Academic Articles -- ޢިލްމީ ލިޔުންތަކުގެ ޖަމާ
Browse
108 results
Search Results
Technical ReportItem Environmental impact assessment for the proposed development of an agricultural island Dhurureha Thaa Atoll, Maldives(2017-09) SandcaysThis report discusses the findings of a social and environmental impact study under the proposed development of agriculture on Dhururehaa, Thaa Atoll. The project is proposed by Mohamed Latheef. The proponent aims at developing Dhurureha as an agricultural island; providing job opportunities, reducing dependency on imported produce and ultimately working towards economic diversification and growth of Maldivian economy. The agricultural activities on Dhurureha will be carried out in greenhouses as a hydroponics system. A total of 12 greenhouses (100ft by 50ft each) is proposed to be built for growing tomato, capsicum, bell pepper and lettuce. Additionally, a 60m by 30m nursery will be built on the island. Access to the island is to be provided by dredging an access channel and a 200m jetty. Water requirement for the project is to be met by utilizing an RO plant. A suitable size diesel generator will be used throughout the project to meet power requirement. Staff facilities such as accommodation, mesh room, mosque and office building will also be constructed on the island. A cold storage, general storage and small packaging facility will also be constructed on the island during construction stage. A waste collection and management station will be established for using during construction phase and operational phase of the project At present, Dhurureha is an uninhabited island not used for any purpose. However, locals of the nearby communities use the island to collect coconuts, go on picnics and gather firewood. Alternatives to project components have been identified in the project document. These include alternative uses of the island such as for a tourist resort. However, upon closer analysis of these options, the proposed development of the island for agricultural purpose was found to be more viable based on the present circumstances under which the island has been leased. Therefore, the consultants propose exploring use of alternative renewable sources to the proposed fuel based energy generation. Environmental impacts were assessed for both the construction and operation phase of the project. Most of the environmental impacts of the project have been identified as minor negative with highly positive socio-economic impacts. The main negative impacts from the project include habitat loss from vegetation clearance, sedimentation and consequent impacts on marine wildlife health and waste generation during the operational phase. The mitigation measures outlined for these impacts include conserving mature trees to the greatest possible extent, relocating large live corals at the proposed access channel area and establishing dust control plans in addition to employing best-practice guidelines during the operational phase. The most positive socio-economic impacts related to the project are increase in job opportunities, reduction in prices of agricultural produce and increase of national revenue. It is inevitable that there would be some negative environmental impacts. However, most of the impacts of the proposed project are minor compared to the positive socio-economic benefits of the proposed system. Yet, monitoring to ensure the effectiveness of the proposed project would be necessary. Therefore, a monitoring component has been suggested which takes in to consideration, the most important elements that require regular checks. This monitoring component will be adhered to and will allow the assessment of changes due to construction and implementation of the proposed agriculture project. Monitoring is specifically focussed on employment opportunities, price changes in the market, direct and indirect economic ventures, ground and marine water quality, changes in the hydrodynamics of the project area as well as impacts on the reef or marine ecological area of importance. In conclusion, it appears justified from a technical and environmental point of view, to carry out the proposed project to develop Dhurureha as an agricultural island. Technical ReportItem Environmental management plan for the proposed development of Island Waste Management Center in TH. Vandhoo(2017-09) Zuhair, Ahmed HassaanThe proposed development of Island Waste Management Center (IWMC) in Th Vandhoo is funded by the Public Sector Investment Program (PSIP) of the Government of Maldives. The aim of this project is to alleviate current waste management problems endured by the island community and thereby improve the overall environmental and public health condition of the island. The proposed IWMC will be developed in a 500 square meters’ area located in the South East side of the island. This site is at a considerable distance away from the residential population and vegetation line and meets the land allocation criteria of both Maldives Land and Survey Authority (MLSA) and Environmental Protection Agency (EPA). At present, no major vegetation exists in the site except some scrubs. However, according to the information provided by the Island Council, 7 mature coconut palms and 3 mature trees (Alexandrian laurel) were previously present at the site. The Island Council has been undertaking land clearance works since 2015, as the site has been identified by the council to develop IWMC in 2015. An EPA declared environmentally sensitive mangrove area exists in the north western side of the island. However, this area is 400 meters away from the proposed IWMC and therefore, no negative impacts to this area are envisaged to occur as a result of the project. The project will provide basic infrastructure necessary to manage waste at island level and ensure composting is undertaken in the island. After completion of civil works, the IWMC will be operated by the Island Council in accordance to the Island Waste Management Plan. Training on composting for island level staffs and machinery such as, shredders, wood chippers and bottle crushers will be provided to facilitate adequate functioning of the IWMC. Waste that is not manageable at the