Environment - ތިމާވެށި

Browse

Search Results

Now showing 1 - 10 of 86
  • Thumbnail Image
    Item
    Technical Report
    Addendum 1 for environmental impact assessment of Hulhule-Hulhumale connecting link road development project in North Male‟, Atoll
    (2017-09) Water Solutions
    This report discusses the findings for the first addendum of the environmental impact assessment undertaken by Water Solutions Pvt. Ltd for undertaking the construction of the link road project between Hulhule-Hulhumale.. The project is proposed by Housing Development Corporation (HDC). The island of Hulhumale has been an important growth centre since its development. Presently, Hulhumale is the fastest growing urban centre and has residential as well as industrial developments to a scale that has never been experienced anywhere in the Maldives. Being close to Male‟ and the airport, Hulhumale has been attracting migrants from all over the Maldives. Construction of the Male‟ to Hulhule Bridge is presently the biggest infrastructure project of its kind under construction in Maldives. This project is very much tied with the present link road as this link road will provide direct connection of Hullhumale and the bridge, ultimately making the traffic flow from Hulhumale to Male‟. This road will be constructed on the east side of the existing land mass of Hulhule airport by reclaiming a small area further west of the existing island. The proposed road will consists of three zones. The details of the link road project is given in the Environmental Impact Assessment Report which is prepared by Water Solutions in August 2017 and the reason for the preparation of this first addendum report is due the change in location of sand burrow areas. In the Environmental Impact Assessment Report it was said that the sand will be obtained from the Hulhumale‟ phase 2, phase 1 and Maldives Airports Company Limited (MACL). However now that idea has been dropped out and it is now planned to obtain sand from the eastern side of Uthuru Thila Falhu and the bathymetry shows the depth varies between 40 to 60 meters approximately. The details of the geographic coordinates are given in the section project descriptions and Study Area. This lagoon has been used as a sand burrow area for previous similar projects and is estimated to dredge 410,000 cubic meters of sand from this location. The dredging project is subcontracted to the Dredging International (Cyprus) and it is estimated to complete the project in five to seven days. Environmental impacts were assessed and most of the environmental impacts of the project have been identified as resulting mainly from the coral reef damage caused by reclamation of additional land. Mitigation measures for the negative impacts have been identified and outlined in detail, especially sedimentation control methods. The most important mitigation measure is the use of bund walls in the fill areas. This EIA addendum was undertaken to assess the environmental impacts of the proposed dredging and reclamation to acquire more land for the link road construction project. Based on the assessment, it has been identified that the major impacts of the project will be felt on the marine environment during the dredging and discharging of sand. This EIA addendum report also highlights some of the studies and research work undertaken in similar environments, especially in Male‟، to understand the impacts of reclamation and construction works close to reef slope and how this knowledge can be transferred to similar environments based on the type of coastal protection methods in use. The mitigation measures are provided in the report with alternatives. It is vital to conduct the activities, during both project planning and construction phase, in line with mitigation measures emphasized in the report. Socio-economic impacts of the proposed project will be immense as direct land connection of Male‟ and Hulhumale would bring significant benefits to the general public. Connection of Hulhumale, Male‟ and the airport is a vital transportation link that would save time and money for more than 200,000 people residing in the greater Male‟ region. The environmental impacts of various projects that are currently being undertaken in the airport region have caused significant damage to reef in various areas. This project will also have its impacts, but the impacts will not be anything greater than to what the environment has already been subjected to. Therefore a comprehensive monitoring programme has been suggested which covers components of coastal and marine environment to assess how the critical components of this project will affect the environment and to what extent. It is important to follow this monitoring programme not only to comply with the regulation but also to ensure that the impacts are measures in realistic terms. Though some of the components of this project contravenes with the Dredging and reclamation regulation; the amendments brought to the regulation facilitates that this project could be implemented. Hulhule island is a special zone and Under clause 10 of the dredging and reclamation regulation, special projects are exempted. As the environmental consultants, it is our opinion that this project should be allowed to proceed as the environmental impacts of this project does not pose serious concerns to the natural environment. It is a project that has far greater socio-economic benefits than these limited environmental impacts.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the reconstruction of Guraidhoo harbour, Thaa Atoll, Maldives
    (2016-04) Maldives Energy and Environmental Company
