Academic Articles -- ޢިލްމީ ލިޔުންތަކުގެ ޖަމާ
Browse
9 results
Search Results
Technical ReportItem First addendum to the environment impact assessment prepared for the proposed development of 7,000 social housing units at Hulhumale’ phase II(2016-12) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency to construct a temporary jetty at Hulhumale’ phase II. This jetty is required for the transportation of construction goods, equipment and machineries for the development of 7,000 social housing units at Hulhumale’ Phase II. EPA has approved the original EIA for the proposed development of social housing units on 22 September 2016. This addendum is required for the construction of the jetty. The proponent of this project is China State Construction Engineering Limited (CSCEC). The rationale for the proposed construction of the jetty is to facilitate the transportation of the construction goods and machineries to the project site. The project to develop 7,000 social housing units requires large-scale machineries, equipment and high quantities of construction materials, which will need to transported in bulk to the project site. Hence, the proponent has decided to construct a temporary jetty, which will have the capacity to moor a 5,000DWT vessel. The contractor for this project is CSCEC Limited and it is financed through bank loans. For the purpose of this project, HDC has allocated an area of 3,204.20 sqm for temporary loading and unloading of materials towards the western side of Hulhumale’ Phase II. HDC has also given permission to the proponent for the construction of the jetty. The project proposes to construct a jetty that will be divided into two parts. The first part will be allocated for wharf operation area (40 m wide) and the other part for temporary transfer stacking yard. The project will involve excavation to a depth of 3 m. During this process, 1,385 m3 of sand will be dredged that will be used for backfilling at the end of the jetty. The surface of the jetty will be backfilled with sand and the sides will be protected using sand bags. In addition, 30 cm thick packaged concrete will be laid as toe protection for the foundation bed. Project duration is estimated to be 2 months. The key laws and regulations applicable to this project are: Environmental Protection and Preservation Act, Environmental Impact Assessment Regulation 2012, sand and coral mining regulation and Dredging and Reclamation Regulation. In addition, this project requires approval from HDC. The existing environment of the project was assessed for the purpose of this addendum. Assessments conducted include marine water quality and marine assessment. Marine assessment showed that no significant fish life or coral colonies occur at the site. The area is mostly made up of a sandy bottom covered in thick patches of algae. Marine water quality assessment showed that water is turbid. Significant impacts of this project during construction phase of the project are the potential impact of greenhouse gas emissions, marine water turbidity during dredging and impact on groundwater and soil condition due to oil spillages and accidental leakages. There are cumulative impacts on the site due to recent extensive land reclamation in the area. The reef, water quality and shoreline has already been extensive modified. The main mitigation measures include carrying out construction activities during low tide hours and calm weather, carrying out the work in the shortest time frame possible. Mitigation measures also include, storing oil and chemicals in sealed containers, and training workers in spill prevention and cleanup, and designate responsible individuals. The “No Project” option was explored for this project. However given the importance of this project for the overall project, the plan is to go ahead with the project. The monitoring plan is designed to assess impacts to the marine environment and impacts to groundwater quality. The cost of monitoring is estimated to be between USD 1,000 and USD 2,000 per annum. The management plan for this project has been updated to include the key management requirements during construction of jetty. Stakeholders consulted for this project include, Environmental Protection Agency and Housing Development Corporation. EPA advised to undertake appropriate mitigation measures to prevent sedimentation. HDC emphasised to not use the temporary area given for the project for storing materials. They also advised to keep the vessels moving in the area to avoid traffic since the area has other jetties in operation. Both stakeholders highlighted that the jetty must be demobilized once the overall project is complete. The main conclusion of this report is to proceed with the project but after incorporating the mitigation measures proposed in this addendum. Safety during construction must be a priority. Technical ReportItem Environment impact assessment for the development of 7,000 social housing units in Hulhumale’ phase II(2016-09) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency (EPA) to implement the proposed development of 7,000 social housing units in Hulhumale’ Phase II. The proponent of the project is China State Construction Engineering Corporation Limited (CSCEC). The project is designed to achieve the housing development goals of the Government and under the effort to develop Hulhumale’ into a youth village. The project forms part of an umbrella effort to establish 15,000 social housing units in Hulhumale’ Phase II. These housing units will be specifically targeted for families. This project will be among the first developments in Hulhumale’ Phase II. This project is also the first high rise residential building of more than 14- storeys in the Maldives. The project involves constructing 16 buildings over 7 plots. Each building will have 25-storeys and the total area allocated for the project is 35,604 sqm. Out of the 16 buildings, 10 