island level will be stored and regularly transferred to a regional waste management facility (RWMF). All civil works of the project are expected to be completed within 6 months. Environmental impacts of the project were evaluated using the Rapid Impact Assessment Method (RIAM). Majority of the impacts envisaged for the project are highly positive. The project is expected to bring numerous economic benefits to the island community, in additional to the perceivable environmental and public health related benefits. The only permanent negative impact likely to occur as a result of the project is related to the removal of vegetation. However, the amount of vegetation clearance involved is minimal and therefore, if the mitigation measures proposed in this management plan are adhered, almost all the negative impacts can be brought to an acceptable level. The monitoring program proposed in the EMP will ensure the implementation of the mitigation measures and assist in the identification of unforeseen impacts throughout the project. Overall, the project is expected to provide significant socio-economic and environmental benefits for the local community. Technical ReportItem Environmental impact assessment for the proposed agriculture project in Funadhoo, Gaafu Alifu Atoll(2017-09) Musthafa, Amir; Wahhab, Mahfooz Abdul; Adam, RashihuThe proposed project is to undertake an Agricultural Project located in the island of Funadhoo in North Huvadhoo Atoll at 0°33’42.85” N and 73°31’33.83”E. The nearest airport is Koodoo airport approximately 20km north of Funadhoo. This Environmental Impact Assessment (EIA) report has been prepared in order to meet the requirements of Clause 5 of the Environmental Protection and Preservation Act of the Maldives to assess the impacts of the proposed Agriculture Project in GA. Funadhoo. The main components of the project include: creating accessibility to the island, Vegetation clearance, setting up utilities, harvesting local produce, and livestock farming. Currently, about 90% of fruits and vegetables are imported from overseas to the Maldives. The majority of this food are transported to the tourist resorts and a major portion of the remainder is used by the people of Male’, Hulhumale’, Villingili and nearby islands. The quality of the fruits and vegetables which reaches the atolls is therefore, compromised and not adequate for the population in terms of quality and volume. Therefore, there has always been great need to improve on this condition. As such, one of the main objectives of this project is to meet the needs of the local communities. Interms of harvesting and growth, based on the available land, the growing area will be allocated in a manner which has minimal effects on the natural habitat and trees to effect minimum interruption. One hectare will be designed with net houses to grow most vegetables, such as cucumber, chili, tomato, capsicum and sweet melon. In addition to that, availability of affordable fruits and vegetables to the local communities in Huvadhoo Atoll will be a priority. Goods will be produced using locally available fertilizers in order to promote healthy vegetables and fruits. Another eight hectares will be used for open growing such as coconut trees, banana, papaya, pumpkin, and sweet potatoes. A two hectare area will be allocated for facility development as well as maintaining livestock. This will help to maintain a naturally fertile land and make fresh meat available in the local area. A 30kVA gensets will be established at the project site in the powerhouse, along with Two 5kVA gensets. A 10 ton RO plant will be placed in the island along with a 6 ton plant for back up. 3 septic tank systems will be put in place as sewerage system. A rainwater collection system for building roofs would be built to subsidize and support the water production facility. A micro sprinkler system will be laid along the farm for irrigation purposes. Disease control and quarantine facilities will be in place. The project is expected to be completed in 12 months. Regarding existing environment, there are no declared environmentally sensitive areas on Funadhoo island. 9 different types of vegetation species were found on Funadho during the survey. Majority of the mature trees in the island were Screw pines, typical coastal vegetation and coconut palms. It is expected that about 30 to 40 percentage of vegetation will be removed as part of the works. However, coastal vegetation will not be removed and a 20m buffer area will be maintained. The island undergoes erosion on the eastern oceanward side, although a substantial beach could be found on the western atollward side. Groundwater quality of the island was surprisingly poor, with large number of coliforms. Eastern lagoon was covered with seagrass beds, while the seagrass beds were present only near the coast on the Western side. It was observed that the Eastern lagoon was shallower compared to the Western side, having less than 1m at low tide. The results of the surveys show that 49.9% of the western reef was composed of rock with only 1.6% live corals, and limited number of target fish were observed. The legal framework for the project includes existing policy are regulation with respect to any development sensitive to the environment such as the EIA regulation, regulation on cutting and uprooting trees, Environment protection and preservation act, regulation on coral mining, waste management regulation, dredging and reclamation regulation, etc. In addition to these, there are agriculture specific regulation and guidelines, such as the Agriculture policy, general regulation for food establishment, etc. One of the most important set of guidelines with respect to the project is the Maldives Good Agriculture Standards, which has been recently formulated. While it is not mandatory to conform to the standards currently, the study strongly emphasises on its importance and recommends its incorporation to the project. Impact evaluation is undertaken by standard accepted methods. General impacts from development in uninhabited islands exists for the development such as those including vegetation removal and marine dredging, which has been noted among the