  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment : for the development of a 14 Storey Building at H. Filigasdhoshuge, Malé, Maldives
    (2010-06) Jameel, Ahmed
    Mr. Ali Shareef is proposing to build a 14 storey hotel at H. Filigasdhoshuge. This Environmental Impact Assessment (EIA) report has been prepared in order to meet the requirements of Clause 5 of the Environmental Protection and Preservation Act of the Maldives to assess the impacts of proposed development at H. Filigasdhoshuge, Male’. The report has looked at the justifications for undertaking the proposed project components. Alternatives to proposed components or activities in terms of location, design and environmental considerations were suggested. A mitigation plan and monitoring programme before, during and after the works has also been proposed. The project component that has the greatest potential for environmental impact is the foundation component. The foundation type has been considered taking into consideration the noise and vibration impact from the deep pile foundation construction of project which was undertaken in the vicinity to the proposed site at Holiday Inn. The proposed project has proposed a raft foundation where piling technology has been chosen as a mechanism for shoring for the foundation construction process. A geotechnical investigation of the proposed project site was undertaken by the ELS – Amin International Pvt Ltd of Maldives in September 2008. The geotechnical investigation included the borehole investigation and Standard Penetration Tests. The geotechnical investigation revealed that the estimated settlement under the foundation would be less than 50mm which is acceptable for the type of foundation chosen for the building. Since the settlement under the foundation is small and a setback of 1 m has been provided between the plot boundary and the foundation, the ground settlement beyond the limits of the boundary would be too small to induce any significant damage to the neighbouring structures. A survey of the existing structural damage was carried out for all buildings that were located within a radius of 20m from the proposed building. The proposed project is expected to increase the housing units and commercial floor area available in Malé. It is inevitable that there would be some negative environmental impacts, especially when excavation is undertaken. Nevertheless, these negative impacts are not so severe to the extent that the project should not be allowed to take place. As a result, a comprehensive monitoring component has been suggested which takes in to consideration the most important elements that require regular checks. This monitoring component will be adhered and will allow the assessment of long term changes, despite the limited nature of the impact. The most important consideration is the socioeconomic impacts that have been assessed mainly as positive in nature. Not only are they positive, but most importantly would they remain positive for a long term. Therefore, it appears justified from a technical and from an environmental point of view, to carry out the proposed project in light of the existing socio‐economic developments.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment proposed 13 storey building construction at M. Dhimyaath, Male’
    (2017-09) Jameel, Ahmed; Mohamed, Hamdhoon
    This report is based on the proposed 13 storey building construction at the residence, M. Dhimyaath in the capital city, Male’. The project is being developed and constructed by Dr. Mohamed Muizzu. He will be undertaking the construction works and project management including overseeing the EIA process. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under ‘Jadhuvalu R’ of the Environmental Impact Assessment Regulations 2012 of the Maldives. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions based on favorable environmental conditions with the main focus on sustainability. The project also adheres to several other rules and regulations in the Maldives and has obtained permit from the Ministry of Housing and Infrastructure to proceed. The area the project is proposed to be undertaken is a moderately built area in the heart of Male’, more towards the south western side. There is no natural terrestrial environment at site. The existing environment therefore was focused on the regional climate of Male’, and the traffic distribution, and noise pollution in the area. As could be seen from the data, this area does not encourage much traffic relative to the busier roads in Male’. There were several existing construction sites in the neighborhood. A general exterior overview of the existing structures in the area was also observed. It was found that most of the buildings in the area were in good condition. Older buildings were mostly single storey structures. Therefore, serious structural defects are expected to be at a minimum. However, the report recommends to undertake a structural defects inspection study of the buildings in the same block as the proposed site by civil engineering experts. The overall environmental impacts of the project have been assessed using frameworks found in literature. Since the development is undertaken in a moderately built area, the results indicate that the proposed project has neutral impact. However, there are some significant impacts on the environment during the construction phase of the project and these needs to be mitigated to avoid any significant damage to the environment. Significance of the impacts and mitigation measures