Please use this identifier to cite or link to this item: http://saruna.mnu.edu.mv/jspui/handle/123456789/4731
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMaldives Energy and Environmental Company-
dc.date.accessioned2019-08-27T07:40:01Z-
dc.date.available2019-08-27T07:40:01Z-
dc.date.issued2015-12-
dc.identifier.citationMaldives Energy and Environmental Company. (2015). Environment impact assessment report reclamation of Himmafushi K. Atoll, Maldives. Male': Maldivesen_US
dc.identifier.urihttp://saruna.mnu.edu.mv/jspui/handle/123456789/4731-
dc.description.abstract1. This report provides the finding of an environmental impact assessment conducted for the reclamation of 21.6 hectares land on the southeastern lagoon of Himmafushi to facilitate much needed additional land for the residents of the island. The project is proposed by Ministry of Housing and Infrastructure. According to EIA Regulations 2012, an Environmental Impact Assessment is required for reclamation and dredging projects. Hence, this report has been prepared to fulfil the requirements under the EIA regulations. 2. Himmafushi is a highly industrial island community and the industrial footprint covers 30% of the total land area, 35% is utilized for residential plots and 25% used for government use. As a result, almost all land available is currently being used for housing, economic establishments and socio- economic infrastructure on the island and the island is land-locked. Hence, there is an urgent and immediate need for additional land to meet the various demands. It is estimated that 745,200 cubic metres of borrow materials would be needed to reclaim 21.6 hectares of land in Himmafushi. The proposed locations for the sand borrow areas are within intra-atoll basin of AA Atoll. Alternatives have been identified in the project document. These include alternatives for the dredge areas, dredge method and alternative locations for land reclamation. 3. Himmafushi is located in a sensitive geographic area where its house reef is shared by two popular tourist resorts and two marine protected areas are situated within close proximity to the island. These sensitivities have been taken into account when analysing the impacts. Environmental impacts were identified and assessed for both the reclamation (construction) phase and operational phase of the project. The negative impacts of the project would be felt mostly during the construction (reclamation) phase and on the marine ecosystem. Sedimentation has been highlighted to be one of the most important negative effects of the project. Following careful evaluation of the negative impacts, appropriate and practical mitigation measures have been proposed to reduce adverse impacts that would arise from the project. Significant positive impacts have been identified for the implementation phase resulting. The project would not only address the land shortages for housing but also will boost the economy of the island due to stimulated businesses. These positive effects would translate into improved socio-economic conditions and improved well-being of the community. 4. The Proponent, Ministry of Housing and Infrastructure is committed to undertake the necessary mitigation measures and monitoring during all stages of the project. The project is in line with the national development polices of the government and panned to be executed in compliance with the relevant laws and regulations of the Maldives pertaining to conservation of the environment. 5. In conclusion, this EIA has looked into the key factors that shall be taken into account during construction and operational stage of the project. Even though this project does have significant environmental impacts to the marine environment, with appropriate measures, those negative effects can be mitigated to an acceptable level. It is also worth highlighting significant positive impacts that the project is expected to bring to the community would translate into improved living conditions and overall social well-being of the community.en_US
dc.subjectDescription of the projecten_US
dc.subjectRegulatory considerationsen_US
dc.subjectSurvey methodsen_US
dc.subjectExisting environmenten_US
dc.subjectHydrographyen_US
dc.subjectSocio-economic environmenten_US
dc.subjectStakeholder consultationsen_US
dc.subjectImpacts and mitigation measuresen_US
dc.subjectAlternativesen_US
dc.subjectEnvironmental monitoringen_US
dc.titleEnvironment impact assessment report reclamation of Himmafushi K. Atoll, Maldivesen_US
dc.typeTechnical Reporten_US
Appears in Collections:ތިމާވެށި
Environment E


Files in This Item:
File Description SizeFormat 
EIA for Land Reclamation at K. Himmafushi.pdf11.71 MBAdobe PDFView/Open


Items in Saruna are protected by copyright, with all rights reserved, unless otherwise indicated.