Academic Articles -- ޢިލްމީ ލިޔުންތަކުގެ ޖަމާ

Browse

Search Results

Now showing 1 - 3 of 3
  • Thumbnail Image
    Item
    Technical Report
    Environmental monitoring for Adaraan Meedhupparu, R. Meedhupparu
    (2014-03) Systems Engineering and Marine Consulting
    This environmental monitoring reviews the condition of the environment of Meedhupparu after the implementation of the Coastal Works in year 2012. The natural environment is described, assessed and compared to data from previous years. The bathymetry of the west coast was analysed and comparison drawn between the baseline and post work situation. The data accumulated since 2012 on the substrates around Meedhupparu were gathered and compared. Among all the sites rock has always been the primary substrate, (from 66.40 to 77.20%) followed by rubble (from 9.60 to 18.80%) and sand (from 1.20 to 11.60%). Coral was the fourth substrate varying between 4 and 11.60%. The evolution of the coral cover during 2012 to 2014 was assessed in selected zones. Since 2012, the general trend for sites on the west coast was of no change showing almost the same averaged coral cover.
  • Thumbnail Image
    Item
    Technical Report
    Addendum IV to development of a 190 rooms tourist resort on Lh. Kanifushi
    (2011-06) Systems Engineering and Marine Consulting
    Lh.Kanifushi was awarded to be developed as a tourist resort to Mohamed Nasheed. Initially to be developed by One and Half Degree Pvt. Ltd., and an EIA was submitted and approved. In a later development, Kanifushi Investment Pvt. Ltd took over and proposed a number of changes to be brought about in the site plans and submitted a new addendum, addendum III was submitted to get approval to start with the construction. Seamarc was the consultant for the initial EIA as well as the three addenda which were submitted afterwards. A number of issues presented in the different reports are still relevant at present and the bulk of the information is available in the main EIA report. The initial authorization was granted through decision note (88-ES / MIS / 2007/ 41) and the latest changes through decision note (88- DS / NI - KAN / 2010/ 30) which was partly carried out. The present addendum is necessary as Kanifushi Investment Pvt. Ltd. has obtained from the Ministry of Tourism the authorization to build 50 extra rooms in total provided the built up area remains within the regulations. The major differences brought about are listed below: • Change in the water jetty design and building of an additional 30 bungalows. • Additional 20 bungalows on the northern coastline of the island. The present addendum first presents the changes brought about in the design, followed by a discussion on the environmental consequences of these changes. Appropriate mitigation measures are presented together with alternative options. A summary table giving the pros and cons of the changes is given before concluding on the environmental appropriateness of the changes.
  • Thumbnail Image
    Item
    Technical Report
    Addendum V to environmental impact assessment for the development of a 200 bed tourist hotel on G. Dh. Magudhdhuvaa
    (2011-10) Systems Engineering and Marine Consulting
    An Environment Impact Assessment on the construction of a tourist resort on Magudhdhuvaa was submitted in 2008. After a review meeting with the Ministry of Transport and Environment, a first addendum to the EIA was submitted outlining the necessary clarifications. The EIA was approved, authorizing the proposed development. Several alterations were made to the layout after the initial designs were submitted and approved, and a second addendum was required to validate these alterations. The development of the resort commenced following the approval of the second addendum. However several alterations were made after the second addendum and a third was submitted and approved. A fourth addendum, regarding new developments, has been recently submitted for review by the Environmental Protection Agency. Now, Ahmet Aydeniz Maldives Pvt. Ltd. wishes to develop a protection wall in the harbour in addition to the developments authorized as per the decision notes (88‐ES/NI‐MAG/2008/3, 88‐DS/NI‐MAG/2010/10 and 88‐ES/NI‐MAG/2011/03) issued following the evaluation of the EIA and the previous addendums. The present addendum V first presents the changes brought by this structure about in the design, followed by a discussion on the environmental consequences of these changes. A summary table giving the pros and cons of the changes is finally given before concluding on the environmental appropriateness of the changes.