    The Ministry of Housing and Infrastructure requested the services of Maldives Energy and Environmental Company (MEECO) to provide an Environmental Impact Study (EIA) for the re-construction of harbour at Guraidhoo Island, Thaa Atoll. The assessment addresses specific key issues stated in the Terms of Reference (TOR) as agreed between EPA and the Proponent following the Scoping Meeting held on the matter. This EIA report was prepared for the fulfilment of the requirements of the Environmental Impact Assessment Regulations, 2012 with the purpose of conducting an assessment of possible impacts on biophysical and human environment arising from proposed development project. The project is proposed by Ministry of Housing and Infrastructure, Maldives. The proposed harbour reconstruction project include the following components; 1. Reconstruction of improved breakwaters for harbour basin and entrance channel; 2. Reconstruction of improved main quay wall and a side quay wall; 3. Maintenance dredging of the harbour; 4. Extension of the harbour basin; 5. Reclamation of small area of land by dredge sediment disposal; 6. Construction of revetments on a 14m section for the newly reclaimed land; 7. Installation of navigational lights. The present harbour facility at the Guraidhoo Island is greatly damaged and is not serving its intended function of providing safe access to the island and safe mooring of vessels. Additionally, the size of the harbour is identified as inadequate for the present need and expected economic growth of the island. The harbour forms a key part in many livelihood activities of the island and is frequently used by passenger and cargo vessels as well as vessels travelling to and from Laamu atoll. Hence, the improvement of harbour facility will greatly benefit the island community while also enabling future economic development at the island. The proposed project is not expected to cause any long term major irreversible environmental impacts, though few temporary impacts during the construction phase is expected. These impacts can be successfully mitigated by following the measures recommended in this EIA. The construction phase of the project is also expected to present several negative socio-cultural and economic impacts, which can also be mitigated by following measures presented in this EIA. Since the successful operation of the ice plant facility present at the island, after the reconstruction of the harbour is seen as a major economic benefit to island as well as protection of the private property of the business must be ensured when implementing the proposed project, it is highly recommended that the necessary relocation of the ice plant’s pump station and the pipeline is resolved before implementing the proposed project by following the proposed mitigation measures in this report. Overall, the project is expected to yield major positive impacts in socio-cultural and economic sector when the new harbour comes into operation. Based on the results of the assessments, this EIA study concludes that with the proposed mitigation in place, the project is justifiable, would be environmentally acceptable and could proceed in compliance with the relevant environmental legislations and regulations. In this EIA, the consultants have proposed an Environmental management plan to ensure that the construction phase of the project does not cause major unexpected impacts on the environment as well as to ensure that the proposed measures are working effectively to safeguard the environment.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed water supply system in Vilufushi, Thaa Atoll
    (2016-07) CDE Consulting
    The purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to install the proposed Water Production Supply System at Vilufushi, Thaa. Atoll. The proponent of this project is Ministry of Environment and Energy. The main rationale for the project is to improve the health condition and quality of life of residents of Th.Vilufushi by establishing a proper potable water supply system that will provide clean and safe water for the residents of Vilufushi. The project is intended at providing an integrated water supply system covering rainwater and desalinated water production and supply. The proposed project involves installation and establishment of two 6,500 litres/hour reverse osmosis plant systems that consist of construction of tube well to supply raw water for the RO plants, construction of elevated water storage tanks, construction of brine discharge outfall and house connections. Furthermore, the project aims at laying of separate pipe networks for water distribution, rainwater collection and rainwater treatment system. Duration of the project is approximately 18 months. Currently the island population sources water from shallow wells constructed at individual households or in public areas. This is supplemented by collection of rainwater. These methods provide inadequate quantity and unacceptable quality due to the over abstraction and the unreliability of rainwater harvesting. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012, Desalination Systems Regulations, and Waste Management Regulation 2013. The existing condition of the island and the proposed RO plant site was assessed for this report. Assessments conducted include marine assessments at the proposed brine outfall and alternative outfall locations. Groundwater quality and baseline noise level measurements were also taken. The assessments showed that there is no marine protected or environmentally sensitive site in the area and locations proposed for brine outfall showed mostly dead rock and rubble. The assessment shows that the RO systems can be developed on the island with limited implications on the environment. The assessment shows that the proposed developments involve significant impacts on the marine environment due to brine outfall construction, brine discharge, ground excavation and operation