Academic Articles -- ޢިލްމީ ލިޔުންތަކުގެ ޖަމާ
Browse
286 results
Search Results
Technical ReportItem Environmental impact assessment report for Hulhumale’ swimming area and land based facilities development project(2010-03) Land and Marine Environment Resources group Pvt LtdThe non technical summary outlines the findings of the Environmental Impact Assessment of the proposed development of swimming track and associated land based facilities. The proponent of the project is Housing Development Corporation Plc. The proposed project involves development of a swimming track and associated land based facilities at the eastern side of Hulhumale. The swimming tracks will be 20m by 25m. The total length of both tracks is 50m. The plate form and access jetty will be constructed using floats. Land based area includes, restaurants, kitchens, food outlets, toilets, changing facilities and park (including a small children’s park) A scoping meeting to discuss the development proposal and determine the Terms of Reference (TOR) for the EIA report was held between the Client (Housing Development Corporation Plc), LaMer Group Pvt Ltd as the EIA Consultant, Ministry of Housing, Transport and Environment (water and sanitation section of EPA) and representatives from Environment Protection Agency (EPA) as the Regulator on 23rd November 2009. Data collection or field was carried out during January 2010 for assessment of existing environment. Since the scope of work of the proposed project is small, existing environment data was limited to reef health, general wave, tide condition and seawater quality assessment. The water quality assessment done at the proposed swimming track area revealed alarming levels of Enterococci levels which was probably due to high number of users and disregard to general hygienic values (showering before entry to water). Also it has to be noted that an outfall pipe is location near the swimming track area and this may have some level of leakage (although close inspection showed none. Alternatives are given for location of swimming track area, since contamination of seawater is major social impact. Assessing alternatives the location identified by HDC Plc during consultation with HDC seems to be a better candidate as a location for swimming track. Mitigation measures are discussed for the construction and operational stage of the swimming track area only. Technical ReportItem Post-tsunami infrastructure rehabilitation project : rehabilitation of 6 selected harbors : social and environmental impact assessment for the rehabilitation of the harbor in Makunudhoo island, Haa Dhaal atoll(2007-11) SOGREAH Consultants; Water SolutionsThis report discusses the findings of a social and environmental impact study undertaken by Water Solutions Pvt. Ltd. and SOGREAH consultants of France upon request from Ministry of Construction and Public Infrastructure. The project involves the rehabilitation of the existing harbour in Makunudhoo, Haa Dhaal Atoll with improved infrastructures. This project is initiated by the government of Maldives with funding from Agence Française de Dévelopement” (AFD) as part of the Tsunami rehabilitation programme. The harbour of Makunudhoo has been damaged to various extents and requires repair and upgrading, including deepening the harbour basin, and increasing slightly the size. A detail assessment of the environmental and social conditions was assessed based on which a rehabilitation project has been proposed. This EIA has been prepared to assess the social and environmental impacts of this proposed rehabilitation project. Major environmental impacts of the project have been identified as resulting mainly from dredging and disposal of dredged materials. Dredging will be undertaken in the harbour basin and to some extent in the access channel. In view of the assessment, the environmental damages to marine resources have not been considered major due to the limited boundary of the project and also due to confined nature of the project. The impacts are likely to be felt on an estimated 5% of the lagoon and reef‐flat of that extensive reef system. These environmental impacts were assessed for both construction and operation phase of the project. Mitigation measures for these anticipated impacts have been identified and outlined in detail, including sedimentation control methods and other measures. These mitigation measures will have to be followed in order to minimize environmental damage. Stakeholder consultations were held with various groups, including the community and the client in order to incorporate the socio‐ economic components in the project. The proposed rehabilitation plans for Makunudhoo has been prepared after considering the needs and requirements from the community by assessing and incorporating the outcomes from the extensive community consultations held during the data collection stage. It is inevitable that there would be some negative environmental impacts, especially when dredging is undertaken. However, these minor negative impacts out weight the socioeconomic benefits gained by rehabilitating the harbour. As a result, a comprehensive monitoring component has been suggested which takes in to consideration, the most important elements that require regular checks. This monitoring component will be adhered and will allow the assessment of long term changes, despite the limited nature of the impact. The most important consideration is the socioeconomic impacts that have been assessed mainly