buildings will have 16 apartments on every floor and the remaining 6 buildings will have 20 apartments on every floor. A total of 7,000 residential units will be developed. Each building will consist of two bedroom apartments units, parking space and waste collection point in the ground floor. The target population is estimated between 21,000 to 28,000 persons at 3 to 4 persons per apartment. The target population for these flats is low to low-middle income Maldivians. Each apartment will have an area of approximately 50.53 sqm and it consists of two bedrooms, living room and kitchen, two toilets and balcony. Parking space is design to accommodate two motorbikes per apartment. The building will be complete with outdoor fire hydrant systems, two escape stairs, fire elevators and fire alarm systems. All utilities during operation will be provided by state owned services. The proposed project covers: mobilisation, construction of worker’s accommodation blocks, excavation and dewatering, foundation and concrete works, mechanical and electrical works, exterior and electrical works.. The project is estimated to take 24 months to complete. The proposed designs and plans are also generally in conformance to the laws and regulations of the Maldives. Additional approvals are required for the following before commencement of project activities. They are detailed drawings approval from the HDC; dewatering application and approval before commencement of any dewatering activities; connections to sewer systems; water connections; power connections and approvals to use the building for housing and approval from civil aviation authority. The project will be implemented on the newly reclaimed area in Hulhumale’ Phase II located on the south eastern rim of North Male’ Atoll which has been developed as an extension of Hulhumale’ Phase I. The proposed housing development site is located towards the north eastern side in Phase II. Seven plots has been allocated for this project with a total area of 35,604 sq.m. The existing environment was assessed for the purpose of this EIA. Baseline assessments include groundwater and marine water quality assessments, soil profiling, noise measurements and marine assessment. The groundwater quality of the site was found to be good except with elevated levels of turbidity. Marine assessment showed mainly dead corals and white sand in the area. During construction stage, the project is expected to incur minimal impacts on the environment, as the area is a vacant land. Minor impacts are anticipated on groundwater and soil condition, marine water quality due to oil spillages and through disposal of residual water after dewatering. Impact on air quality and greenhouse gas emissions is anticipated to be moderate as a significant number of generators will be used. During operational stage, the proposed developments involve significant positive impacts on the socio-economic environment. These are associated with the increased supply of housing to those in need and reduce the level of congestion in Male’. This will also benefit the economically disadvantaged by providing easy access to affordable and improved housing units. The project will involve the settlement of a large number of populations, which will exert pressure on existing utility service centres, schools and hospitals. It is anticipated that the demand for parking space and traffic flow in Hulhumale’ will also increase following this development. Risk of fire and criminal activities are also anticipated negative impacts associated with this project Mitigation measures are recommended for potential significant impacts during operational and construction stage. It is recommended to design and develop the building with adequate measures for fire prevention and to ease evacuation during a fire. It is also recommended to establish a community police nearby the building to maintain peace in the area and develop a master transportation plan to cater the demand for parking space in the future. Alternative options were evaluated for the activities that are identified to have significant impacts on the project. These include the ‘No Project’ alternative, alternative dewatering outfall locations, alternative location, alternative use of the building and alternative location for concrete batching plant. Alternatives for height of the buildings were also assessed in the report. It has been recommended to follow the proposed plan for the development. However, location of batching plant will have to be changed as per requirements by HDC. Consultations were held with all relevant stakeholders including, EPA, Housing Development Cooperation, MWSC, STELCO, Civil Aviation Authority, Waste Management Corporation, National Disaster Management Centre, MNDF Fire and Rescue Service, Transport Authority, Maldives Police Service and Ministry of Environment and Energy. The regulatory authorities asked to follow the existing regulations and guidelines in the design and construction of buildings. Attempts to consult Ministry of Housing and Infrastructure have been unsuccessful. The ministry was unable to confirm a meeting before the submission of the EIA report. In addition, a general public survey was also conducted for this EIA to seek the views of the public towards the project. In general the public was very positive towards the project but some raised concerns over corruption and unfair allocation of plots during operation. The Environmental Management Plan (EMP) for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition, provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Monitoring plan is designed to assess any changes to the physical environment as well as human environment. The total cost of mitigation and monitoring are estimated between USD 10,000 annually. The main conclusion of this report is to proceed with the project but after incorporating the mitigation measures proposed in this