of vehicles and machinery. The project also involves moderately significant health and safety risks due to equipment handling and pollution. However, the predicted impacts can be minimized considerably with the proposed mitigation measures. Significant impacts of operation stage include marine degradation due to brine discharge, increased GHG emissions due to RO plant and operation of pumps stations, and increased cost of living due to additional cost in purchasing water. The assessment shows that the proposed project has many positive impacts including improved quality and accessibility to potable water, protection of groundwater aquifer, reduction of water related disaster risk, and increased employment and business opportunities The alternatives evaluated for the project is the alternative brine outfall location. The “No Project” option has also been explored and this option is not deemed preferable, given the current condition of portable water. An alternative site for brine outfall on the southwest corner was also explored against the present option and the alternative option was recommended. Monitoring plan is designed to assess any changes to the coral reef environment of the island, ground and marine water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at USD 5,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Vilufushi Island council, FENAKA, Vilufushi public and Ministry of Housing and Infrastructure. A willingness-to-pay survey was also conducted during field assessments. Both Vilufushi Island Council and public highlighted the need for a potable water supply system on the island. Vilufushi public is also willing to pay for the service. Ministry of Housing and Infrastructure stated they have laid duct lines to facilitate pipeline installations. Since the roads are already sealed with asphalt the public and the Council would like to see the road resealed to the original state of the road. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives but requires final approval from EPA for the detailed drawings. The most significant impacts are expected to be short-term impacts for the construction phase. Operational stage impacts are mainly limited to brine outfall location and emission due to power generation. However, mitigation measures have been proposed to adequately minimise these significant impacts. Overall, the project will have positive impacts to the island community of Vilufushi.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the establishment of a water bottling plant at State Electric Company Limited (STELCO)
    (2016-03) CDE Consulting
    The purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency (EPA) to carry out the proposed ‘Establishment of a Water Bottling Plant Project’ at State Electric Company (STELCO), Male’. The proponent of this project is State Electric Company Limited (STELCO). This project mainly involves establishing a bottling plant on STELCO’s main premise in Male’ city with a production capacity of 6000 bottles per day. A prefabricated building has been assembled on site to house the bottling plant. The project will be using the existing desalination plant at STELCO. All project activities are in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012, Hygiene Regulation for Food Establishments 2014 and Waste Management Regulation 2013. The proposed site for the installation of the bottling plant is located on the main premises allocated to STELCO on the southern end of Male’. Proposed project activities do not require any major alterations to the terrestrial and marine environment. The most significant impact from this project is the increase in plastic waste. The proponent is looking into the prospects of a recycling venture for their bottles to mitigate this impact. This project will generate new jobs in Male’, which is a significant positive impact. The main alternatives assessed for the project are alternative bottling materials and alternative site for establishing the bottling plant. “No project” option has also been considered and given the economic and environmental factors the best option would be to proceed with the project. Stakeholder consultations were conducted with Environmental Protection Agency (EPA) and Maldives Food and Drug Authority (MFDA). EPA’s main concern was to get the desalination plant of STELCO registered at EPA before starting the bottling process. MFDA did not have any major concerns but advised to carryout the necessary water quality assessments. The Environmental Management Plan (EMP) for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition, provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Monitoring plan is designed to assess any changes to the physical environment as well as operational aspects of the resort.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed design and build basis for water supply network, ground storage tanks and reverse osmosis plant, allied works based on integrated water resource approach in R. Meedhoo, Maldives
    (2016-08) CDE Consulting
    The purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to install the proposed Water Production Supply System at Meedhoo, Raa Atoll. The proponent of this project is Ministry of Environment and Energy. The main rationale for the project is to improve the health condition and quality of life of residents of Meedhoo Island by establishing a proper potable water supply system that will provide clean and safe water for the residents of Meedhoo. The project is intended at providing an integrated water supply system covering rainwater and desalinated water production and supply. The proposed project involves installation and establishment of two 40 m3 reverse osmosis plant systems that consists construction of a borehole to supply raw water for the RO plants, construction of elevated water storage tanks, construction of brine discharge outfall and house connections. An area of 9,557 sq ft has been approved and given to the proponent for this project. The project will also install the required water storage tanks including 500 m3 storage tank for desalinated water and 1,000 m3 storage tank for rainwater. The project aims at laying of separate pipe networks for water distribution, rainwater collection and rainwater treatment system. Duration of the project is approximately 11 months. Currently the island population sources water from shallow wells constructed at individual households or in public areas. This is supplemented by collection of rainwater. These methods provide inadequate quantity and unacceptable quality due to the over abstraction and the unreliability of rainwater harvesting. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012, Desalination Systems Regulations, and Waste Management Regulation 2013. The existing condition of the island and the proposed RO plant site was assessed for this report. Assessments conducted include marine assessments at the proposed brine outfall and alternative outfall locations. Groundwater quality and baseline noise level measurements were also taken. The assessments showed that there is a marine protected area within 11 km from the island. Marine assessments indicated that the proposed outfall location is mainly composed of dead coral. The assessment shows that the RO systems can be developed on the island with limited implications on the environment. The assessment shows that the proposed developments involve significant impacts on the marine environment due to brine outfall construction, brine discharge, ground excavation and operation of vehicles and machinery. The project also involves moderately significant health and safety risks due to equipment handling and pollution. However, the predicted impacts can be minimized considerably with the proposed mitigation measures. Significant impacts of operation stage include marine degradation due to brine discharge, increased GHG emissions due to RO plant and operation of pumps stations, and increased cost of living due to additional cost in purchasing water. The assessment shows that the proposed project has many positive impacts including improved quality and accessibility to potable water, protection of groundwater aquifer, reduction of water related disaster risk, and increased employment and business opportunities The alternatives evaluated for the project is the alternative brine outfall location. The “No Project” option has also been explored and this option is not deemed preferable, given the current condition of portable water. An alternative site for brine outfall was also explored, but given the advantages associated with the proposed outfall, it is the preferred option. Monitoring plan is designed to assess any changes to the coral reef environment of the island, ground and marine water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at Rf 75,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Meedhoo Island council, FENAKA, Meedhoo public, Health Protection Agency and Environmental Protection Agency. A willingness-to-pay survey was also conducted during field assessments. Both Meedhoo Island Council and public highlighted the need for a potable water supply system on the island and are in favour for the project. Majority of the people consulted wish to pay as per usage. HPA, currently does not have any regulations for quality of potable water, however they stressed the importance of disinfecting and treating water prior to releasing to the supply network. EPA advised on ways to implement the project and its components. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives but requires final approval from EPA for the detailed drawings. The most significant impacts are expected to be short-term impacts for the construction phase. However, mitigation measures have been proposed to adequately minimise these significant impacts. Overall, the project will have positive impacts to the island community of Meedhoo
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed water supply system in L. Fonadhoo
    (2016-06) CDE Consulting
    The purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to establish the proposed Water Supply System at Fonadhoo, Laamu Atoll. The proponent of this project is Ministry of Environment and Energy (MEE). Project contractor is Sierra Construction Private Limited. The main rationale for the project is to enhance the quality of services and quality of life of residents of L. Fonadhoo by establishing a proper potable water supply system that will provide clean and safe water for the residents of L.Fonadhoo. The project is intended at providing an integrated water supply system covering rainwater and desalinated water production and supply. The project is expected to be completed in 12 months. The proposed project involves installation and establishment of two 150cbm/day reverse osmosis plant systems, construction of two boreholes to supply water for the RO plants, construction of RO plant building, construction of water storage tanks, construction of brine discharge outfall, preparation of catchment areas, establishment of water treatment systems, laying of pipe networks for water distribution and rainwater collection, and household connections. Currently the island population sources water from shallow wells constructed in individual households or in public areas (e.g. a mosque). This is supplemented by collection of rainwater. These methods provide inadequate quantity and unacceptable quality due to the over abstraction, pollution from the existing sewage disposal system of septic tanks and the unreliability of rainwater harvesting. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012, Desalination Systems Regulations, and Waste Management Regulation 2013. The proposed location for RO plant is a reclaimed area with ground cover species such as grasses and few shrubs. No trees of significant importance are required to be removed for this project. Marine surveys conducted at the proposed brine outfall location showed that the area is made up of a thick sea grass bed. No coral colonies were observed within this area. Current flow on the western lagoon, where brine outfall is proposed to be located, is expected to be low for most part of the year. This may lead to flushing issues during some periods of the year. The assessment shows that the RO systems can be developed on the island with limited implications on the environment. The assessment shows that the proposed developments involve significant impacts on the marine environment and terrestrial environment due to brine outfall construction, brine discharge, ground excavation and operation of vehicles and machinery. The project also involves moderately significant health and safety risks due to equipment handling and pollution. However, the predicted impacts can be minimized considerably with the proposed mitigation measures. Significant impacts of operation stage include marine degradation due to brine discharge, increased GHG emissions due to RO plant and operation of pumps stations, and increased cost of living due to additional cost in purchasing water. The assessment shows that the proposed project has many positive impacts including improved quality and accessibility to potable water, protection of groundwater aquifer, reduction of water related disaster risk, and increased employment and business opportunities The alternatives evaluated for the project are „No Project‟ alternative and alternative brine outfall locations. The “No Project” option is not deemed preferable, given the disadvantages of existing situation of potable water in the island. Two alternative sites were explored as brine outfall locations, both in the same location as the proposed outfall location but with different lengths; (i) outfall pipe 700m from the site and (ii) 350m from the site. Alternative option 2 is preferred. Monitoring plan is designed to assess any changes to the coral reef environment of the island, terrestrial environment, the ground and marine water quality, as these are the key areas that will be impacted from this project. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations for this EIA were conducted with Fonadhoo Island Council, Fonadhoo Utility and Telecommunications providers, public of Fonadhoo, and National Centre for Information Technology (NCIT). In general, all stakeholders consulted were supportive of the proposed project. The island council and public expressed strong expectations from the project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. The most significant impacts are expected to be short-term impacts for the construction phase. Operational stage impacts are mainly limited to brine out fall location and emission due to power generation. However, mitigation measures have been proposed to adequately minimise these significant impacts.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed water supply system in Guraidhoo, Kaafu Atoll
    (2016-07) CDE Consulting
    The purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to install the proposed Water Production Supply System at Guraidhoo, Kaafu. Atoll. The proponent of this project is State Electric Company Limited. The main rationale for the project is to improve the health condition and quality of life of residents of K.Guraidhoo by establishing a proper potable water supply system that will provide clean and safe water for the residents of Guraidhoo. The project is intended at providing an integrated water supply system covering rainwater and desalinated water production and supply. The proposed project involves the establishment of an integrated water resource management system using the existing RO plant and rainwater harvesting system. The project will integrate the existing 2 RO plants of capacity 30 m3 per day to the water supply network. The project also involves establishment water supply network system and water storage tanks. Consequently, a 502 m3 RO tank will be established and rainwater holding tank of 1,007 m3 will be established. The project will utilise the existing borehole and brine outfall line for the project. Duration of the project is approximately 12 months. An area of 11,128.22 sq ft has been approved to implement the project. Currently the island population sources water from shallow wells constructed at individual households or in public areas. This is supplemented by collection of rainwater. These methods provide inadequate quantity and unacceptable quality due to the over abstraction and the unreliability of rainwater harvesting. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012, Desalination Systems Regulations, and Waste Management Regulation 2013. The existing condition of the island and the existing RO plant site was assessed for this report. Assessments conducted include marine assessments at the existing brine outfall and alternative outfall location. Groundwater quality and baseline noise level measurements were also taken. The assessment shows that the water supply system can be developed on the island with limited implications on the environment. The assessment shows that the proposed developments involve significant impacts on the marine environment due to brine outfall construction, brine discharge and operation of vehicles and machinery. The project also involves moderately significant EIA for the proposed Water Supply System in Guraidhoo, Kaafu Atoll Prepared by: CDE Consulting Page|xiii health and safety risks due to equipment handling and pollution. However, the predicted impacts can be minimized considerably with the proposed mitigation measures. Significant impacts of operation stage include marine degradation due to brine discharge, increased GHG emissions due to RO plant and operation of pumps stations, and increased cost of living due to additional cost in purchasing water. The assessment shows that the proposed project has many positive impacts including improved quality and accessibility to potable water, protection of groundwater aquifer, reduction of water related disaster risk, and increased employment and business opportunities The alternatives option were evaluated for the no project option and alternative brine outfall location. The “No Project” option is deemed infeasible, given the current condition of portable water. An alternative site for brine outfall was also explored, but given the advantages associated with the existing outfall, it is the preferred option. Recommendations have been made to use an alternative if plant size is expanded substantially. Monitoring plan is designed to assess any changes to the coral reef environment of the island, ground and marine water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at USD 5,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Guraidhoo Island council, Guraidhoo public and Health Protection Agency. A willingness-to-pay survey was also conducted during field assessments. Both Guraidhoo Island Council and public are in favour of this project. Guraidhoo public is also willing to pay for the service. HPA, currently does not have any regulations for quality of potable water, however they stressed the importance of disinfecting and treating water prior to releasing to the supply network. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives but requires final approval from EPA for the detailed drawings. The most significant impacts are expected to be short-term impacts for the construction phase. Operational stage impacts are mainly limited to brine outfall location and emission due to power generation. However, mitigation measures have been proposed to adequately minimise these significant impacts. Overall, the project will have positive impacts to the island community of Guraidhoo.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed water supply system in HA. Dhihdhoo
    (2016-07) CDE Consulting
    The purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to establish the proposed Water Supply System at Dhidhdhoo, Haa Alifu Atoll. The proponent of this project is Ministry of Environment and Energy (MEE). Project contractor is Sierra Construction Private Limited. The main rationale for the project is to enhance the quality of services and quality of life of residents of Ha.Dhidhdhoo by establishing a proper potable water supply system that will provide clean and safe water for the residents of Ha.Dhidhdhoo. The project is intended at providing an integrated water supply system covering rainwater and desalinated water production and supply. The project is expected to be completed in 12 months. The proposed project involves installation and establishment of two 220 cbm/day reverse osmosis plant systems, construction of two boreholes to supply water for the RO plants, construction of RO plant building, construction of water storage tanks, construction of brine discharge outfall, preparation of catchment areas, establishment of water treatment systems, laying of pipe networks for water distribution and rainwater collection, and household connections. Currently the main sources of water in the island are shallow wells constructed in individual households or in public areas (e.g. a mosque). This is supplemented by collection of rainwater. These methods provide inadequate quantity and unacceptable quality due to the over abstraction, pollution from past sewage disposal system of septic tanks and the unreliability of rainwater harvesting. A reverse osmosis desalination plant of capacity 10 ton is in operation, but the production capacity of this plant is not sufficient to meet the public water demand. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012, Desalination Systems Regulations, and Waste Management Regulation 2013. The proposed site is located on the northern side of the island just within the old vegetation line. The site is comprised of beach vegetation mainly and has not been used in the past for any purpose. No trees of significant importance are required to be removed for this project. Marine surveys conducted at the proposed brine outfall location showed that the area is made up of mainly dead corals with sparsely distributed juvenile coral patches. No major live coral colonies were observed within this area. Current flow on the northeast corner, where brine outfall is proposed to be located, is expected to be high for most part of the year. The assessment shows that the RO systems can be developed on the island with limited implications on the environment. The assessment shows that the proposed developments involve significant impacts on the marine environment and terrestrial environment due to brine outfall construction, brine discharge, ground excavation and operation of vehicles and machinery. The project also involves moderately significant health and safety risks due to equipment handling and pollution. However, the predicted impacts can be minimized considerably with the proposed mitigation measures. Significant impacts of operation stage include marine degradation due to brine discharge ,increased GHG emissions due to RO plant and operation of pumps stations, and increased cost of living due to additional cost in purchasing water. The assessment shows that the proposed project has many positive impacts including improved quality and accessibility to potable water, protection of groundwater aquifer, reduction of water related disaster risk, and increased employment and business opportunities The alternatives evaluated for the project are „No Project‟ alternative and alternative brine outfall locations. The “No Project” option is not deemed preferable, given the disadvantages of existing situation of potable water in the island. An alternative site was explored as brine outfall locations, by reducing the length of the outfall. Due to better flushing, the proposed longer option was preferred. Monitoring plan is designed to assess any changes to the coral reef environment of the island, terrestrial environment, the ground and marine water quality, as these are the key areas that will be impacted from this project. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations for this EIA were conducted with Didhdhoo Island Council, Dhidhdhoo FENAKA Office, public of Dhidhdhoo, and Health Protection Agency (HPA). In general, all stakeholders consulted were supportive of the proposed project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. The most significant impacts are expected to be short-term impacts for the construction phase. Operational stage impacts are mainly limited to brine out fall location and emission due to power generation. However, mitigation measures have been proposed to adequately minimise these significant impacts.
  • Thumbnail Image
    Item
    Technical Report
    First addendum to the environmental impact assessment for the proposed reclamation of Thinadhoo, Gaaf Dhaal Atoll, Maldives : change of borrow area
    (2016-05) Musthafa, Amir
    This report is the Addendum to the EIA undertaken for the Proposed Reclamation of GDh. Thinadhoo, Maldives. This addendum is based on the change of borrow area after the sand search campaign has been undertaken. More details on the sand placing method is also provided in this addendum. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under the „Jadhuvalu R‟ of the Environmental Impact Assessment Regulations 2012 of the Maldives. This report would further conform to the Dredging and Reclamation regulation. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions in an environmentally sound manner. The new dredging location is about 8 km west of the proposed borrow area 1 and area 3 given in the original EIA. The overall environmental impacts of the project have been assessed using frameworks found on literature and the results indicate that the proposed project has minimum negative impact and have an overall net positive outcome. The main environmental positive impacts due to this change comes from the fact that it is slightly far from the resort islands and sensitive areas, and therefore direct impact guests will be minimised. However, the change results in the borrow area being located relatively closer to the inhabited islands area, which also hosts a dive spot and a sensitive area. However, the dredging location is still over 1 km away from the inhabited area, while it is about 7km away from the nearest sensitive area. Dredging activities will no doubt increase sedimentation impacts in the area, although lasting impacts are not envisaged. There are no additional impacts due to reclamation as there is no change in scope with regards to this component. Furthermore, it is important to note that the approved dredge locations in the initial EIA were closer to the “Havodigalaa” sensitive area. Important new stakeholders for the project include Atoll council, nearby resorts, and Management at the Airports company, who may use the surrounding region of the borrow area. The stakeholders consulted did not have any significant reservations. However, they did note that the shallow reef North of the borrow area was used for bait fishing, and fishermen from Madaveli use the general area and channel for fishing. The management at the airports company inquired whether the height of the dredger would cause any issues to incoming aircrafts. Both these concerns were attended to and subsequently, the stakeholders did not have any further issues. The height of the ship will not cause any issue since the channel was south of Kaadedhoo was not going to be used, and all stakeholders will be preinformed before dredging commences. Alternative borrow area options are not viable as the sand search campaign concluded that there are no other significant sand depots within a reasonable distance from Thinadhoo. Alternative areas are those that have already been excluded. The only other viable alternative is to source sand from another region. Importing sand from abroad will be very costly and will have further negative impacts at the reclaim site. It is recommended to continue to monitor the impacts of the proposed project by regular monitoring of marine water quality. The monitoring plan proposed in the original EIA is slightly updated to include more monitoring locations, near borrow area. A two stage monitoring plan is given, which recommends quarterly monitoring during the 1st year and less frequent monitoring for the next 5 years. Undertaking the monitoring, along with the mitigation measures is necessary to ensure the sustainable development of the project with minimum harm to the environment. It is thus recommended that since the project has major socio-economic benefits and environmental benefits, it is advisable to allow the project to proceed as proposed. Moreover, since the change in scope is relatively small, and since the initial EIA has been approved, and also considering the fact that the sand search campaign resulted in only one location within reasonable distance from Thinadhoo to obtain sand, there is no viable reason to postpone or cancel the project due to this change.