as positive in nature. Not only they are positive, but most importantly in the long term. Therefore, it appears justified from a technical and from an environmental point of view, to carry out the proposed rehabilitation project if the island is to absorb the economic gains achieved by the project. Technical ReportItem Environmental impact assessment : for the removal of seagrass beach replenishment activities in Herathera Island Resort, Addu atoll, Maldives(2010-09) CDE ConsultingThe Herathera Island has been experiencing seaweed overgrowth for a number of years, even before construction began on the island. Similarly, the island does not have a natural beach system which is suitable for a resort product. An attempt was made in 2007 and 2008 to remedy these shortcomings by removing seagrass and undertaking beach replenishment. Unfortunately, the beach replenishment design and implementation was flawed and new seagrass colonies have started to emerge. The island is currently is a worse condition, particularly its beach system. These environmental issues are decreasing the economic value of the tourism product being offered Resort and is reaching a point where the product may be unviable. Immediate action is required to address these issues, thus, a new and improved beach replenishment and seagrass removal programme. The proposed project involves the removal of sea grass colonies and beach replenishment. Details of the proposed project components are outlined below. a) Sea grass removal The primary component of the project is seagrass removal. Seagrass areas covering approximately 200,000 – 250,000 m2 is proposed to be cleared (see Site plan in Appendix B), 100,000 m3 of dredge waste. TwoEIA for the proposed Seagrass Removal and Beach Replenishment Activities in Herathera Island Resort Prepared by: CDE Consultancy Page| ix methods have been proposed for the project: 1) using a sand pump; 2) using an excavator and; 3) soft measures. b) Beach Replenishment Beach replenishment has been considered as part of the project to mitigate the severe erosion on the island. The dredged waste from the sea grass removal activity, after cleaning and sorting, will be used to replenish the a 2900 m beach up to 10 m from the existing shore line. Additional sand will be dredged from borrow areas within the lagoon using sand pumps and excavators. Replenishment will be carried out using a three staged process. The first stage will collect and filter sediments on designated sites. The second stage will transfer the cleaned sediments to severe erosion zones using trucks. The final stage will profile the beach using fine sand. For the direct replenishment, sand will be pumped or transferred via barges to a designated location, where loaders and trucks and move the material. Technical ReportItem Initial environmental examination for a coral frame project(2010-07) Systems Engineering and Marine ConsultingThe potential environmental impacts of the development of a coral propagation project on the island of H.A. Manafaru are assessed. Manafaru is leased to Beach House Maldives and is operated by the Waldorf Astoria collection of the Hilton group. The assessment exposes the solutions and preferred alternatives as well as mitigation measures to minimize any negative impacts whilst trying to derive the maximum positive impacts from the project. Manafaru has very little coral cover after being degraded by the 1998 bleaching event. As it is important to be proactive in reef restoration, the resort management wishes to enhance the value of the island by propagating corals using the coral frame technique. The frames will be installed near the water villas and sparsely on the house reef. Coral fragments will be attached by a marine biologist and will develop into full colonies within a few years. Coral fragments from the house reef will provide a small number of fragments and will heal rapidly. Preference will be given to damaged colonies. 136 frames of 1m2 will be initially deployed, and after the first batch, the existing frames will provide fragments for transplantation. The project will start as soon as approval is granted, and as this is a long term project, it could span several years before completion. The island of Manafaru is located inside the northernmost atoll of the Maldives, and is subject to high winds and warming waters, which may be a cause of low coral survival. As the island is located in the middle of the atoll, the waves reaching its shores are diffraction of swells, and wind waves. As the energy encountered are of second magnitude, and the reef does not form a proper crest, the waves reach the island with less obstruction than most areas. Sand displacement depends on the predominant influence during different monsoons, forming a bulging beach rather than a sand tip. Technical ReportItem Environment impact assessment for the proposed construction of Island Waste Management Centre at Maabaidhoo, Laamu Atoll(2017-10) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to construct the Island Waste Management Centre (IWMC) in Maabaidhoo, Laamu Atoll. The proponent of this project is United Nations Development Programme (UNDP) The contractor for this project is Uni Maldives Private Limited. The main rationale for the project is to establish a sustainable waste management system in the island so that the waste is disposed and managed properly. The project is intended at constructing an island level waste management centre, with a compost