report. Safety during construction must be a priority. Technical ReportItem Environment impact assessment for the development of N3-56 and N3-57 plot under the proposed 3,000 housing units project at Hulhumale’, Kaafu Atoll(2016-05) CDE ConsultingThe purpose of this document is to fulfil the requirements to get necessary environmental clearance from the Environmental Protection Agency (EPA) to implement the proposed development of Hulhumale’ Plot N3-56 and N-57 under the 3,000 housing unit construction project. The overall project comprises of three plots (N3-55, N3-56 and N-3-57). An EIA has already been prepared and approved for N3-55. The original EIA application had all three plots together but since the concept approval was only available for N3-55 decision was taken in the scoping meeting to submit N-56 and N-57 later. This EIA is prepared for the remaining two plots. The project is designed to achieve the housing development goals of the Government and to expand the settlement in Hulhumale’ Island. The proponent of this project is Sea Life Global Inc Private Limited who owns the right to develop the plot. The main rationales for the project are to cater for the shortage of housing in Male’ Urban Region and to relieve the congestion in Male’. The project at N3-56 and N-57 involves constructing three 13-storey buildings or towers. A total of 506 residential units are planned to for a target population between 800 to 1000 persons at 4 to 6 persons per household. The bottom three floors will be used for commercial purposes while the rest will be developed for housing. A combination of one bedroom, two bedroom, three bedroom, four bedroom and penthouse apartment units will be developed in each tower. In addition to the apartment units, each floor will offer auxiliary space including corridors, stairs, lifts, lobby and service stores. Commercial zone of each block has 4 retail stores, fire control room, transformer room, service stores and waste management stores. Parking is provide on the ground floor behind the commercial zone. All utilities will be provided by existing state-owned service providers. The proposed project covers: demolition and site clearance; concreting works; interior, mechanical, exterior and electrical works; finishing, and; building operations. The project is estimated to take 30 months to complete. The proposed designs and plans are also generally in conformance to the laws and regulations of the Maldives. Additional approvals are required for the following before commencement of project activities. They are detailed drawings approval from the HDC; dewatering application and approval before commencement of any dewatering activities; connections to sewer systems; water connections; power connections and approvals to use the building for housing. The proposed site is located near the existing flats around the central part of Hulhumale. Plot N3-56 covers a total area of 6,631.69 sqm (~71,000 sq ft) and plot N3-57 covers a total area of 6,935.64 sqm ( ~ 74,000). There are some trees planted on both plots, which needs to be cleared for construction. All these trees will have to cut down or trees of significance were identified on the site. There are existing flats, a school and a mosque within the vicinity of the plot. There are also construction project within the vicinity including the proposed tertiary hospital in Hulhumale. The street facing east of the project site has moderate high traffic due to the presence of flats. The rest of the streets around it have moderately low traffic. The assessment shows that the proposed developments involve significant positive impacts on the socio-economic environment. These are associated with the increased supply of housing to those in need, growth of Hulhumale Island and economic benefits to the proponent. The negative impacts are moderately small as this is reclaimed land with barely minimal biodiversity. Most impacts are associated with dewatering, health and safety, noise, vibration and dust. A focus has been placed on minimising impacts on ground water due to over-extraction, contamination from accidental spills and leakages. Operational stage impacts are mainly beneficial impacts as well. Negative impacts are those associated with the increase population and related pressures on resources and utilities, traffic congestion and criminal activities, among others. Alternative options were evaluated for the activities that are identified to have significant impacts on the project. These include the options alternative foundation methods and alternative dewatering outfall location. The proposed options were preferred over the alternatives. Consultations were held with all relevant stakeholders including Ministry of Housing, EPA, Housing Development Cooperation, MWSC, STELCO and members of the public. In general there was strong support of the project. The regulatory authorities asked to follow the existing regulations and guidelines the design and construction of buildings particularly in relation to utilities, waste management and dewatering. EPA also asked to undertake geo-technical investigations before construction. The public was very positive towards the project but some raised concerns over corruption and unfair allocation of plots during operation. The Environmental Management Plan (EMP) for this project is designed to produce a framework for anticipated impacts, including practicable and achievable performance requirements and systems for monitoring, reporting and implementing corrective actions. In addition, provide evidence of compliance to legislation, policies, guidelines and requirements of relevant authorities. Monitoring plan is designed to assess any changes to the physical environment as well as human environment. The total cost of mitigation and monitoring are estimated between Rf 25,000 annually. The main conclusion of this report is to proceed with the project but