Academic eBooks - ޢިލްމީ އީފޮތުގެ ޖަމާ

Browse

Search Results

Now showing 1 - 3 of 3
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for the proposed poultry farm development project at N. Ehdhufarumairah
    (2016-08) Water Solutions
    This report discusses the findings of a social and environmental impact study undertaken by Water Solutions Pvt. Ltd. at the request of Ocean Quartier Properties Pvt Ltd. This EIA report covers layer chicken poultry farm development project at Ehdhufarumairah, Noonu Atoll. Ehdhufarumairah is located on the eastern side of Noonu Atoll. This island is leased to Ocean Quartier Properties Pvt Ltd by Ministry of Fisheries and Agriculture. Ocean Quartier Properties Pvt Ltd is the proponent of this project. Ocean Quartier Properties Pvt Ltd had acquired knowledge and information about commercial layer chicken poultry and officials of the company had travelled to Srilanka and Thailand and visited different layer chicken poultry farms projects to gain more experience and information on different poultry businesses which could be development in islands of Maldives. The project is proposed in Ehdhufarumairah. The vision is to establish layer chicken farm in Ehdhufarumairah which ensure commercial and environmental sustainability of producing chicken eggs locally. The main aim of this poultry farm project is to lessen import of chicken eggs to meet the local demand. Work is planned for sustainable layer chicken poultry farming ensuring the use of environment friendly technology. Under this project, sea cucumber feed materials will be made using the organic waste on the island and provide sea cucumber farms in the region. The proposed layer chicken poultry would be developed by importing layer type chicks from Srilanka from CP Farm, rearing chicken in the island in cages till it is old enough to lay eggs when they are 21 weeks olds. The poultry farm would be automated as to manage the feeding operations to the layer chickens, collection of eggs from the cage houses and removal of manure from the cages houses as waste material. The project will develop the necessary infrastructure in the area of power, water, sewage and wastewater to make the proposed poultry project sustainable. The project also involves developing accommodation and living areas for the researchers and famers on the island. The EIA was undertaken to assess the environmental and social impacts of this project. Based on the assessment, it has been identified that the major impacts of the project will be felt on the terrestrial environment during the construction stage. Ehdhufarumairah is not a large uninhabited island that could develop a large poultry farm. The development on the island will have impacts on marine environment from construction of jetty and outfalls. During the operational stage, environmental concerns are much less and are associated with energy, water, and waste and wastewater management. The mitigation measures are provided in the report with alternatives. It is vital to conduct the activities, during both construction and operational stage, in line with mitigation measures emphasized in the report. Socio-economic impacts of the proposed project will be creation of job opportunities in the atoll and development of the poultry industry in the country. This project will create enormous economic opportunities both in the construction and operational stage through creation of both short-term and permanent jobs and business opportunities especially for the locals at Velidhoo and Manadhoo. This project will introduce and promote the development of layer chicken poultry for the production chicken eggs on commercial scale enabling Maldives to provide additional avenue for employment and income generation. Towards the end of the report, a monitoring programme has been suggested which covers components of terrestrial, coastal and marine environment. It is important to follow this monitoring programme not only to comply with the regulation but also to ensure that the impacts are measures in realistic terms.
  • Item
    Technical Report
    First addendum to environmental impact assessment for harbour development project at M. Dhiggaru
    (2016-10) Water Solutions
    This report discusses the findings of a study undertaken as an addendum to environmental impact study undertaken by Ministry of Housing and Infrastructure for the harbour development project at M. Dhiggaru at the request of Ministry of Housing and Infrastructure. This Fist Addendum to EIA for the Harbour Development Project at M. Dhiggaru report covers fishing vessel beaching area to be developed as additional work for the harbour development project currently being implemented at M. Dhiggaru. This EIA Addendum report is prepared in accordance with Environmental Impact Assessment Regulations, 2012 under the Environmental Protection and Preservation Act (Act No. 4/93). The purpose of this EIA is to fulfill the requirement of the Law and to conduct an assessment of possible impacts on environment arising from the proposed fishing vessel beaching area at M. Dhiggaru. The project is at the island of Dhiggaru in Meemu atoll. The island is located at the northern edge of the Meemu atoll. The island is situated in a large reef system. The closest island to Dhiggaru is Madduvari which is about 1 km to the east of Dhiggaru. The harbour development project is proposed by Ministry of Housing and Infrastructure representing the government of Maldives and the Ministry is responsible for all development and regulation of the construction sector. The contractor for the project is Maldives Transport and Contracting Company (MTCC). The beaching area for the fishing vessel has been proposed as an extension of the harbor development project at M. Dhiggaru. Currently there is no area for beaching of vessel at the island. This has caused a lot of difficulty for the fishing vessel to undertake dry dock repairs which is routinely