ground and machineries and equipment to collect and to manage the waste. This project forms part of Low Emission and Climate Resilient Development (LECReD), a United Nations joint programme which seeks to mainstream LECReD issues into local development planning and service delivery for greater community-level ownership and sustainability of programme benefits. The proposed project involves the construction of the waste management centre. The IWMC will have a compost pit, waste segregation lots, equipment room, toilet, rainwater tank. This will be implemented as part of this project. The proposed IWMC will measure 89ft by 83ft and will be built at southern tip of the island. The proposed centre will be developed to manage the waste generated in the island and to ensure proper and sustainable disposal of waste. The waste management centre will also composting tools, compacting machineries to manage the waste. A truck of 1.5 tonnes and bins will be provided for waste collection. The duration of the construction of IWMC will take approximately 3 months. Once constructed, it will be handed over to the council for operation. The island community previously disposed waste at different locations of the island and the waste is not segregated. Following the efforts during the mangrove conservation project, all waste is now disposed to the location designated to build the IWMC under this project. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012 and Waste Management Regulations and Maldivian Land Act and Decentralisation Act. The existing condition of the island and the proposed IWMC was assessed for this report. Assessments conducted include groundwater quality assessments, and terrestrial assessments. Baseline noise levels were also recorded at the site. The assessment shows that during construction stage of IWMC, main impacts will be increased noise level, air quality degradation, loss terrestrial flora and fauna. The proposed location is a vegetated area where already most of the vegetation has been cleared. However, prior to construction few of the pioneer species will need to be cleared. Other impacts during construction stage possible contamination of groundwater and soil due to leakage of chemical and oil. During operational stage, the most significant impacts on the groundwater, greenhouse gas emission and on biodiversity. If the IWMC is poorly constructed including composting pit, likelihood leachate leaking into the ground is high and this may have irreversible impacts on groundwater quality. During operational stage, the IWMC may be receiving waste that cannot be managed at the site if unsupervised, this may result in open burning waste that result in the emission of toxic gases and chemicals which will degrade the air quality and cause GHG emission. Accumulation and mismanagement of waste also has the tendency to impact the biodiversity in the island whereby certain species are replaced by crows and rats, which will feed on waste stockpiles. The proposed is an aesthetically pleasing site and the visual amenity of the area will also be disrupted. Since the proposed site used to be a wetland, before it was reclaimed from waste, risk of flooding the area during swell tides or torrential rain is high. This may significantly impact the operation of the IWMC. Proper mitigation measures must be taken to reduce the risk of flooding. Overall this is an environmental improvement project.. Through composting and selling recyclable materials the project will also open up business opportunities for the island. In addition, irresponsible dumping and littering around the island may be stopped following the implementation of IWMC and waste management plan. The alternative options were evaluated for the no project option and alternative locations for IWMC. The “No Project” option is deemed infeasible, given the current condition of waste management and disposal in the island. Alternative locations for IWMC were also considered, however as there are no other apt locations in the island, it is proposed to go ahead with the proposed location, with stringent measures to mitigate flooding in the area. Monitoring plan is designed to assess any changes to the physical of the island, ground water quality as these are the key areas that will be impacted from this project. Monitoring costs is estimated at MVR 25,000 – 35,000 per annum. The management plan for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Stakeholder consultations were held with Maabaidhoo Island council, Maabaidhoo public, Laamu Atoll Council, Ministry of Environment and Energy, Ministry of Housing and Infrastructure and Environmental Protection Authority. Both Maabaidhoo Island Council and public are in favour of this project. In conclusion, this project has been designed in conformance to the relevant laws and regulations of Maldives. Operational stage impacts are mainly on climate change, groundwater contamination and on biodiversity. Overall, the project will have positive impacts to the island community under supervised and effective management of the IWMC. . The EIA recommends to go ahead with the project and to develop the IWMC and to follow the mitigation measures to avoid significant impacts. Stringent mitigation measures must be taken to reduce the risk of flooding at the proposed location. It is strongly recommended to develop and implement an environmental management plan to maximise the benefits of IWMC and ensure sustainability of operations. Technical