after incorporating the mitigation measures proposed in this report. Safety during construction must be a priority. Technical ReportItem Environmental impact assessment for the proposed Blue’s 300 apartments at Hulhumalé(2014-08) Water SolutionsEIA report has been prepared to assess the environmental and social impacts of constructing 300 housing units at Hulhumalé of Kaafu Atoll. This project will be implemented by Noomadi Resort & Residences Anstalt for Maldives Police Services. The land areas identified for the housing project has no major tree and hence there will be no tree clearing as part of the project. The project is part of the Government commitment to provide affordable housing to people of the Maldives. The project aims to build 300 housing units which can accommodate 300 families of Maldives Police Service. All activities of the project will be closely monitored by site supervisors to be identified by Noomadi Resort & Residences Anstalt. This is mainly to avoid any environment and social issues. A close relationship and open communication need to be established to avoid any future disagreements and social issues during execution of the project work with the Hulhumalé community. The most significant impacts of the project will be resulting from the construction waste that would be generated as part of the project. As a mitigation measures, construction waste would be managed in accordance with the waste management guidelines issued by Environmental Protection Agency. The construction waste generated at the island would be collected and temporarily stored at designated area. The collected waste then will be transported to Thilafushi for final disposal. This report will highlight major findings and predicted impacts of the proposed housing project. The report is developed in consultation with project proponent and in accordance with Environmental Impact Assessment Regulation. An environmental management plan with environmental monitoring has been developed including the most important elements that require regular checks. This monitoring component need to adhered to and would allow to assess the changes due to the implementation of the project. Although the project involves inevitable negative environmental impacts, such impacts are predicted to be not severe as to not undertake the project in accordance with the master plan. The project is justifiable in light of the socio-economic conditions and anticipated benefits resulting from the project, which seem to outweigh the negative environmental impacts. Technical ReportItem Environmental impact assessment for the proposed SIFCO apartments at Hulhumalé(2014-11) Water SolutionsThis EIA report has been prepared to assess the environmental and social impacts of constructing 300 housing units at Hulhumalé of Kaafu Atoll. This project will be implemented by NOOMADI Resorts and Residences Anstalt for Maldives National Defence Force. This report highlighted major findings and predicted impacts of the proposed housing project. The report is developed in consultation with project proponent and in accordance with Environmental Impact Assessment Regulation 2012 and Environmental Protection Agency. The land areas identified for the housing project has no major tree and hence there will be no tree clearing as part of the project. The project is part of the Government commitment to provide affordable housing to people of the Maldives. The project aims to build 300 housing units which can accommodate 300 families of Maldives National Defence Force. Under this project have two bed rooms and three bed rooms would be developed. The project would be implemented at Lot No: 11490, 11491 and 11492. The total plot area for the developed is 4,922.22 m2. The total area that would be allocated for the residential use would be 44,989.32 m2 and commercial use would be 3,819.43 m2. All activities of the project will be closely monitored by site supervisors to be identified by Noomadi Resorts and Residences Anstalt. This is mainly to avoid any environment and social issues. A close relationship and open communication need to be established to avoid any future disagreements and social issues during execution of the project work with the Hulhumalé community. The most significant impacts of the project will be resulting from the construction waste that would be generated as part of the project. As a mitigation measures, construction waste need be managed in accordance with the waste management guidelines issued by Environmental Protection Agency. The construction waste generated at the island would be collected and temporarily stored at designated area. The collected waste then will be transported to Thilafushi for final disposal by the contractor. An environmental management plan with environmental monitoring has been developed including the most important elements that require regular checks. This monitoring component need to be adhered and would allow to assess the changes due to the implementation of the project. Although the project involves inevitable negative environmental impacts, such impacts are predicted to be not severe as not to undertake the project in accordance with the Hulhumale development master plan. The project is justifiable in light of the socio-economic conditions and anticipated benefits resulting from the project, which seem to outweigh the negative environmental impacts. Technical ReportItem Initial environmental examination for the development of 11 story building of 90 housing units and associated commercial units at M. Wayside(2011-10) Mohamed, MiruzaThis Initial Environment Examination is an evaluation of the potential environmental, soci-economic and natural impacts for the development of an 11 storey building at M. Wayside. This Initial Environmental Examination is prepared in order to meet the requirements of Clause 5 of the Environmental Protection and Preservation Act of the Maldives