Academic Articles -- ޢިލްމީ ލިޔުންތަކުގެ ޖަމާ
Browse
125 results
Search Results
Technical ReportItem Environmental Impact assessment : for the proposed development of heavy load site in Thilafushi(2010-09) Zahid, AhmedThis report addresses the environmental concerns of the proposed reclamation of an area of about 25,300m2 (2.53hectares) to a height of about 1.3m above MSL by dredging a harbour inside the area that is reclaimed. The total volume of sand required for the reclamation is estimated to be about 56,000 cubic metres. In order to get this volume of sand using the proposed borrow area (harbour), it is estimated that the borrow area has to be dredged to about 5m. Otherwise, an additional volume of about 18,000m3 of sand would be required to reclaim the given area. The primary objective of the project is to create a harbour for the several barges, landing crafts and other vessels owned and operated by Heavy Load, to provide safe and adequate access to the facility and to provide space for the different activities carried out on the site as well as to improve the services provided by the facility. The proposed project area is on the southeast corner of Thilafushi, which is the official landfill island for the entire Maldives. Currently, the site has two sand beds on the west and eastern sides, which mark the eastern and western edges of the proposed reclamation area. The exact area is being currently finalised by Thilafushi Corporation Limited (TCL). Once TCL finalises the exact dimensions of Heavy Load Site, dredging and reclamation works will begin. The entire external periphery of the dredge area would be sheet piled prior to dredging and filling works so as to minimize sedimentation. The southern periphery, which faces the sea, would have further protection using rock boulders, which would be installed as a final step. The project is, therefore, expected to take about eight to twelve months. A large proportion of the reef flat on the southeast end of Thilafushi has been dredged to provide access to the different industrial plots of land in the area by large vessels with an entrance channel at the southeast corner of Thilafushi reef. The proposed dredging is similar in size, however, would have less impact on the marine environment in the area. The reef flat in this area is almost completely dead with a few live porites. The reef slope is also mainly dead. Given the currents in the proposed dredge area is slow and generally in a westerly direction, the potential for the sediments to move to the reef flat would be small. However, it should be noted that there is a lack of long term data to support this observation. Therefore, sediment settlement on the reef has to be minimized and the most practicable means to achieve this would be to sheet pile the reclamation area prior to dredging. This would minimize sedimentation while further mitigation measures including silt curtains at the discharge points of the silt passages may be used. However, this would only be necessary if the silt levels reach very high levels. Technical ReportItem Environmental impact assessment : for the removal of seagrass beach replenishment activities in Herathera Island Resort, Addu atoll, Maldives(2010-09) CDE ConsultingThe Herathera Island has been experiencing seaweed overgrowth for a number of years, even before construction began on the island. Similarly, the island does not have a natural beach system which is suitable for a resort product. An attempt was made in 2007 and 2008 to remedy these shortcomings by removing seagrass and undertaking beach replenishment. Unfortunately, the beach replenishment design and implementation was flawed and new seagrass colonies have started to emerge. The island is currently is a worse condition, particularly its beach system. These environmental issues are decreasing the economic value of the tourism product being offered Resort and is reaching a point where the product may be unviable. Immediate action is required to address these issues, thus, a new and improved beach replenishment and seagrass removal programme. The proposed project involves the removal of sea grass colonies and beach replenishment. Details of the proposed project components are outlined below. a) Sea grass removal The primary component of the project is seagrass removal. Seagrass areas covering approximately 200,000 – 250,000 m2 is proposed to be cleared (see Site plan in Appendix B), 100,000 m3 of dredge waste. TwoEIA for the proposed Seagrass Removal and Beach Replenishment Activities in Herathera Island Resort Prepared by: CDE Consultancy Page| ix methods have been proposed for the project: 1) using a sand pump; 2) using an excavator and; 3) soft measures. b) Beach Replenishment Beach replenishment has been considered as part of the project to mitigate the severe erosion on the island. The dredged waste from the sea grass removal activity, after cleaning and sorting, will be used to replenish the a 2900 m beach up to 10 m from the existing shore line. Additional sand will be dredged from borrow areas within the lagoon using sand pumps and excavators. Replenishment will be carried out using a three staged process. The first stage will collect and filter sediments on designated sites. The second stage will transfer the cleaned sediments to severe erosion zones using trucks. The final stage will profile the beach using fine sand. For the direct replenishment, sand will be pumped or transferred via barges to a designated location, where loaders and trucks and move the material. Technical ReportItem Environmental impact assessment : for the development of a 14 Storey Building at H. Filigasdhoshuge, Malé, Maldives(2010-06) Jameel, AhmedMr. Ali Shareef is proposing to build a 14 storey hotel at H. Filigasdhoshuge. This