ReportItem Environmental impact assessment for the proposed development of an agricultural island Dhurureha Thaa Atoll, Maldives(2017-09) SandcaysThis report discusses the findings of a social and environmental impact study under the proposed development of agriculture on Dhururehaa, Thaa Atoll. The project is proposed by Mohamed Latheef. The proponent aims at developing Dhurureha as an agricultural island; providing job opportunities, reducing dependency on imported produce and ultimately working towards economic diversification and growth of Maldivian economy. The agricultural activities on Dhurureha will be carried out in greenhouses as a hydroponics system. A total of 12 greenhouses (100ft by 50ft each) is proposed to be built for growing tomato, capsicum, bell pepper and lettuce. Additionally, a 60m by 30m nursery will be built on the island. Access to the island is to be provided by dredging an access channel and a 200m jetty. Water requirement for the project is to be met by utilizing an RO plant. A suitable size diesel generator will be used throughout the project to meet power requirement. Staff facilities such as accommodation, mesh room, mosque and office building will also be constructed on the island. A cold storage, general storage and small packaging facility will also be constructed on the island during construction stage. A waste collection and management station will be established for using during construction phase and operational phase of the project At present, Dhurureha is an uninhabited island not used for any purpose. However, locals of the nearby communities use the island to collect coconuts, go on picnics and gather firewood. Alternatives to project components have been identified in the project document. These include alternative uses of the island such as for a tourist resort. However, upon closer analysis of these options, the proposed development of the island for agricultural purpose was found to be more viable based on the present circumstances under which the island has been leased. Therefore, the consultants propose exploring use of alternative renewable sources to the proposed fuel based energy generation. Environmental impacts were assessed for both the construction and operation phase of the project. Most of the environmental impacts of the project have been identified as minor negative with highly positive socio-economic impacts. The main negative impacts from the project include habitat loss from vegetation clearance, sedimentation and consequent impacts on marine wildlife health and waste generation during the operational phase. The mitigation measures outlined for these impacts include conserving mature trees to the greatest possible extent, relocating large live corals at the proposed access channel area and establishing dust control plans in addition to employing best-practice guidelines during the operational phase. The most positive socio-economic impacts related to the project are increase in job opportunities, reduction in prices of agricultural produce and increase of national revenue. It is inevitable that there would be some negative environmental impacts. However, most of the impacts of the proposed project are minor compared to the positive socio-economic benefits of the proposed system. Yet, monitoring to ensure the effectiveness of the proposed project would be necessary. Therefore, a monitoring component has been suggested which takes in to consideration, the most important elements that require regular checks. This monitoring component will be adhered to and will allow the assessment of changes due to construction and implementation of the proposed agriculture project. Monitoring is specifically focussed on employment opportunities, price changes in the market, direct and indirect economic ventures, ground and marine water quality, changes in the hydrodynamics of the project area as well as impacts on the reef or marine ecological area of importance. In conclusion, it appears justified from a technical and environmental point of view, to carry out the proposed project to develop Dhurureha as an agricultural island. Technical ReportItem Environmental management plan for the proposed development of Island Waste Management Center in TH. Vandhoo(2017-09) Zuhair, Ahmed HassaanThe proposed development of Island Waste Management Center (IWMC) in Th Vandhoo is funded by the Public Sector Investment Program (PSIP) of the Government of Maldives. The aim of this project is to alleviate current waste management problems endured by the island community and thereby improve the overall environmental and public health condition of the island. The proposed IWMC will be developed in a 500 square meters’ area located in the South East side of the island. This site is at a considerable distance away from the residential population and vegetation line and meets the land allocation criteria of both Maldives Land and Survey Authority (MLSA) and Environmental Protection Agency (EPA). At present, no major vegetation exists in the site except some scrubs. However, according to the information provided by the Island Council, 7 mature coconut palms and 3 mature trees (Alexandrian laurel) were previously present at the site. The Island Council has been undertaking land clearance works since 2015, as the site has been identified by the council to develop IWMC in 2015. An EPA declared environmentally sensitive mangrove area exists in the north western side of the island. However, this area is 400 