to assess the impacts of proposed development at M. Wayside, Male’. The report has looked at the justifications for undertaking the proposed project components. Alternatives to proposed components or activities in terms of location, design and environmental considerations were suggested. A mitigation plan and monitoring programme before, during and after the works has also been proposed. It is inevitable that there would be some negative environmental impacts, especially when excavation and dewatering is carried out. The potential adverse impacts from the overall project includes water contamination, shortage of groundwater, generation of waste, air pollution, noise pollution and disruption to traffic and unavailability of parking space. After a survey and the study undertaken for this IEE, these negative impacts identified are not severe enough to not allow the project. In light of possible impacts assessed, a comprehensive monitoring component has been suggested to monitor environmental (natural and social) impact during the course of this project. This monitoring component will be adhered and will allow the assessment of long term changes, despite the limited nature of the impact. In addition, the socioeconomic impacts that have been assessed have been identified as mostly positive impacts, not just in short term but also in long term. Therefore, from an environmental and technical point of view and in light of the existing socio-economic developments it appears justifiable to carry out the proposed project. Technical ReportItem Environmental impact assessment for the development of 11 storey building in Block 58, H. Naadhee(2012-03) ReefTAC Maldives Technical ReportItem Environmental impact assessment for development of 80 housing units at Goidhoo, Baa Atoll, Maldives(2011-12) Shareef, Ali; Mohamed, MiruzaThis Environment Impact Assessment is an evaluation of the potential environmental, socieconomic and natural impacts for the development of 80 housing units at Goidhoo, Baa Atoll. This EIA is prepared in order to meet the requirements of Clause 5 of the Environmental Protection and Preservation Act of the Maldives to assess the impacts of proposed development at B. Goidhoo. The primary objective of the project is part of the Government commitment to provide affordable housing to all the people of the Maldives. The total area of the development is approximately 184,800 square feets (17,168 sqm) and the size of a housing plot is 1707 square feets. Each housing unit would consist of 3‐4 bedrooms, a sitting room, dining room, 2 toilets, laundry and a small backyard and a well to provide water for domestic use. This report as considered the impacts the project could have on the environment. It is found that a major impact would be due to the waste produced during construction. However, the impact would only be for the project duration and mitigation measures for this and other impacts are also provided. Another high impact is anticipated on the social environment. If the progress of any delays could be shared with the public, this impact could be minimized. Improvement in the local economy of the island and improved livelihood are seen as positive benefits of the project. Technical ReportItem Environmental & social impact assessment for the proposed construction of housing units at Nolhivaranfaru, Haa Dhaalu Atoll, Maldives(2011-03) Water Solutions• This EIA report is prepared for the construction of 100 houses in Nolhivaranfaru island of Haa Dhaalu Atoll. The project will be implemented with assistance received from the Chineese government. • The assessment reveals that the major impact of the project would be the loss of natural habitat or loss of vegetation from the proposed housing area. This impact is unavoidable as trees have to be cleared from the site before construction can begin. • Therefore, the most significant direct impacts are going to be resulting from the loss of flora and fauna from this area. • The proposed area for the construction of 100 houses has already been cleared in 2008 for a similar housing project that was undertaken then. During that time, this project was also foreseen and hence, the land was cleared so that no future land clearing would be required for this project. • However, since then, the cleared land has been populated with weeds and wild trees but nothing of significant in nature. All coconut trees and other significant mature trees in this area were compensated; some were relocated and moved elsewhere. • Although land has been previously cleared for this development, 47 houses have been constructed as part of the earlier project. This therefore requires clearing of an additional land area to construct 47 more houses under this project. • Although this is the case, the proponent of the project shall develop necessary plans and implement the mitigation measures in association with relevant agencies to compensate for the loss of additional trees, especially mature trees. It is suggested to implement a replantation programme in consultation with the island and under the guidance of island office. Therefore, financial provisions shall be made available from the national budget to plant additional trees in the island. • The project will benefit the region by helping to develop the island as a regional centre. The project will help to provide better services, facilities and opportunities for new residents. • Several alternatives for the proposed project have been identified and they are discussed in detail. One of the alternatives identified is to construct multi storey housing flats rather than individual houses. • In light of this assessment, the proposed project has been found to have more positive than negative impacts, both environmentally and socially. It is crucial for the client to manage the project in consultation and assistance with other stakeholders if the environmental impacts are to be minimized.