Environmental Impact Assessment (EIA) report has been prepared in order to meet the requirements of Clause 5 of the Environmental Protection and Preservation Act of the Maldives to assess the impacts of proposed development at H. Filigasdhoshuge, Male’. The report has looked at the justifications for undertaking the proposed project components. Alternatives to proposed components or activities in terms of location, design and environmental considerations were suggested. A mitigation plan and monitoring programme before, during and after the works has also been proposed. The project component that has the greatest potential for environmental impact is the foundation component. The foundation type has been considered taking into consideration the noise and vibration impact from the deep pile foundation construction of project which was undertaken in the vicinity to the proposed site at Holiday Inn. The proposed project has proposed a raft foundation where piling technology has been chosen as a mechanism for shoring for the foundation construction process. A geotechnical investigation of the proposed project site was undertaken by the ELS – Amin International Pvt Ltd of Maldives in September 2008. The geotechnical investigation included the borehole investigation and Standard Penetration Tests. The geotechnical investigation revealed that the estimated settlement under the foundation would be less than 50mm which is acceptable for the type of foundation chosen for the building. Since the settlement under the foundation is small and a setback of 1 m has been provided between the plot boundary and the foundation, the ground settlement beyond the limits of the boundary would be too small to induce any significant damage to the neighbouring structures. A survey of the existing structural damage was carried out for all buildings that were located within a radius of 20m from the proposed building. The proposed project is expected to increase the housing units and commercial floor area available in Malé. It is inevitable that there would be some negative environmental impacts, especially when excavation is undertaken. Nevertheless, these negative impacts are not so severe to the extent that the project should not be allowed to take place. As a result, a comprehensive monitoring component has been suggested which takes in to consideration the most important elements that require regular checks. This monitoring component will be adhered and will allow the assessment of long term changes, despite the limited nature of the impact. The most important consideration is the socioeconomic impacts that have been assessed mainly as positive in nature. Not only are they positive, but most importantly would they remain positive for a long term. Therefore, it appears justified from a technical and from an environmental point of view, to carry out the proposed project in light of the existing socio‐economic developments. Technical ReportItem Initial environmental examination for a coral frame project(2010-07) Systems Engineering and Marine ConsultingThe potential environmental impacts of the development of a coral propagation project on the island of H.A. Manafaru are assessed. Manafaru is leased to Beach House Maldives and is operated by the Waldorf Astoria collection of the Hilton group. The assessment exposes the solutions and preferred alternatives as well as mitigation measures to minimize any negative impacts whilst trying to derive the maximum positive impacts from the project. Manafaru has very little coral cover after being degraded by the 1998 bleaching event. As it is important to be proactive in reef restoration, the resort management wishes to enhance the value of the island by propagating corals using the coral frame technique. The frames will be installed near the water villas and sparsely on the house reef. Coral fragments will be attached by a marine biologist and will develop into full colonies within a few years. Coral fragments from the house reef will provide a small number of fragments and will heal rapidly. Preference will be given to damaged colonies. 136 frames of 1m2 will be initially deployed, and after the first batch, the existing frames will provide fragments for transplantation. The project will start as soon as approval is granted, and as this is a long term project, it could span several years before completion. The island of Manafaru is located inside the northernmost atoll of the Maldives, and is subject to high winds and warming waters, which may be a cause of low coral survival. As the island is located in the middle of the atoll, the waves reaching its shores are diffraction of swells, and wind waves. As the energy encountered are of second magnitude, and the reef does not form a proper crest, the waves reach the island with less obstruction than most areas. Sand displacement depends on the predominant influence during different monsoons, forming a bulging beach rather than a sand tip. Technical ReportItem Environmental impact assessment for the proposed shore protection project in Kurendhoo, Lhaviyani Atoll, Maldives(2015-12) SandcaysThis report discusses the findings of an environmental impact study under the shore protection project proposed for Kurendhoo in Lhaviyani Atoll. The project is proposed by Ministry of Environment and Energy. The project comprises of the protection of the eroding area on the southeast corner end of the island, adjoining the football ground. Shoreline at this part of the island has to be protected for safeguarding the football ground and protect the area from severe erosion. A 220m long rock boulder revetment has been proposed. The project also involves backfill of the proposed revetment area and behind the previously proposed breakwater on the north by getting sand from approved