Second addendum : F. Nilandhoo : environmental impact assessment to Nilandhoo harbour construction project, Faafu atoll, Maldives

dc.contributor.authorHussain, Firdous
dc.date.accessioned2019-02-04T03:59:43Z
dc.date.available2019-02-04T03:59:43Z
dc.date.issued2018-02
dc.description.abstractThis is the second Addendum to the Environment Impact Assessment (EIA) for the harbour development project in Nilandhoo, Faafu Atoll. The project is proposed by Ministry of Housing and Infrastructure. No scoping meeting was held as the proposed change is minor. This EIA addendum report aims to assess the issues highlighted in Terms of Reference (ToR) agreed between EPA and proponent. Furthermore, it is to fulfil the requirement of the Environmental Protection and Preservation Act of the Maldives (Law No. 4/93). Construction of Nilandhoo harbour was contracted with MTCC on 14th April 2015, whereas the EIA was undertaken for this project on September 2015 by Water Solutions Pvt ltd. Construction phase of the project was commenced thereafter in late 2015. Need and justification of the harbour construction project has been described in the initial EIA. First addendum to the EIA of Nilandhoo was made to change the sand borrow site. The 2nd addendum is to address a proposed design change to the quay-wall structure where the initially proposed revetment and concrete quay-wall will be replaced by a 346m long steel sheet pile quay-wall along the same line. The total length of 346m will be achieved in two stages where 223m will be completed in the first stage. Environmental impacts of the proposed change were assessed for both construction and operation stage of the project. Other than vibration which will also be localized in the project area, no additional negative impacts are expected due to the proposed change in design. Effective impact mitigation measures identified in the report are to be taken during the construction to minimise the magnitude of their occurance Environment monitoring program discussed in 2015 EIA is sufficient and should be followed. In an environmental and technical point of view, the proposed change to F.Nilandhoo harbour project can be continued as proposed.en_US
dc.identifier.citationHussain, F. (2018). Second addendum : F. Nilandhoo : environmental impact assessment to Nilandhoo harbour construction project, Faafu atoll, Maldives. Male': Maldivesen_US
dc.identifier.urihttp://saruna.mnu.edu.mv/jspui/handle/123456789/3078
dc.language.isoenen_US
dc.subjectBathymetryen_US
dc.subjectShoreline mappingen_US
dc.subjectBeach profilesen_US
dc.subjectMarine surveyen_US
dc.subjectSocial environmenten_US
dc.subjectMeteorological conditionsen_US
dc.subjectExisting environmenten_US
dc.subjectMarine water qualityen_US
dc.subjectCoastal environmenten_US
dc.subjectNatural hazard vulnerabilityen_US
dc.subjectEnvironmental impactsen_US
dc.subjectEnvironmental monitoringen_US
dc.titleSecond addendum : F. Nilandhoo : environmental impact assessment to Nilandhoo harbour construction project, Faafu atoll, Maldivesen_US
dc.typeTechnical Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
Second EIA Addendum Report_Nilandhoo Harbour.pdf
Size:
19.03 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: