding material transport during peak traffic hours as well as designating proper time periods for construction works have been identified. xvii) Unlike short-term environmental impacts from the proposed development, it has longterm beneficial social and economic impacts, which is believed to tremendously contribute to the overall socio-economic development of Hulhumale’ that can be sustained for over longer periods. xviii) Although during construction of the project, negative environmental impacts from construction activities have been envisaged, with appropriate environmental management and mitigation measures, these impacts will be reduced to a considerable level. Also, with positive socio-economic outlook of the project and considering the overall importance of such a development in Hulhumale’ to alleviate social housing stress, it is concluded that the project is an important project that can be implemented for the benefit of social and economic development. Technical ReportItem Environmental impact assessment report development of 100 bed hospital at Addu City(2017-10) Land and Marine Environmental Resources Group1.1 Background The non-technical summary outlines the findings of the Environmental Impact Assessment of the construction and development of a 100 bed tertiary level hospital at Hithadhoo, Addu City. The proponent of this project is the Ministry of Housing and Infrastructure and total estimated cost of the project is approximately MVR 162 million. The proposed project will be developed through redevelopment of the Equatorial Convention Centre which was developed in Addu City to host the SAARC Summit in 2011. Parts of some ponds introduced for aesthetic and flood control purposes within landscaping of ECC development would be backfilled for the construction of the Services and Utilities buildings on the south western and south eastern side of the main building. Once completed, the hospital will be handed over to the Ministry of Health, as the main operator and regulator of the Health sector in the Maldives. The facility will be constructed and developed to provide care in a number of departments and areas, details of which are provided in Section 5.2.1. 1.2 Key impacts, mitigation measures and alternatives Impacts on the environment from various activities of the project development work (constructional impacts) and operational impacts have been identified through interviews with the project management team, field data collection and surveys and are also based on past experience of consultant in similar projects. Impacts were analysed for their significance with the aid of a Leopold Matrix. In any development project, major direct impacts to the environment occur mainly during the construction phase. Potential direct or indirect impacts on the environment from the proposed project include: Moderate impacts on pond water and groundwater resource due to backfilling works; Minor impact on vegetation due to the need to cut down vegetation located at the plots allocated for construction of infrastructure; Impact due to air and noise pollution during construction work; Impact due to flooding within vicinity Impact due to waste generation, especially during operational phase Risk of accidents on hospital staff and patients Positive impact on social wellbeing and health due to provision of good quality care Mitigation measures are discussed for the activities which would have potential impacts during the construction and operational phase of the project. In general, during the construction stage it is important to use a method of construction which has the least impact on the environment. Specific measures highlighted include: • Preplanning ways so as to expose backfill material sourced from MRDC, Addu City to rainfall, to decrease its salinity • Proper waste management and disposal to mitigate issues due to domestic waste and hospital related biohazardous waste • Establish Standard Operating Procedures for all departments and facilities at the hospital, so as to avoid accidents which pose risks to the staff and patients Detailed mitigation measures are discussed in Section 11 of the report. Alternatives has been considered with respect to project location, as there is disagreement from the Council regarding proposed location. While proposed location is an existing structure and thus project development would have minor impact on environment, it is also considered by the island community as a site of significance and hence do not want to turn the facility into a hospital. The no-project scenario is also considered, which would mean that all environmental impacts due to the project and disagreements regarding use of ECC for the project would no longer be an issue. However, this means that health care for the population of Addu City will be provided as is now, through the Regional Hospital, which does not offer all of the facilities as proposed in the project. Hence, the community would not benefit from many benefits offered through better health care facilities and services offered through the project. The environmental impacts predicted for the project are minor to moderate, given that the project development is mainly at an existing structure. Hence the benefits of developing the hospital and better health care facilities outweigh the cost to the environment and are seen to be far more beneficial than the cancellation of the project. Therefore the “no-project” scenario is not an ideal solution and it is recommended that the project be continued, but with the proper implementation of all mitigation measures proposed in the report. One key recommendation of the consultant is the formulation and implementation of regulations which regulate the healthcare sector, especially those related to development of healthcare facilities (and criteria) and waste disposal from healthcare facilities. This is crucial for the improvement of the sector through both proper service provision and mitigating environmental impacts.