more important ones. General mobilisation and setup impacts are also there, in addition to establishing and operating utilities in the island. Waste management in a secluded island such as this is important. More specific impacts occur due to handling and using chemicals and fertilizers, animal and pest control, and harvesting procedures. Mitigation measures are given for each impact. Vegetation removal is unavoidable. However, it is recommended to transplant larger trees as much as possible, and to utilise green waste as compost for the facility. Marine dredging impacts are likewise unavoidable. But the harbour is designed in such a way as to minimise the long term impacts. With regards to agricultural practices, it is strongly recommended to follow the Maldives Good Agricultural Practices. Alternatives for the project includes assessment of the no project option as per usual where the need for the project is discussed at length. It is concluded that the no project option is not viable at this stage. Other alternatives such as those for the project site, harbour area, water source, sewage options, and energy source has been discussed. The project has proposed the most simple and commonly used sources and it is recommended to proceed with these for the time being, while the harbour has been designed in the most environment friendly manner possible. Stakeholder consultations were carried out with different government authorities in addition to respective councils. The councils were generally supportive of the project. However, they all unanimously stated that they recommend more involvement of the island communities in development such as these. The government authorities expressed concern with respect to projects such as these and the agricultural industry of the Maldives in general. Monitoring program has been proposed as per usual. It is recommended to carry out annual monitoring even after the construction works have been completed. Important monitoring parameters include groundwater monitoring, marine water, marine life, shoreline, product water, general health and safety at site, etc. One of the key points with regards to impacts is, the scale/magnitude of works will be much less compared to other types of development which takes place in uninhabited islands such as airport developments or more typically, resort developments. The operation stage of the project will also be much more environment friendly than other developments. However, the main area of concern with regards to operation is apart from general good practices in maintenance and waste management, the use of fertilizers and chemicals. This can be regulated if it is ensured that the operation is in compliance with MGAP. In fact, the entire operation can be made sustainable once the operation fully conforms to the guidelines as provided by MGAP. Considering these factors and the great socio economic benefits the project will bring to the regional community, the project can be regarded to be environment friendly on a long term basis. With proper operating procedures as outlined in MGAP, mitigation measures as given in this study, and subsequent monitoring, it is recommended for the project to proceed as proposed. Technical ReportItem Environmental impact assessment proposed milkfish aquaculture project Matu, Gaafu Alif Atoll(2017-07) SandcaysThis report addresses the environmental concerns of the proposed milkfish (Chanos chanos) hatchery project in Ga. Matu. The project is proposed by Ministry of Fisheries and Agriculture. Concerns about live-bait availability over prolonged periods are being raised in recent years, especially in the southern atolls of Maldives. The development of aquaculture for selected bait species is seen as one possible measure to manage the live bait shortage currently faced by local fishermen. Cultured milkfish has been in use for the longlining industry in different parts of the world, and successfully piloted for the pole-and-line industry in Indonesia and Kiribati. Unlike most of the live bait species currently in use in the pole-and-line fishery, hatchery technology is well developed for milkfish. In addition, the relatively short duration to reach bait-size makes milkfish an ideal species for aquaculture development. Supplementing the tuna fishermen with cultured bait is expected to reduce the time spent on bait search, and in turn, result in increased effort directed to the tuna fishery. As live bait shortage is mostly reported from the southern atolls, the proposed hatchery site was selected from Gaafu Alif atoll, for logistical ease in distribution for the most needed areas can be made. The selected island, Matu from Ga. Atoll is 5.9 Ha small uninhabited island on the northern side of Ga.Atoll. The closest inhabited islands to the project site are Ga. Villingili and Kolamaafushi. The project aims to produce 100 tons of milkfish raised to the size of live bait used in the pole-and-line fishery. All required technical and support infrastructure will be constructed during the construction phase of the project. The operational phase will involve water circulation, feeding and rearing of cultured stock. In addition to hatchery, nursery and broodstock modules built on land, sea cages will be built for brood stock. Power will be provided for the project via diesel generators, while potable water will be provided via RO plants. Accommodation for staff and administrative buildings and waste management centre will also be constructed on the island. Access to the island will be provided via access channel and a jetty. The naturally deep lagoon will be used as a harbour during the project. Social and environmental concerns regarding the proposed project include: • Vegetation clearance during site preparation for construction of land infrastructures. This impact is considered minor negative as outmost care will be taken to reduce cutting down mature vegetation. Buildings will be adjusted as much as possible to reduce requirement of cutting or relocation of mature trees. When unavoidable, two plants for every tree cut will be planted on the island. • Sedimentation during excavation of access channel and construction of main jetty. This impact