borrow areas. The project will be undertaken together with the ongoing harbour project and is estimated to take about 120 days with a manpower requirement estimated at 27 and involving heavy machinery including excavator, dump truck, loader and crane. A number of alternatives to the proposed project components have been identified in this document. Of these, the preferred alternative is a groyne field with a nearshore submerged breakwater. The cost of the preferred alternative is similar and the protection to updrift and downdrift locations are further enhanced by appropriately-designed groyne field. Other alternatives include just a groyne field or a semi-submerged breakwater. Rock boulders is the preferred material for the proposed shore protection while geotextile bags or geotextile tubes may be used as a cheaper alternative but would not be as effective as rock boulders. There are not many options to be identified as borrow areas since the island is surrounded by quite narrow reef flats and there are no lagoon areas with fine sand. Therefore, the alternative would be to bring material from a lagoon nearby and have the material taken to the fill location in trucks or pumped to fill location. However, due to the small scale of the project, alternative borrow areas have not been considered except those areas that have already been approved. Environmental impacts were assessed for both the construction and operational phases of the project. Most of the direct, negative environmental impacts identified for the construction phase of the project were minor negative; the main impact being sedimentation during the filling of the proposed fill areas. However, these impacts are of low significance while the benefits of the proposed project outweigh the negative impacts including the protection to the football field, shore protection to the beach in the area as well as downdrift locations. The fill areas shown in the proposed project are the same areas identified in the EIA and the EIA Addendum for the harbour project. Therefore, in principle those areas have been approved. However, for the purpose of this EIA, the borrow areas are different from those proposed earlier. According to the Council, the area identified on the SW side is preferable for dredging because this area is more suitable for a creating an area for swimming since the reef extent on this area is greater than in other areas. Since it does not have adequate swimming depths, deepening this area provides the required fill for the southeast end while creating swimming area for the island that lacks swimmable area around the island. The creation of the swimming area or an artificial beach in the proposed area, however, is not within the scope of this EIA report. The impact on coral reef is also less in this area since the net flow in this area is generally towards the eroded southern end and the reef flat and slope are devoid of live coral and mainly with bedrock. For the fill area on the north, the harbour area would be quite suitable as it would provide sufficient material for the proposed fill area while keeping the impacts to an already impacted area. Therefore, it is considered most suitable to dredge material for the northern fill from the harbour area and that for the southeast fill from the southwest lagoon. The small borrow area shown on the north may be considered only if adequate fill material cannot be obtained. Since there are a few impacts, there are no specific mitigation measures for the proposed project. General mitigation measures, involving appropriate construction management such as working during low-tide as much as possible and rigorous supervision during project implementation are recommended Since monitoring has not been undertaken in the past for the harbour project, it is recommended to carry out monitoring for this project. This project has linkages with the harbour project and therefore the recommended mitigation measures and monitoring programmes in the EIA and Addendum for the harbour project shall be undertaken in conjunction with the proposed shore protection project. In conclusion, it appears justified, from a technical and environmental point of view, to carry out the proposed shore protection project. Since alternatives have not been considered or discussed with the relevant stakeholders including the Council, it is recommended to consider all potential alternatives to shore protection, including those identified by the EIA Consultants, before proceeding with the project. Technical ReportItem Environmental impact assessment for the proposed sewerage system in Ihavandhoo, Haa Alifu Atoll, Maldives(2015-11) SandcaysThis report discusses the findings of an environmental impact study under the proposed sewerage system project at HA. Ihavandhoo. The project is proposed by Ministry of Environment and Energy. The project entails establishment of a proper island-wide sewerage system with a sea outfall. The proposed project will involve installing a pipe network to collect sewage from all the households on the island and necessary pumping stations. Currently raw sewage is disposed onto the ground via house-level soak-pits; polluting groundwater greatly. The proposed outfall will pump wastewater beyond the house-reef at over 7m depth. A number of alternatives to the proposed project components have been identified in this document. Of these, the preferred alternative is to change the outfall location. It is also proposed to consider a treatment plant in the design, though the consultants are of the opinion, proposed system without a treatment plant but changed outfall location is the best option. Other alternatives include considering different disposal options; ground and lagoon, which are not recommended for reasons of greater