have been provided based on previous similar projects undertaken in the Maldivian environment and based on literature. The main cause for concern regarding this project is the impact it will have on neighbours residing in this area. As such, several short-term impacts are envisaged including air pollution, noise pollution, aesthetic impacts, and safety concerns. As there are numerous high storey building projects being undertaken in Male’, there is no particular long term impact associated with this project. One significant impact specific to this project is the cumulative impact on the neighbourhood due to the sheer no. of construction projects that are simultaneously undertaken in the area. The impacts that do occur however can be easily mitigated to minimise and/or completely nullify them. The first mitigation measure proposed includes creating awareness among the construction staff and neighbours regarding the scope of the project. Other measures include properly demarcating the area, putting up dust screens, and taking other protective measures to ensure people residing and utilising the vicinity will not have to endure the impacts during the construction stage. Foundation protection measures are recommended and are provided as part of the project to prevent impact on neighbouring structures. Dewatering procedure also needs to be undertaken with care, details of which are given in the report. During the operation stage of the project, parking and waste management are issues of note. Alternatives, including the no project option and alternatives for some project components are also discussed. Regarding project design, a few alternatives are recommended such as providing a green area at the terrace, while the pros and cons of making a larger parking area is also discussed. An environmental monitoring program is provided at the end of the report, which provides details on the parameters to monitor on site, and the frequency in which it needs to be done. Estimated costs for the monitoring works are given. Implementation of the program is essential for the sustainable development of the project. In conclusion, it is discussed the impact such major housing projects have for the increasing population density in Male’, and how it can be prevented at a policy level. However, taking this project as a standalone development project in an already heavily built island city, it can be concluded that no significant long-term impacts are predicted. Therefore, it is recommended that the project go ahead as proposed with precautions and mitigation measures in place.
  • Thumbnail Image
    Item
    Technical Report
    Addendum to environmental impact assessment soft coastal measure at western shoreline of Thinadhoo, Gdh Atoll
    (2014-10) Jameel, Ahmed; Faiz, Ibrahim
    This report discusses the findings of an environmental study undertaken as an Addendum to the Environmental Impact Assessment carried out for the project to undertake soft coastal measure at western shoreline of Thinadhoo, GDh Atoll. This environmental study has been undertaken by Water Solutions Pvt. Ltd. for the changes that had been brought to the scope of the soft coastal protection project at GDh. Thinadhoo. This Addendum to the EIA shall only be used for the purpose of issuing the Environmental Permit under the EIA Regulation 2012 and Environment Law 4/93. The demonstration coastal protection project is proposed by Ministry of Environment and Energy and Maldives Transport and Contracting Company (MTCC) is the contractor for the project. Demonstration of soft coastal measure at western shoreline of GDh. Thinadhoo, is being implemented through Integrating Climate Change Risks into Resilient Island Planning (ICCRRIP) in the Maldives project. This is the first climate adaptation project implemented in the Maldives. The demonstration coastal protection project at western shoreline of GDh. Thinadhoo using soft coastal measure involves nourishment of 1,065m reclaimed shoreline on western side of the island and protection of the shoreline through the construction of an artificial ridge and geo-bag revetment. The project also involves the creation of a vegetated drainage system adjacent to the elevated ridge, which will allow drainage of flood water due to waves and rain. The details of the project has been provided in the Environmental Impact Assessment carried out for the project to undertake soft coastal measure at western shoreline of Thinadhoo, GDh Atoll (2014) which had been approved by EPA. The Ministry of Environment and Energy is proposing to change the location of the borrow area of to excavate 30,000 m3 of sand required for filling of the geo bags and back filling of the area to create a vegetated ridge. The contractor was unable to excavate sand from the approved two borrow areas located on north and southern side of the island. This EIA Addendum report has identified that the major impacts of the borrowing sand from the new borrow site will be felt on the marine environment of the island. Impacts on the marine environment will be felt through sedimentation and siltation caused by excavation activity in the lagoon and the associated indirect impacts on the coral reef, during this period. Baseline data has been collected and report in the EIA report. Impact on the marine environment associated with the borrowing sand from new borrow site will be identified through the monitoring. This will be reported in follow up environmental monitoring reports. The most significant impact will be felt on the lagoon bottom and adjacent coral reef on eastern side of the island. Alternatives to the project have also been considered. An alternative would be to use a mini dredger to dredge the required amount of sand from the approved borrow site located on northern side of the island. But this option would not be practical as it would be possible to mobilise a mini dredger to dredge 30,000 m3 of sand. Dredgers are feasible if the volume of sand is above 150,000 m3. Towards, the end of the report, a monitoring programme has been suggested which mainly covers the marine environment. These include coral cover and marine water quality among many other parameters.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed 11-storey building construction at Ma. Andhalus, Male’
