DC Field | Value | Language |
dc.contributor.author | Land and Marine Environmental Resources Group | - |
dc.date.accessioned | 2019-05-12T04:40:10Z | - |
dc.date.available | 2019-05-12T04:40:10Z | - |
dc.date.issued | 2012-01 | - |
dc.identifier.citation | Land and Marine Environmental Resources Group. (2012). 1st addendum to the EIA report development of city hotel, hospitality institute and resort development At Bodufinolhu And Gasfinolhu Laamu Atoll. Male': Maldives | en_US |
dc.identifier.uri | http://saruna.mnu.edu.mv/jspui/handle/123456789/3805 | - |
dc.description.abstract | This first addendum to EIA report for Development of City Hotel, Hospitality Institute and resort development at Bodufinolhu and Gasfinolhu is prepared to address the construction of a temporary causeway connecting L. Gan City Hotel area and Bodufinolhu for the duration of construction phase of Bodufinolhu. EPA instructed the proponent to remove the temporary cause way constructed connecting the two islands during December 2011 after a complaints raised from an individual from L. Gan. A temporary cause way was constructed by the proponent using dredged material and three
concrete culverts connecting the two islands (L. Gan and Bodufinolhu) for transporting construction material from L. Gan to Bodufinolhu. In consultation with EPA and Tourism ministry it was decided that temporary cause way can be constructed with environmental clearance in the form of an addendum.
The temporary cause way will be constructed at the channel area between L. Gan and Bodufinolhu (shortest length). The cause way will be constructed west of main road (to locate cause way within the City Hotel boundary) at L. Gan and connected at the southern end of Bodufinolhu. The proposed causeway is 31.59m long and 4m wide. Culverts will be placed at 1m intervals of opening size 1.5m. The culverts will be constructed with reinforced concrete. Excavators will be used for transporting the culverts to designated locations (13 culverts will be constructed). Water current speed measure was taken near the existing culverts to record the current speed flowing behind the causeway and at the eastern side of Bodufinolhu and Gasfinolhu. Water
current at the eastern side of Bodufinolhu and Gasfinolhu is low (0.21m/s near Bodufinolhu and 0.16m/s near Gasfinolhu). Current speed just west of culvert is at an average 0.74m/s during high tide. During low tide due to the sediment build up near the culvert water flow is completely blocked.
Shoreline survey was carried out using precision GPS; recording beach toe and low tide line. Since the eastern side of L. Gan and Bodufinolhu is an intertidal area (mostly near Gan) beach toe was recorded for the eastern side. Qualitative assessment was carried out at the proposed causeway location. Since already a causeway is construction area east of the causeway was assessed. The qualitative survey carried out at the area showed that dominant benthic substrate was sea grass. The area was sandy with few rock patches. Two species of sea grass was observed at the area these are; Thalassia
hemprichii and Syringodium sp. Impacts on the environment by the construction of temporary causeway have been identified through interviews with the project management team, field data collection surveys (survey data from initial EIA and data collected for this addendum) and based on past experience in similar development projects. Possible impacts arising from the resort development and operation works are categorized in to reversible and permanent (irreversible) impacts. The impacts identified are also described according to their location, Extent (magnitude) and characteristics. Reversible and irreversible
impacts are further categorized in to intensity of impacts (negligible, minor, moderate and major)
for identifying best possible remedial (mitigation measures) action to be taken.
Since the area is already modified and is planned for additional coastal modifications additional
impacts in relation to construction of temporary causeway is minor to negligible.
Operational impact envisaged due to the proposed modification is change in hydrodynamic
regime (which is existing condition due to present causeway) due to the reduction of flow of
water through the culverts. This change in hydrodynamic regime is expected to be moderate since
the new causeway is design to allow maximum flushing (32% open based on 13 culverts of
opening width 1.5m).
The proposed causeway for use during the construction stage of Bodufinolhu resort development
is 4m wide and 31.59m long; constructed of concrete culverts and dredged material. Alternatives
are jetty structure constructed using piles or piers, barge used for transport of material across the
channel and the no project scenario.
Mitigation provided in the EIA report is sufficient for mitigating impacts identified in this
addendum to the EIA report. Mitigation for Solid waste handling and construction related impacts
are provided in the initial EIA report.
No additional monitoring is required as a result of the proposed temporary causeway. Monitoring
works proposed in the EIA report includes reef and shoreline monitoring of all three project
islands (including beach profiles and mapping of shoreline using high precision GPS).
The proposed causeway is designed to allow maximum flow of water with structural integrity to
allow transport of dumper trucks across to Bodufinolhu. The design of the causeway is formulated
based on the consultation with EPA (during inspection visit to site by EPA personnel in regards to
complaint raised by an islander from L. Gan due to the construction of causeway blocking the flow
of water between Gan and Bodufinolhu) and EIA consultant. The causeway will be used only for
the duration of Bodufinolhu construction work and will be removed once construction is
completed (12 months). | en_US |
dc.subject | Existing environment | en_US |
dc.subject | Potential impacts | en_US |
dc.subject | Mitigation and management of negative impacts | en_US |
dc.title | 1st addendum to the EIA report development of city hotel, hospitality institute and resort development At Bodufinolhu And Gasfinolhu Laamu Atoll | en_US |
dc.type | Technical Report | en_US |
Appears in Collections: | ތިމާވެށި Environment A
|