environmental pollution. Environmental impacts were assessed for both the construction and operational phase of the project. Most of the environmental impacts identified for the construction phase of the project were minor negative; these include sedimentation from installing the outfall and temporary salinization of groundwater from de-watering to lay out the pipe network and pump stations. However, the impacts identified for the operational phase of the project were mostly moderate to major positive; improvement of groundwater quality from stopping the current sewage disposal practise and reduction of related health hazards. Disposal of sewage via proposed sea outfall is considered to have a minor negative impact. The main mitigation measures for this project during the construction phase are similar to other sewerage projects such as dust control plans, working during low- tide as much as possible and rigorous supervision. In case of deterioration of groundwater quality due to potential dewatering during construction of lifting stations in residential area, measures to water plants in the area that may be affected due to dewatering shall be in place. The design shall also ensure that dewatering is minimized. As for the operational phase trained maintenance staff to service the sewerage system and regular check-ups has been suggested in addition to monitoring water quality as well as reef health for potential impacts. Increasing awareness on groundwater conservation and promoting sustainable groundwater aquifer management, especially the skimming well technology has been suggested. The Proponent is willing to undertake monitoring during and after the construction phase in addition to undertaking the mitigation measures proposed by the consultants. In conclusion, it appears justified from a technical, administrative and to some extent environmental point of view, to carry out the proposed sewerage system development project. The alternative of wastewater treatment will involve greater operational costs; therefore, it is recommended to proceed the project as proposed while keeping the option open for future wastewater treatment, as and when required. Technical ReportItem First addendum environmental impact assessment for the proposed coastal protection Naalaafushi Meemu Atoll, Maldives(2015-07) SandcaysThis report addresses environmental concerns of the proposed access channel maintenance dredging at M. Naalaafushi. The initial EIA was done on the proposed coastal protection project in Naalaafushi. During construction phase of the project, existing access channel was found to be too narrow and shallow for the barge carrying rock boulders for use in revetment construction to enter. The channel was proposed to be dredged as part of the ongoing coastal protection project to achieve suitable depth and width for barge to enter. As such, the existing channel will be widened to achieve 25m and dredged to 3m below MSL. Sand will be stockpiled on the existing islet north of the channel. Even though the proposed maintenance dredging is minor and will be completed within a short period of time, based on the dominant flow, moderate amounts of sedimentation is expected on the housereef. As such main impact of the proposed component is changes in marine water quality in the vicinity of the proposed excavation and resulting negative impacts on benthic sessile organisms. To mitigate this, limiting excavations to low tide and proper setting out before excavation begins is proposed. Furthermore, larger live corals within the vicinity of excavations are proposed to be moved to a safer location before excavation begins and long term monitoring is also proposed. Additional sites for water quality and marine life assessments were added to the monitoring programme proposed in EIA report. Given that this project component does not have major irreversible environmental impacts if proposed mitigation measures are employed and is part of a major coastal protection project, the project maybe allowed to proceed. Technical ReportItem Environmental impact assessment (EIA) for establishment of a katsuobushi processing facility in Hithadhoo, Addu City(2015-12) Adam, M. Shiham; Ahusan, Mohamed1. The Environmental Impact Assessment (EIA) report carried out for proponent Yours Maldivian Addu Katsuobushi Pvt. Ltd. to develop and operate a katsuobushi plant on a leased plot of land from the RAF area of Hithadhoo Island, Addu City. The EIA is prepared as fulfilment of the requirement by the Ministry of Environment and Energy for granting permission for the Project. Environmental Impact Assessment (EIA) of development projects is a requirement by the Environmental Protection and Preservation Act (EPPA) (law 4/93) of the Government of the Republic of Maldives. 2. This report has been prepared in accordance with the Environmental Impact Assessment Regulations published by the Ministry of Environment and Energy in 2012 and covers environmental and socio-economic impacts arising from the proposed project. Major findings of this report are based on data and information gathered during the field inspection of the existing environment. In addition, expert judgement and published literature were used to predict the possible impacts from the project. 3. The development project is located in the western side of the southern section of Hithadhoo Island, Addu Atoll. The plot is separated from the western beach by about 65m of coastal vegetation. Terrestrial vegetation around the plot area is a mix of salt and salinity tolerant trees and shrubs. The population of the Island is mostly concentrated to the northern end of the island while the southern end is sparsely inhabited resulting in an abundant. 