is considered as negligible as the excavation involved is very minor. Measures to reduce this impact such as working during calm weather and low-tide has been suggested as mitigation measures. • Minor impacts due to human activity in the area including littering both during construction and operational phases. • Increased nutrient loadings from faeces and uneaten food wastes, which will either dissolve or settle on the seabed beneath the cage. Since the water is deep and adequate currents exist, eutrophication is, however, unlikely. The proposed project is expected to be managed in conformity with local and international regulations and standards of relevance, especially environmental regulations and standards. Therefore, environmental impacts will be well managed, minimized and mitigated. Given that the project has major socio-economic benefits and some environmental benefits (potential to reduce pressure on wild populations of baitfish), it is recommended to allow the project to proceed as proposed. It is important to consider uncertainties and continue to monitor the project impacts and undertake appropriate mitigation measures in consultation with the EPA and other relevant government agencies. It is also necessary to undertake regular environmental monitoring activities. Technical ReportItem Environmental impact assessment proposed 10 storey building construction in H. Asrafee Villa, Male’(2017-09) Musthafa, AmirThis report is based on the proposed 10 storey building construction at the residence, H. Asrafee Villa in the capital city, Male’. The project is being developed and constructed by W Construction Pvt. Ltd., which will undertake the construction works and project management including overseeing the EIA process. The proponent of the project is Adam Shafeeq. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under ‘Jadhuvalu R’ of the Environmental Impact Assessment Regulations 2012 of the Maldives. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions based on favourable environmental conditions with the main focus on sustainability. The project also adheres to several other rules and regulations in the Maldives and has obtained permit from the Ministry of Housing and Infrastructure for the project to proceed. The area the project is proposed to be undertaken is a moderately built area in the east end of Male’. There is no natural terrestrial environment at site. The existing environment therefore was focussed on the regional climate of Male’, and the traffic distribution, and noise pollution in the area. The project area does not endure much traffic relative to the general traffic conditions in Male’. A general exterior overview of the existing structures in the area was also observed. It was found that most of the buildings in the area were old structures and maybe prone to some damages. Older buildings were mostly single storey structures and there was one high rise building on the north eastern corner of the proposed site. Therefore, serious structural defects are expected to be at a minimum, especially considering the standard foundation protection methods. The report does recommend to undertake a structural defects inspection study of the buildings in the same block as the proposed site by civil engineering experts. The overall environmental impacts of the project have been assessed using frameworks found in literature. Since the development is undertaken in a moderately built area, the results indicate that the proposed project has neutral impact. However, there are some significant impacts on the environment during the construction phase of the project and these needs to be mitigated to avoid any significant damage to the environment. Significance of the impacts and mitigation measures have been provided based on previous similar projects undertaken in the Maldivian environment and based on literature. The main cause for concern regarding this project is the impact it will have on neighbours residing in this area. As such, several short-term impacts are envisaged including air pollution, noise pollution, aesthetic impacts, traffic issues and safety concerns. As there are numerous high storey building projects being undertaken in Male’, there is no particular long term impact associated with this project, albeit an increase in cumulative impacts. The main reason an EIA was required for the project was due to the basement construction and associated impacts. These can be mitigated by restricting the type of storage materials in the area, implementing fire safety systems, and proper mechanical ventilation and drainage. Submersible pumps are proposed for the project as well as mechanical ventilation. The other impacts that do occur can also be easily mitigated to minimise and/or completely nullify them. Mitigation measure proposed includes creating awareness among the construction staff and neighbours regarding the scope of the project. Other measures include taking protective measures to ensure people residing and utilising the vicinity will not have to endure the impacts during the construction stage. Foundation protection measures are recommended and are provided as part of the project to prevent impact on neighbouring structures in addition to a 1m offset from the adjacent building. Dewatering procedure also needs to be undertaken with care, details of which are given in the report. Care should also be taken to prevent any damage to the road and disruption to traffic during transport of machinery and equipment. Alternatives, including the no project option and alternatives for some project components are also discussed. No project option is not viable at this stage of the project. Regarding construction methodology, a few alternatives are recommended. Regarding the design also, there are recommendations to make the development greener. These include interior landscaping to incorporate plants, use of green walls, use of LED lights, rooftop solar panels, etc. An environmental monitoring program is provided at the end of the report, which provides details on the parameters to monitor on site, and the frequency in which it needs to be done. Estimated costs for the monitoring works are given. Implementation