Academic Articles -- ޢިލްމީ ލިޔުންތަކުގެ ޖަމާ
Browse
2 results
Search Results
Technical ReportItem Environmental monitoring for Adaraan Meedhupparu, R. Meedhupparu(2014-03) Systems Engineering and Marine ConsultingThis environmental monitoring reviews the condition of the environment of Meedhupparu after the implementation of the Coastal Works in year 2012. The natural environment is described, assessed and compared to data from previous years. The bathymetry of the west coast was analysed and comparison drawn between the baseline and post work situation. The data accumulated since 2012 on the substrates around Meedhupparu were gathered and compared. Among all the sites rock has always been the primary substrate, (from 66.40 to 77.20%) followed by rubble (from 9.60 to 18.80%) and sand (from 1.20 to 11.60%). Coral was the fourth substrate varying between 4 and 11.60%. The evolution of the coral cover during 2012 to 2014 was assessed in selected zones. Since 2012, the general trend for sites on the west coast was of no change showing almost the same averaged coral cover. Technical ReportItem Addendum IV to development of a 190 rooms tourist resort on Lh. Kanifushi(2011-06) Systems Engineering and Marine ConsultingLh.Kanifushi was awarded to be developed as a tourist resort to Mohamed Nasheed. Initially to be developed by One and Half Degree Pvt. Ltd., and an EIA was submitted and approved. In a later development, Kanifushi Investment Pvt. Ltd took over and proposed a number of changes to be brought about in the site plans and submitted a new addendum, addendum III was submitted to get approval to start with the construction. Seamarc was the consultant for the initial EIA as well as the three addenda which were submitted afterwards. A number of issues presented in the different reports are still relevant at present and the bulk of the information is available in the main EIA report. The initial authorization was granted through decision note (88-ES / MIS / 2007/ 41) and the latest changes through decision note (88- DS / NI - KAN / 2010/ 30) which was partly carried out. The present addendum is necessary as Kanifushi Investment Pvt. Ltd. has obtained from the Ministry of Tourism the authorization to build 50 extra rooms in total provided the built up area remains within the regulations. The major differences brought about are listed below: • Change in the water jetty design and building of an additional 30 bungalows. • Additional 20 bungalows on the northern coastline of the island. The present addendum first presents the changes brought about in the design, followed by a discussion on the environmental consequences of these changes. Appropriate mitigation measures are presented together with alternative options. A summary table giving the pros and cons of the changes is given before concluding on the environmental appropriateness of the changes.