4. Tuna to be processed will be sourced from the local fishermen. While only skipjack tuna will be used to make katsuobushi, other species in the catch (yellowfin tuna and small amounts of bigeye tuna) will also be purchased and processed into other products and marketed to the locals. This is in order to incentivize the fishermen to sell their catch to the proponent and ensure a steady supply of raw materials. 5. Pole-and-line tuna fishery of the Maldives exploits the wider Indian Ocean stocks, the management of which falls on the Indian Ocean Tuna Commission (IOTC). Maldives is a full member of IOTC and takes a lead role in promoting management of the Indian Ocean tuna stocks. Most recent assessments for skipjack tuna (2014) indicate that the skipjack tuna stock is being exploited at safe levels. However, 2015 assessment of yellowfin tuna stocks showed that the stock has been overfished and is being overfished. 6. The development project involves construction of a 100 by 100 feet processing facility, its supporting infrastructure and a staff accommodation block for the employees of the facility. All construction will use general construction materials such as cement, imported river sand and aggregate, deformed steel bars etc. Construction materials and crew will be transferred to, and waste removed from the facility via existing dirt roads. 7. Major waste stream from the factory would consist of organic waste (fish offal) and blood water from gutting and cleaning raw fish, domestic sewage diluted in flushed water and greywater from the staff accommodation block and ash from the smoking process. 8. Organic waste (consisting of viscera, cuttings, skin and bones) will be collected in leak proof containers and routinely removed from the facility before it becomes putrid. This will be disposed of in the sea by an external party during the first year and later used to make agricultural fertilizer. Blood water and water generated from cleaning the facility will be discharged onto the reef flat on the western side of the island. Septic tanks will be used for the treatment of domestic sewage and greywater from the accommodation block. 9. Assessment of the existing terrestrial environment in the vicinity of the site showed that the area consist of typical island vegetation except for a dominance of coconut palms (Cocos nucifera). Site of the project does not contain strong vegetation as it was cleared prior to leasing to the proponent. Small scale farming takes place in plots around the project site. 10. The island being located on the western atoll rim reef and the project site being located on the western side of the island, is in close proximity to the marine environment. The beach is exposed to strong swell waves originating in the Western Indian Ocean. Breaking of waves on the reef creates longshore currents which would allow almost instant mixing and dilution of effluent discharged. Benthic cover on the reef flat/lagoon showed a predominant abundance of seagrass and a lack of live corals and associated benthic fauna. 11. Minimal environmental impacts are predicted for the project. Key negative impacts include a transient deterioration of water quality at the effluent discharge site and likely deterioration of groundwater due to sewage from the accommodation block. Further, a localized reduction in air quality is expected due to gaseous (NOX) and particulate emissions from the smoking process. 12. The project is expected to have a number of positive impacts on the local economy and wellbeing of locals especially fishermen. Firstly, fishermen will be paid a competitive price for their catch in order to ensure a reliable supply of raw materials. The project will also open up employment opportunities for locals. Further, it will contribute to the local economy by outsourcing some aspects of the project such as waste disposal and sea transport of products to Male’ and contribute to government’s policy of value0addition of fishery catch. Technical ReportItem Environmental impact assessment for land reclamation at Thinadhoo, G.Dh Atoll, Maldives(2015-12) Maldives Energy and Environmental CompanyThis report provides the finding of an environmental impact assessment conducted for the reclamation of 56 hectares on the north and south of Thinadhoo to facilitate much needed additional land for the residents of the island. The project is proposed by Ministry of Housing and Infrastructure. According to EIA Regulations 2012, an Environmental Impact Assessment is required for reclamation and dredging projects. Thinadhoo is a highly urbanized settlement and the settlement footprint covers 90% of the total habitable land area. As a result almost all land available is currently being used for housing, economic establishments and socio- economic infrastructure on the island and the island is land-locked. Hence, there is an urgent and immediate need for land reclamation in Thinadhoo. It is estimated that approximately 1.5 million cubic metres of borrow materials would be needed to reclaim 56 hectares of land in Thinadhoo. The proposed locations for the sand borrow areas are within intra-atoll basin of Gdh. Atoll. Alternatives have been identified in the project document. These include alternatives for the dredge areas, dredge method and alternative reclaimed areas. In addition, a coastal protection of the 80% of the reclaimed land (approximately 1852 m) would be put in place. Environmental impacts were identified and assessed for both the reclamation (construction) phase and operational phase of the project. Most of the environmental impacts of the project have been identified as positive resulting mainly from improved socio-economic conditions, increased economic activities in Gdh. Atoll as a whole, direct and indirect employment opportunities, and increased business opportunities. The main negative