    (2016-02) Jameel, Ahmed; Musthafa, Amir
    This report is based on the proposed 11 storey building construction at the residence, Ma. Andhalus in the capital city, Male‟. The project is being developed and constructed by FEDO Pvt. Ltd. They are to undertake the construction works and project management including overseeing the EIA process. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under „Jadhuvalu R‟ of the Environmental Impact Assessment Regulations 2012 of the Maldives. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions based on favourable environmental conditions with the main focus on sustainability. The project also adheres to several other rules and regulations in the Maldives and has obtained permit from the Ministry of Housing and Infrastructure to proceed. The area the project is proposed to be undertaken is a moderately built area in the heart of Male‟, more towards the southern side. There is no natural terrestrial environment at site, The existing environment therefore was focussed on the regional climate of Male‟, and the traffic distribution, and noise pollution in the area. As could be seen from the data, this area does not encourage much traffic relative to the busier roads in Male‟. There were several existing construction sites in the neighbourhood. A general exterior overview of the existing structures in the area was also observed. It was found that most of the buildings in the area were in good condition. Older buildings were mostly single storey structures. Therefore, serious structural defects are expected to be at a minimum. However, the report recommends to undertake a structural defects inspection study of the buildings in the same block as the proposed site by civil engineering experts. The overall environmental impacts of the project have been assessed using frameworks found in literature. Since the development is undertaken in a moderately built area, the results indicate that the proposed project has neutral impact. However, there are some significant impacts on the environment during the construction phase of the project and these needs to be mitigated to avoid any significant damage to the environment. Significance of the impacts and mitigation measures have been provided based on previous similar projects undertaken in the Maldivian environment and based on literature. The main cause for concern regarding this project is the impact it will have on neighbours residing in this area. As such, several short-term impacts are envisaged including air pollution, noise pollution, aesthetic impacts, and safety concerns. As there are numerous high storey building projects being undertaken in Male‟, there is no particular long term impact associated with this project. One significant impact specific to this project is the cumulative impact on the neighbourhood due to the sheer no. of construction projects that are simultaneously undertaken in the area. The impacts that do occur however can be easily mitigated to minimise and/or completely nullify them. The first mitigation measure proposed includes creating awareness among the construction staff and neighbours regarding the scope of the project. Other measures include properly demarcating the area, putting up dust screens, and taking other protective measures to ensure people residing and utilising the vicinity will not have to endure the impacts during the construction stage. Foundation protection measures are recommended and are provided as part of the project to prevent impact on neighbouring structures. Dewatering procedure also needs to be undertaken with care, details of which are given in the report. During the operation stage of the project, parking and waste management are issues of note. Alternatives, including the no project option and alternatives for some project components are also discussed. Regarding project design, a few alternatives are recommended such as providing a green area at the terrace, while the pros and cons of making a larger parking area is also discussed. An environmental monitoring program is provided at the end of the report, which provides details on the parameters to monitor on site, and the frequency in which it needs to be done. Estimated costs for the monitoring works are given. Implementation of the program is essential for the sustainable development of the project. In conclusion, it is discussed the impact such major housing projects have for the increasing population density in Male‟, and how it can be prevented at a policy level. However, taking this project as a standalone development project in an already heavily built island city, it can be concluded that no significant long-term impacts are predicted. Therefore, it is recommended that the project go ahead as proposed with precautions and mitigation measures in place.