meters away from the proposed IWMC and therefore, no negative impacts to this area are envisaged to occur as a result of the project. The project will provide basic infrastructure necessary to manage waste at island level and ensure composting is undertaken in the island. After completion of civil works, the IWMC will be operated by the Island Council in accordance to the Island Waste Management Plan. Training on composting for island level staffs and machinery such as, shredders, wood chippers and bottle crushers will be provided to facilitate adequate functioning of the IWMC. Waste that is not manageable at the island level will be stored and regularly transferred to a regional waste management facility (RWMF). All civil works of the project are expected to be completed within 6 months. Environmental impacts of the project were evaluated using the Rapid Impact Assessment Method (RIAM). Majority of the impacts envisaged for the project are highly positive. The project is expected to bring numerous economic benefits to the island community, in additional to the perceivable environmental and public health related benefits. The only permanent negative impact likely to occur as a result of the project is related to the removal of vegetation. However, the amount of vegetation clearance involved is minimal and therefore, if the mitigation measures proposed in this management plan are adhered, almost all the negative impacts can be brought to an acceptable level. The monitoring program proposed in the EMP will ensure the implementation of the mitigation measures and assist in the identification of unforeseen impacts throughout the project. Overall, the project is expected to provide significant socio-economic and environmental benefits for the local community. Technical ReportItem Environmental impact assessment proposed milkfish aquaculture project Matu, Gaafu Alif Atoll(2017-07) SandcaysThis report addresses the environmental concerns of the proposed milkfish (Chanos chanos) hatchery project in Ga. Matu. The project is proposed by Ministry of Fisheries and Agriculture. Concerns about live-bait availability over prolonged periods are being raised in recent years, especially in the southern atolls of Maldives. The development of aquaculture for selected bait species is seen as one possible measure to manage the live bait shortage currently faced by local fishermen. Cultured milkfish has been in use for the longlining industry in different parts of the world, and successfully piloted for the pole-and-line industry in Indonesia and Kiribati. Unlike most of the live bait species currently in use in the pole-and-line fishery, hatchery technology is well developed for milkfish. In addition, the relatively short duration to reach bait-size makes milkfish an ideal species for aquaculture development. Supplementing the tuna fishermen with cultured bait is expected to reduce the time spent on bait search, and in turn, result in increased effort directed to the tuna fishery. As live bait shortage is mostly reported from the southern atolls, the proposed hatchery site was selected from Gaafu Alif atoll, for logistical ease in distribution for the most needed areas can be made. The selected island, Matu from Ga. Atoll is 5.9 Ha small uninhabited island on the northern side of Ga.Atoll. The closest inhabited islands to the project site are Ga. Villingili and Kolamaafushi. The project aims to produce 100 tons of milkfish raised to the size of live bait used in the pole-and-line fishery. All required technical and support infrastructure will be constructed during the construction phase of the project. The operational phase will involve water circulation, feeding and rearing of cultured stock. In addition to hatchery, nursery and broodstock modules built on land, sea cages will be built for brood stock. Power will be provided for the project via diesel generators, while potable water will be provided via RO plants. Accommodation for staff and administrative buildings and waste management centre will also be constructed on the island. Access to the island will be provided via access channel and a jetty. The naturally deep lagoon will be used as a harbour during the project. Social and environmental concerns regarding the proposed project include: • Vegetation clearance during site preparation for construction of land infrastructures. This impact is considered minor negative as outmost care will be taken to reduce cutting down mature vegetation. Buildings will be adjusted as much as possible to reduce requirement of cutting or relocation of mature trees. When unavoidable, two plants for every tree cut will be planted on the island. • Sedimentation during excavation of access channel and construction of main jetty. This impact is considered as negligible as the excavation involved is very minor. Measures to reduce this impact such as working during calm weather and low-tide has been suggested as mitigation measures. • Minor impacts due to human activity in the area including littering both during construction and operational phases. • Increased nutrient loadings from faeces and uneaten food wastes, which will either dissolve or settle on the seabed beneath the cage. Since the water is deep and adequate currents exist, eutrophication is, however, unlikely. The proposed project is expected to be managed in conformity with local and international regulations and standards of relevance, especially environmental regulations and standards. Therefore, environmental