  • Thumbnail Image
    Item
    Technical Report
    First addendum to the environmental impact assessment for the proposed reclamation of Feydhoo, Addu City, Maldives : change of borrow area
    (2016-05) Musthafa, Amir
    This report is the Addendum to the EIA undertaken for the Proposed Reclamation of Feydhoo, Addu City, Maldives. This addendum is based on the change of borrow area after the sand search campaign has been undertaken. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under the ‘Jadhuvalu R’ of the Environmental Impact Assessment Regulations 2012 of the Maldives. This report would further conform to the Dredging and Reclamation regulation. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions in an environmentally sound manner. The new dredging location is about 1.5km North of the proposed borrow area 1 given in the original EIA. The overall environmental impacts of the project have been assessed using frameworks found on literature and the results indicate that the proposed project has minimum negative impact and have an overall net positive outcome. The main environmental positive impacts due to this change comes from the fact that it is slightly far from the inhabited area, and therefore direct impact on inhabitants will be minimised. However, the change results in the borrow area being located relatively closer to the manta point, kuda kandu, and maa kandu, which a popular dive spot and sensitive areas respectively. However, the dredging location is still over 3-4km away from the sites. The area is slightly closer to the british loyalty wreck is also 3km away from the dredge area. Dredging activities will no doubt increase sedimentation impacts in the area, although lasting impacts are not envisaged. There are no additional impacts due to reclamation as there is no change in scope with regards to this component. Furthermore, it is important to note that the approved dredge locations in the initial EIA had similar distances away from other sensitive areas in the South. Important new stakeholders for the project include dive centres and fishermen who may use the surrounding region of the borrow area. While some dive centers had significant reservations and had been reported to be outright against the project taking place in the area, their reasons are not backed by sound science and there is simply a lack of information to conclude the dredging in this area will result in any lasting impact to the popular dive spots. Alternative borrow area options are not viable as the sand search campaign concluded that there are no other significant sand depots within Addu Atoll. Alternative areas are those that have already been excluded. The only other viable alternative is to source sand from another region. Importing sand from abroad will be very costly and will have further negative impacts at the reclaim site. It is recommended to continue to monitor the impacts of the proposed project by regular monitoring of marine water quality. The monitoring plan proposed in the original EIA is slightly updated to include more monitoring locations, near borrow area. A two stage monitoring plan is given, which recommends quarterly monitoring during the 1st year and less frequent monitoring for the next 5 years. Undertaking the monitoring, along with the mitigation measures is necessary to ensure the sustainable development of the project with minimum harm to the environment. It is thus recommended that since the project has major socio-economic benefits and environmental benefits, it is advisable to allow the project to proceed as proposed. Moreover, since the change in scope is relatively small, and since the initial EIA has been approved, and also considering the fact that the sand search campaign resulted in only one location within Addu Atoll to obtain sand, there is no viable reason to postpone or cancel the project due to this change.