required. The island has a population size of approximately 1300. The main economic activity of the island is fishing1 The island of Dhiggaru is famous for “dhiggaru rihaakuru” which provides a good economic income to the community. The project involves dredging of 60 m by 45 m basin area to a depth of -3.0 m MSL, an entrance channel of 20 m wide and 117 m long. The dredging is expected to generate 12,600m3 of dredged material. This dredged material would be used to reclaim 8,400 m2 of area on western side of the island. The new land created would be used for boat repair work. All project activities will be in conformance to the laws and regulations of the Maldives, and relevant international conventions that Maldives is party to. The key laws and regulations applicable to this project are Environmental Protection and Preservation Act and Environmental Impact Assessment Regulation 2012 and its subsequent amendments The study for the addendum to EIA was undertaken to assess the environmental impacts of changes to the harbour development project on the island. The proposed site (lagoon) and entrance channel had no visible live corals and was highly turbid. seagrass is found at the lagoon. Based on the assessment, it has been identified that the major impacts of the project will be felt on the marine environment during the construction stage. Dhiggaru is not a large inhabited island but located on a very large reef system. The development of the beaching area on the island will have impacts on marine environment. During the operational stage, environmental concerns are much less and are associated with waste and wastewater management of the fishing vessels. The mitigation measures are provided in the report with alternatives. It is vital to conduct the activities, during both construction and operational stage, in line with mitigation measures emphasized in the report. Socio-economic impacts of the proposed beaching area development project will help the community to beach their vessel onto the island for dry dock maintenance work. This project will create economic opportunities both in the construction and operational stage through creation of both short-term and permanent jobs and business opportunities. Towards the end of the report, a monitoring programme has been suggested which covers components of coastal and marine environment. It is important to follow this monitoring programme not only to comply with the regulation but also to ensure that the impacts are measured in realistic terms.
  • Thumbnail Image
    Item
    Technical Report
    Environmental impact assessment for undertaking sand dredging at Gulhifalhu jetty area, Gulhifalhu, Kaafu Atoll
    (2016-10) Water Solutions
    This report discusses the findings of an environmental impact study undertaken by Water Solutions Pvt. Ltd. for Gulhifalhu Investment Ltd. The project involves maintenance dredging of the Gulhifalhu Jetty area. The project aims to:  Deepen the existing jetty basin  Provide safety and protection to the vessels accessing the jetty area  Increase the usable area of the jetty Gulhifalhu is an industrial island which lease land plots for different industrial purposes. Many private vessels travel Gulhifalhu to access their sites every day. There is an existing jetty area in Gulhifalhu that is used by these vessels to access the island to load and unload materials. However, now the jetty basin is very shallow due to accumulation of sand in the basin. Some areas of the basin are less than a meter deep making it impossible to moor vessels to jetty. This project aims to dredge this area to provide a safe basin and larger accessible area. Approximate total of 9000 cbm of sand will be dreged from this area. This sand will be stockpiled temporarily in Gulhifalhu and then will be transported to Thilafushi MRDC site for later use. Environmental impacts of this project were assessed and have been identified as resulting from the dredging works. Dredging work will be undertaken using excavators and sand pumps and this is particularly a method that creates lot of sedimentation which is a big threat to the marine environment. Mitigation measures for the negative impacts have been identified and outlined in the report. Completing the dredging works in the shortest time frame and in low tide hours is a significant mitigation measure to minimize the impact of sedimentation on the marine environment. In addition, dredging should be avoided in bad weather conditions. The proposed mitigation measures will have to be followed in order to minimize environmental damage. The measures proposed to minimize or mitigate environmental impacts may be considered to be appropriate, thereby minimizing the impact by about 90%. The main negative environmental impact of the proposed project would be sedimentation and destruction of the lagoon and damage to some areas of the nearby reefs, which will cause partial death of corals in other areas of the coral reef. During dredging works, the sedimentation will also affect the fish species in the vicinity of these areas and hence, their population will drop in areas affected by sedimentation. It is inevitable that there would be negative environmental impacts of this project. As a result, a mitigation and monitoring component has been suggested which takes into consideration, the most important elements that require monitoring, most importantly a mechanism and means to measure and value the social benefit of the project. This monitoring component will be adhered and will allow the assessment of long term changes, despite the potential negative impacts. The dredging of Gulhifalhu jetty area does pose some threats to the marine environment of the area. There will be direct and indirect damage to marine environment in the vicinity of the project site. However there are many positive benefits of the project in long term. This project is justifiable in the light of the positive impacts.