impacts will be well managed, minimized and mitigated. Given that the project has major socio-economic benefits and some environmental benefits (potential to reduce pressure on wild populations of baitfish), it is recommended to allow the project to proceed as proposed. It is important to consider uncertainties and continue to monitor the project impacts and undertake appropriate mitigation measures in consultation with the EPA and other relevant government agencies. It is also necessary to undertake regular environmental monitoring activities. Technical ReportItem Environmental impact assessment proposed 13 storey building construction at M. Dhimyaath, Male’(2017-09) Jameel, Ahmed; Mohamed, HamdhoonThis report is based on the proposed 13 storey building construction at the residence, M. Dhimyaath in the capital city, Male’. The project is being developed and constructed by Dr. Mohamed Muizzu. He will be undertaking the construction works and project management including overseeing the EIA process. An Environmental Impact Assessment was necessary for the works outlined in this report as they fall under ‘Jadhuvalu R’ of the Environmental Impact Assessment Regulations 2012 of the Maldives. In addition to meeting the regulatory requirements, the report would further assist the proponent and important stakeholders to make decisions based on favorable environmental conditions with the main focus on sustainability. The project also adheres to several other rules and regulations in the Maldives and has obtained permit from the Ministry of Housing and Infrastructure to proceed. The area the project is proposed to be undertaken is a moderately built area in the heart of Male’, more towards the south western side. There is no natural terrestrial environment at site. The existing environment therefore was focused on the regional climate of Male’, and the traffic distribution, and noise pollution in the area. As could be seen from the data, this area does not encourage much traffic relative to the busier roads in Male’. There were several existing construction sites in the neighborhood. A general exterior overview of the existing structures in the area was also observed. It was found that most of the buildings in the area were in good condition. Older buildings were mostly single storey structures. Therefore, serious structural defects are expected to be at a minimum. However, the report recommends to undertake a structural defects inspection study of the buildings in the same block as the proposed site by civil engineering experts. The overall environmental impacts of the project have been assessed using frameworks found in literature. Since the development is undertaken in a moderately built area, the results indicate that the proposed project has neutral impact. However, there are some significant impacts on the environment during the construction phase of the project and these needs to be mitigated to avoid any significant damage to the environment. Significance of the impacts and mitigation measures have been provided based on previous similar projects undertaken in the Maldivian environment and based on literature. The main cause for concern regarding this project is the impact it will have on neighbours residing in this area. As such, several short-term impacts are envisaged including air pollution, noise pollution, aesthetic impacts, and safety concerns. As there are numerous high storey building projects being undertaken in Male’, there is no particular long term impact associated with this project. One significant impact specific to this project is the cumulative impact on the neighbourhood due to the sheer no. of construction projects that are simultaneously undertaken in the area. The impacts that do occur however can be easily mitigated to minimise and/or completely nullify them. The first mitigation measure proposed includes creating awareness among the construction staff and neighbours regarding the scope of the project. Other measures include properly demarcating the area, putting up dust screens, and taking other protective measures to ensure people residing and utilising the vicinity will not have to endure the impacts during the construction stage. Foundation protection measures are recommended and are provided as part of the project to prevent impact on neighbouring structures. Dewatering procedure also needs to be undertaken with care, details of which are given in the report. During the operation stage of the project, parking and waste management are issues of note. Alternatives, including the no project option and alternatives for some project components are also discussed. Regarding project design, a few alternatives are recommended such as providing a green area at the terrace, while the pros and cons of making a larger parking area is also discussed. An environmental monitoring program is provided at the end of the report, which provides details on the parameters to monitor on site, and the frequency in which it needs to be done. Estimated costs for the monitoring works are given. Implementation of the program is essential for the sustainable development of the project. In conclusion, it is discussed the impact such major housing projects have for the increasing population density in Male’, and how it can be prevented at a policy level. However, taking this project as a standalone development project in an already heavily built island city, it can be concluded that no significant long-term impacts