of the program is essential for the sustainable development of the project. In conclusion, it is discussed the impact such major housing projects have for the increasing population density in Male’, and how it can be prevented at a policy level. However, taking this project as a standalone development project in an already heavily built island city, it can be concluded that no significant long-term impacts are predicted, none that the island community is not yet enduring. Therefore, it is recommended that the project go ahead as proposed with proposed precautions and mitigation measures as recommended in this study. Technical ReportItem Addendum 1 for environmental impact assessment of Hulhule-Hulhumale connecting link road development project in North Male‟, Atoll(2017-09) Water SolutionsThis report discusses the findings for the first addendum of the environmental impact assessment undertaken by Water Solutions Pvt. Ltd for undertaking the construction of the link road project between Hulhule-Hulhumale.. The project is proposed by Housing Development Corporation (HDC). The island of Hulhumale has been an important growth centre since its development. Presently, Hulhumale is the fastest growing urban centre and has residential as well as industrial developments to a scale that has never been experienced anywhere in the Maldives. Being close to Male‟ and the airport, Hulhumale has been attracting migrants from all over the Maldives. Construction of the Male‟ to Hulhule Bridge is presently the biggest infrastructure project of its kind under construction in Maldives. This project is very much tied with the present link road as this link road will provide direct connection of Hullhumale and the bridge, ultimately making the traffic flow from Hulhumale to Male‟. This road will be constructed on the east side of the existing land mass of Hulhule airport by reclaiming a small area further west of the existing island. The proposed road will consists of three zones. The details of the link road project is given in the Environmental Impact Assessment Report which is prepared by Water Solutions in August 2017 and the reason for the preparation of this first addendum report is due the change in location of sand burrow areas. In the Environmental Impact Assessment Report it was said that the sand will be obtained from the Hulhumale‟ phase 2, phase 1 and Maldives Airports Company Limited (MACL). However now that idea has been dropped out and it is now planned to obtain sand from the eastern side of Uthuru Thila Falhu and the bathymetry shows the depth varies between 40 to 60 meters approximately. The details of the geographic coordinates are given in the section project descriptions and Study Area. This lagoon has been used as a sand burrow area for previous similar projects and is estimated to dredge 410,000 cubic meters of sand from this location. The dredging project is subcontracted to the Dredging International (Cyprus) and it is estimated to complete the project in five to seven days. Environmental impacts were assessed and most of the environmental impacts of the project have been identified as resulting mainly from the coral reef damage caused by reclamation of additional land. Mitigation measures for the negative impacts have been identified and outlined in detail, especially sedimentation control methods. The most important mitigation measure is the use of bund walls in the fill areas. This EIA addendum was undertaken to assess the environmental impacts of the proposed dredging and reclamation to acquire more land for the link road construction project. Based on the assessment, it has been identified that the major impacts of the project will be felt on the marine environment during the dredging and discharging of sand. This EIA addendum report also highlights some of the studies and research work undertaken in similar environments, especially in Male‟، to understand the impacts of reclamation and construction works close to reef slope and how this knowledge can be transferred to similar environments based on the type of coastal protection methods in use. The mitigation measures are provided in the report with alternatives. It is vital to conduct the activities, during both project planning and construction phase, in line with mitigation measures emphasized in the report. Socio-economic impacts of the proposed project will be immense as direct land connection of Male‟ and Hulhumale would bring significant benefits to the general public. Connection of Hulhumale, Male‟ and the airport is a vital transportation link that would save time and money for more than 200,000 people residing in the greater Male‟ region. The environmental impacts of various projects that are currently being undertaken in the airport region have caused significant damage to reef in various areas. This project will also have its impacts, but the impacts will not be anything greater than to what the environment has already been subjected to. Therefore a comprehensive monitoring programme has been suggested which covers components of coastal and marine environment to assess how the critical components of this project will affect the environment and to what extent. It is important to follow this monitoring programme not only to comply with the regulation but also to ensure that the impacts are measures in realistic terms. Though some of the components of this project contravenes with the Dredging and reclamation regulation; the amendments brought to the regulation facilitates that this project could be implemented. Hulhule island is a special zone and Under clause 10 of the dredging and reclamation regulation, special projects are exempted. As the environmental consultants, it is our opinion that this project should be allowed to proceed as the environmental impacts of this project does not pose serious concerns to the natural environment. It is a project that has far greater socio-economic benefits than these limited environmental impacts. Technical ReportItem First addendum to the environmental impact assessment for the proposed harbour project in Nilandhoo, Faafu Atoll, Maldives(2016-07) SandcaysThis is the first Addendum to the EIA for the harbour project being undertaken in Nilandhoo, Faafu Atoll. The project is proposed by Ministry of Housing and Infrastructure. The project constitutes dredging of a large harbour for the people of Nilandhoo while at the same time creating land using dredged sand including additional dredging for proposed reclamation of 10hectares of land for housing and infrastructure development including semiindustrial activities. An environmental assessment was undertaken for this project in Nov 2015, which has been subsequently approved. According to the EIA report, the objective of the harbour project is to provide a sizeable harbour to accommodate the increasing number of vessels in the island and to restore the usability of the harbour that has been filled over time with the breakwater being damaged, especially following the tsunami of 2004. The harbour on the northeast side is too small given that Nilandhoo has a lot of large fishing vessels and has been serving as the regional hub with fuelling services established on the old (tsunamidamaged) harbour on the northwest. This addendum addresses the modification to the location of the borrow area. One of the main concerns is that the performance of the dredger is affected due to having to pump up to 1km from the borrow to the fill area. Therefore, it has been considered important to move the dredge (borrow) area closer to the fill area in order to enhance dredging performance and achieve cost-effectiveness. During the first Scoping Meeting, which was cancelled by EPA stating that the project justifications were not clear, EPA identified that the borrow area needs to be moved as far as possible from the proposed quaywall as there may be stability issues. Taking this concern into consideration, further alternatives to the borrow area were also considered by the Proponent in consultation with the Contractor and the representatives of Nilandhoo people. During discussions with the Council and people of Nilandhoo, they have raised concern regarding the need to protect the proposed harbour, which would involve huge costs if the proposed option were adopted although it had been mentioned in the original EIA that harbour protection will be considered in the future. Therefore, in order to reduce the overall cost of the proposed project and to increase the usability of the proposed harbour even during rough southwest monsoon, appropriate alternatives were considered to the harbour design as well although it is beyond the scope of this EIA. A number of alternatives to the proposed harbour design was considered in the original EIA report. Of these, the option of upgrading the existing harbour on the northwest has been given due consideration in the light of improving on social concerns related to limitations in land reclamation. An alternative analysis that have been done in the original EIA and during the current Addendum indicated that the preferred alternative to redesign the existing harbour would have several advantages over the proposed especially the ease of use during rough southwest monsoon while leaving the possibility of an external quaywall if it becomes necessary at a later stage. However, some stakeholders believe that the proposed option has advantages over the preferred alternative as it has better opportunities for future expansion and growth of the economic potential of the island. Some of the other alternatives considered in the original EIA report including the expansion of existing harbour on the northeast to the northwest has cost advantages while it has restrictions over future expansion that the recommended alternative in this Addendum provides. Environmental impacts were assessed for both the construction and operational phases of the project. Most of the direct, negative environmental impacts identified for the construction phase of the project were minor negative; the main impact being the impact on sedimentation from the proposed borrow area to the coral colonies in the vicinity and more importantly sedimentation during the filling of the proposed fill areas, which have already been covered in the original EIA report. Therefore, the impact of dredging has been considered in this Addendum. The main impact arising from the proposed new dredge area is the damage to the inner reef as a result of the dredging. There was a concern relating to the closeness of the dredge area to the proposed quaywall and the potential failure of the structure due to a collapse of the sides of the dredged basin. However, since the dredged basin would need to be dredged to less than 4m from the existing seabed, which is less than 6m in depth at present, there should not be such a problem. Only a few berths or quaywalls just adjacent to the reef edge dropping to 30m suddenly have failed whereas the proposed structure is over 110m from the dredge area, which will be dredged to only about 10m and not more than 13m under the current proposal. Furthermore, most of the naturally deep lagoon areas in similar islands would be about 10m in the middle areas with some areas having 15m depths. Therefore, the direct removal of some of the corals due to proposed option can be avoided by not dredging from the inner reef flat areas but the deep lagoon only, as in the proposed alternative. Reclamation of land considering current and future potential use is a favoured development activity in many islands today. However, based on the experience of most of the land reclaimed in many islands, the cost recovery of the project is low and taxpayers have reason to question the outcome of the project. Yet, if the project objectives were achieved by renting the reclaimed land for semi-industrial activities and housing developments, it may be a justifiable cost. It is sad to note that the proposed reclaimed land has yet to find itself a landuse plan and development scenario after several months of EIA approval that had passed by. This is a cause for concern in terms of the afore-mentioned socio-economic impact of the project, although it is beyond the scope of the EIA. If the land is appropriately managed, the project is considered to have several socio-economic benefits that will certainly outweigh the negative environmental