environmental impact of the project is identified to be the changes in hydrodynamics and sedimentation. Moreover, a significant impact would be felt on the marine environment in the northern part where an inevitable habitat loss would occur. The impacts of the project would be felt on the marine ecosystem of Thinadhoo and mitigation measures have been proposed to reduce sedimentation and other adverse impacts that would arise from the project. Mitigation measures such as, proper timing of dredging and reclamation, management of traffic, proper use of bund walls or silt screens have been proposed. If not properly managed, there could be cumulative impacts due to sedimentation which is already experienced in the nearby reef systems. These include provision of bunds and control of dredge water flow in to the marine environment. These methods have been discussed in detail in the report. The main mitigation measure for the proposed project would be the provision of shore protection for the newly reclaimed areas. The Proponent, Ministry of Housing and Infrastructure is committed to undertake monitoring during all stages of the project. The activities proposed in the project comply with the environmental laws of the Maldives, its rules and regulations. In conclusion, this EIA has looked into the key factors that needed to be looked in to during construction and operational stage. In my opinion, even though this project does have significant environmental impacts to the marine environment, the significant positive impacts that would arise from the reclamation to an atoll that lacks many natural resources for other economic gain, the additional land would provide such as asset for the wellbeing of the population and residents of the island/atoll. Technical ReportItem Environmental impact assessment for proposed coastal protection works in Dh. Maaenboodhoo Island(2015-11) Zuhair, Mohamed; Shakir, IbrahimThe proposed project is to protect areas affected by beach erosion on the NE, SE, NW and SW of Dh. Maaenboodhoo Island by means of rock boulder revetment breakwater and geobag revetment. In this regard, it is proposed to build a 220m long rock boulder revetment breakwater along the NE side, 550m long rock boulder revetment breakwater along the SE side, 225m long geo-bag revetment along the NW shoreline and 190m long geo-bag revetment along the SW shoreline of the island. Furthermore, profiling and backfilling of beach areas on the NW and SW sides as well as obtaining core fill material for the rock boulder revetments are an important part of the proposed project. As the proponent of the project, it is proposed by Ministry of Environment and Energy and has been awarded to Sas e Senok JV Pvt. Ltd. on design and built basis. As the contractor for the project, Sas e Senok JV Pvt. Ltd. has undertaken the Environmental Impact Assessment (EIA) Report to be submitted to Environmental Protection Agency (EPA) for approval. This EIA is prepared as per the Terms of Reference (TOR) approved by Environment Protection Agency (EPA) on 23 September 2015. The scope of this EIA is to assess the existing environmental condition of Maaenboodhoo Island and surrounding environment, identify potential environmental impacts, propose environmental management and mitigation measures to minimize environmental impacts as well as propose an environmental monitoring plan with appropriate environmental parameters to monitor changes during construction and post construction stages of the development. Maaenboodhoo Island is found at Longitude 72.963335 and Latitude 2.695566 in a 5km long reef found on the southern periphery of Dhaalu Atoll. The island is found in the NE tip of the reef and has a NE-SW orientation. The longest point of the island has approximately 950m and the widest point has approximately 350m. The average area of the island is about 20.4ha. Main environmental impacts from the proposed project will be from sedimentation including water quality deterioration, reef damage as well as direct destruction of lagoon habitats within the project boundary as well as permanent changes to the shoreline of the island where project activities will be implemented. Although, these impacts are inevitable, it is effects can be reduced by implementing various environmental management and mitigation measures such as undertaking the activities of the project coinciding with low tide and on calm days as well as undertaking the operations in the quickest possible timeframe to reduce impact exposure period and construct physical barriers to reduce sedimentation. During post construction, environmental impacts identified include risk of flooding in land fill areas as well as physical damage to geo bag revetments as a result of excessive and some destructive use. The key benefit of the project is to protect the shorelines of the island from further beach erosion and protect infrastructure on the island. With regards to mitigating and reducing significant environmental impacts from the project, the following measures including use of physical barriers such as sand beds and undertake the activities in shortest possible time and on calm days at low tides, as well as directing sedimentation into the deep lagoon area and number of other measures have been proposed. Although there are a number of environmental impacts from the proposed development, some of these can bring permanent changes to the environment of the island, other impacts can be reduced and mitigated by use of appropriate methodology. The effectiveness of these methodologies can be documented by implementing a comprehensive monitoring programme. Also, with positive social outlook of the project and considering the overall need for the project, it is concluded that the project should go ahead as planned.