are predicted. Therefore, it is recommended that the project go ahead as proposed with precautions and mitigation measures in place. Technical ReportItem Addendum 1 for environmental impact assessment of Hulhule-Hulhumale connecting link road development project in North Male‟, Atoll(2017-09) Water SolutionsThis report discusses the findings for the first addendum of the environmental impact assessment undertaken by Water Solutions Pvt. Ltd for undertaking the construction of the link road project between Hulhule-Hulhumale.. The project is proposed by Housing Development Corporation (HDC). The island of Hulhumale has been an important growth centre since its development. Presently, Hulhumale is the fastest growing urban centre and has residential as well as industrial developments to a scale that has never been experienced anywhere in the Maldives. Being close to Male‟ and the airport, Hulhumale has been attracting migrants from all over the Maldives. Construction of the Male‟ to Hulhule Bridge is presently the biggest infrastructure project of its kind under construction in Maldives. This project is very much tied with the present link road as this link road will provide direct connection of Hullhumale and the bridge, ultimately making the traffic flow from Hulhumale to Male‟. This road will be constructed on the east side of the existing land mass of Hulhule airport by reclaiming a small area further west of the existing island. The proposed road will consists of three zones. The details of the link road project is given in the Environmental Impact Assessment Report which is prepared by Water Solutions in August 2017 and the reason for the preparation of this first addendum report is due the change in location of sand burrow areas. In the Environmental Impact Assessment Report it was said that the sand will be obtained from the Hulhumale‟ phase 2, phase 1 and Maldives Airports Company Limited (MACL). However now that idea has been dropped out and it is now planned to obtain sand from the eastern side of Uthuru Thila Falhu and the bathymetry shows the depth varies between 40 to 60 meters approximately. The details of the geographic coordinates are given in the section project descriptions and Study Area. This lagoon has been used as a sand burrow area for previous similar projects and is estimated to dredge 410,000 cubic meters of sand from this location. The dredging project is subcontracted to the Dredging International (Cyprus) and it is estimated to complete the project in five to seven days. Environmental impacts were assessed and most of the environmental impacts of the project have been identified as resulting mainly from the coral reef damage caused by reclamation of additional land. Mitigation measures for the negative impacts have been identified and outlined in detail, especially sedimentation control methods. The most important mitigation measure is the use of bund walls in the fill areas. This EIA addendum was undertaken to assess the environmental impacts of the proposed dredging and reclamation to acquire more land for the link road construction project. Based on the assessment, it has been identified that the major impacts of the project will be felt on the marine environment during the dredging and discharging of sand. This EIA addendum report also highlights some of the studies and research work undertaken in similar environments, especially in Male‟، to understand the impacts of reclamation and construction works close to reef slope and how this knowledge can be transferred to similar environments based on the type of coastal protection methods in use. The mitigation measures are provided in the report with alternatives. It is vital to conduct the activities, during both project planning and construction phase, in line with mitigation measures emphasized in the report. Socio-economic impacts of the proposed project will be immense as direct land connection of Male‟ and Hulhumale would bring significant benefits to the general public. Connection of Hulhumale, Male‟ and the airport is a vital transportation link that would save time and money for more than 200,000 people residing in the greater Male‟ region. The environmental impacts of various projects that are currently being undertaken in the airport region have caused significant damage to reef in various areas. This project will also have its impacts, but the impacts will not be anything greater than to what the environment has already been subjected to. Therefore a comprehensive monitoring programme has been suggested which covers components of coastal and marine environment to assess how the critical components of this project will affect the environment and to what extent. It is important to follow this monitoring programme not only to comply with the regulation but also to ensure that the impacts are measures in realistic terms. Though some of the components of this project contravenes with the Dredging and reclamation regulation; the amendments brought to the regulation facilitates that this project could be implemented. Hulhule island is a special zone and Under clause 10 of the dredging and reclamation regulation, special projects are exempted. As the environmental consultants, it is our opinion that this project should be allowed to proceed as the environmental impacts of this project does not pose serious concerns to the natural environment. It is a project that has far greater socio-economic benefits than these limited environmental impacts.