impacts, which are of low significance. Although the impacts are not significant due to the absence of sensitive ecological elements that would be directly impacted, some project-specific mitigation measures have been discussed. These include consideration of the preferred alternative (which is also the or one of the alternatives discussed in the original EIA report) to mitigate the impacts of wave activity at the proposed quaywall, to consider shore protection as the reclamation progresses to minimize erosion and to move any live corals that may be directly affected into safer locations. General mitigation measures, involving appropriate construction management such as working during low-tide as much as possible and rigorous supervision during project implementation are also recommended. It is recommended to carry out regular monitoring as proposed in this Addendum, which replaces the monitoring programme given and approved in the original EIA report. It would be important to assess the movement of the sediment plume regularly and to ensure that sediment plume does not severely affect the reef areas. Turbidity levels are expected to be measured within the sedimentation zone on a regular basis up to 6 months after the project. In conclusion, it appears justified, from a technical and environmental point of view, to carry out the proposed project. Since alternatives have not been considered or discussed with the relevant stakeholders including the Council, it is recommended to consider all potential alternatives, including those identified by the EIA Consultants, before proceeding with the project. The preferred alternative borrow areas including the existing harbour on the northwest is recommended. Technical ReportItem First addendum to the environmental impact assessment for the proposed reclamation of Thinadhoo, Gaaf Dhaal Atoll, Maldives : change of borrow area(2016-05) Musthafa, AmirThis report is the Addendum to the EIA undertaken for the Proposed Reclamation of GDh. Thinadhoo, Maldives. This addendum is based on the change of borrow area after the sand search campaign has been undertaken. More details on the sand placing method is also provided in this addendum. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under the „Jadhuvalu R‟ of the Environmental Impact Assessment Regulations 2012 of the Maldives. This report would further conform to the Dredging and Reclamation regulation. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions in an environmentally sound manner. The new dredging location is about 8 km west of the proposed borrow area 1 and area 3 given in the original EIA. The overall environmental impacts of the project have been assessed using frameworks found on literature and the results indicate that the proposed project has minimum negative impact and have an overall net positive outcome. The main environmental positive impacts due to this change comes from the fact that it is slightly far from the resort islands and sensitive areas, and therefore direct impact guests will be minimised. However, the change results in the borrow area being located relatively closer to the inhabited islands area, which also hosts a dive spot and a sensitive area. However, the dredging location is still over 1 km away from the inhabited area, while it is about 7km away from the nearest sensitive area. Dredging activities will no doubt increase sedimentation impacts in the area, although lasting impacts are not envisaged. There are no additional impacts due to reclamation as there is no change in scope with regards to this component. Furthermore, it is important to note that the approved dredge locations in the initial EIA were closer to the “Havodigalaa” sensitive area. Important new stakeholders for the project include Atoll council, nearby resorts, and Management at the Airports company, who may use the surrounding region of the borrow area. The stakeholders consulted did not have any significant reservations. However, they did note that the shallow reef North of the borrow area was used for bait fishing, and fishermen from Madaveli use the general area and channel for fishing. The management at the airports company inquired whether the height of the dredger would cause any issues to incoming aircrafts. Both these concerns were attended to and subsequently, the stakeholders did not have any further issues. The height of the ship will not cause any issue since the channel was south of Kaadedhoo was not going to be used, and all stakeholders will be preinformed before dredging commences. Alternative borrow area options are not viable as the sand search campaign concluded that there are no other significant sand depots within a reasonable distance from Thinadhoo. Alternative areas are those that have already been excluded. The only other viable alternative is to source sand from another region. Importing sand from abroad will be very costly and will have further negative impacts at the reclaim site. It is recommended to continue to monitor the impacts of the proposed project by regular monitoring of marine water quality. The monitoring plan proposed in the original EIA is slightly updated to include more monitoring locations, near borrow area. A two stage monitoring plan is given, which recommends quarterly monitoring during the 1st year and less frequent monitoring for the next 5 years. Undertaking the monitoring, along with the mitigation measures is necessary to ensure the sustainable development of the project with minimum harm to the environment. It is thus recommended that since the project has major socio-economic benefits and environmental benefits, it is advisable to allow the project to proceed as proposed. Moreover, since the change in scope is relatively small, and since the initial EIA has been approved, and also considering the fact that the sand search campaign resulted in only one location within reasonable distance from Thinadhoo to obtain sand, there is no viable reason to postpone or cancel the project due to this change. Technical ReportItem First addendum to the environmental impact assessment for the proposed reclamation of Feydhoo, Addu City, Maldives : change of borrow area(2016-05) Musthafa, AmirThis report is the Addendum to the EIA undertaken for the Proposed Reclamation of Feydhoo, Addu City, Maldives. This addendum is based on the change of borrow area after the sand search campaign has been undertaken. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under the ‘Jadhuvalu R’ of the Environmental Impact Assessment Regulations 2012 of the Maldives. This report would further conform to the Dredging and Reclamation regulation. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions in an environmentally sound manner. The new dredging location is about 1.5km North of the proposed borrow area 1 given in the original EIA. The overall environmental impacts of the project have been assessed using frameworks found on literature and the results indicate that the proposed project has minimum negative impact and have an overall net positive outcome. The main environmental positive impacts due to this change comes from the fact that it is slightly far from the inhabited area, and therefore direct impact on inhabitants will be minimised. However, the change results in the borrow area being located relatively closer to the manta point, kuda kandu, and maa kandu, which a popular dive spot and sensitive areas respectively. However, the dredging location is still over 3-4km away from the sites. The area is slightly closer to the british loyalty wreck is also 3km away from the dredge area. Dredging activities will no doubt increase sedimentation impacts in the area, although lasting impacts are not envisaged. There are no additional impacts due to reclamation as there is no change in scope with regards to this component. Furthermore, it is important to note that the approved dredge locations in the initial EIA had similar distances away from other sensitive areas in the South. Important new stakeholders for the project include dive centres and fishermen who may use the surrounding region of the borrow area. While some dive centers had significant reservations and had been reported to be outright against the project taking place in the area, their reasons are not backed by sound science and there is simply a lack of information to conclude the dredging in this area will result in any lasting impact to the popular dive spots. Alternative borrow area options are not viable as the sand search campaign concluded that there are no other significant sand depots within Addu Atoll. Alternative areas are those that have already been excluded. The only other viable alternative is to source sand from another region. Importing sand from abroad will be very costly and will have further negative impacts at the reclaim site. It is recommended to continue to monitor the impacts of the proposed project by regular monitoring of marine water quality. The monitoring plan proposed in the original EIA is slightly updated to include more monitoring locations, near borrow area. A two stage monitoring plan is given, which recommends quarterly monitoring during the 1st year and less frequent monitoring for the next 5 years. Undertaking the monitoring, along with the mitigation measures is necessary to ensure the sustainable development of the project with minimum harm to the environment. It is thus recommended that since the project has major socio-economic benefits and environmental benefits, it is advisable to allow the project to proceed as proposed. Moreover, since the change in scope is relatively small, and since the initial EIA has been approved, and also considering the fact that the sand search campaign resulted in only one location within Addu Atoll to obtain sand, there is no viable reason to postpone or cancel the project due to this change. Technical ReportItem Environmental and social management plan for upgrading island waste management centre at Fuvahmulah(2016) Zuhair, Mohamed HamdhaanThis is a sub-project undertaken under, Climate Change Adaptation Project (CCAP), a World Bank managed, European Union and Australian Aid funded project implemented by Ministry of Environment and Energy on behalf of the Government of Maldives. This project will provide the basic infrastructure for management of waste at Fuvahmulah and ensure composting is undertaken at the island. Appropriate training will be provided to island level staff for this purpose. The main targets of the project include the following; ensure that target island has resolved its waste management issues, establish rules and regulations for waste management, reduce the waste produced and to use reusable materials, aggregate all waste that is produced and dispose-off properly, raise awareness of the community regarding the economic benefits of keeping the island clean and establish a mechanism to ensure that waste is managed appropriately through a proper collection system. The main components of the project include the following; establishment of waste collection system, upgrading of Island Waste Management Centre (IWMC), providing machinery for waste management and transportation of waste to Regional Waste Management Facility (RWMF). The construction phase of the project is expected to be completed within 06 months. The only activity that will be undertaken outside the footprint of the existing IWMC is clearing of vegetation at the project site. The area to be cleared is only sparsely vegetated and consist of one or two mature trees and few mature coconut palms. Impacts were assessed using rapid impact assessment matrix method and it was identified that the only foreseeable impacts of the project are related to vegetation clearance. Impacts related to construction can be easily mitigated by following good practices and the impacts of operational phase are primarily positive. Environmental Management Plan for Upgrading of IWMC at Fuvahmulah The environmental monitoring program proposed for this project, ensures that the mitigation measures are implemented and records are maintained in terms of social and environmental impacts of the project. The proposed grievance redress mechanism ensures that any public concerns as a result of the project are attended and addressed promptly. Overall, it is hoped that this will be a positive project that is beneficial to the community of Fuvahmulah.