Please use this identifier to cite or link to this item: http://saruna.mnu.edu.mv/jspui/handle/123456789/4753
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAbdul Wahhab, Mahfooz-
dc.contributor.authorJameel, Mohamed Ibrahim-
dc.contributor.authorShareef, Ali-
dc.date.accessioned2019-08-29T12:43:19Z-
dc.date.available2019-08-29T12:43:19Z-
dc.date.issued2016-04-
dc.identifier.citationAbdul Wahhab, M., Jaleel, M. I. & Shareef, A. (2016). Environmental impact assessment for development of a new power house at B. Hithaadhoo. Male': Maldivesen_US
dc.identifier.urihttp://saruna.mnu.edu.mv/jspui/handle/123456789/4753-
dc.description.abstractThe proposed project aims to provide sustainable electricity supply for B. Hithaadhoo by the development of a new powerhouse. The project is essentially required because the existing powerhouse is not in accordance with current standards and is in the middle of the residential area. The project involves the construction of a new powerhouse away from the residential area and the transfer of existing generators to new powerhouse. The relocation of powerhouse is essential as the noise and smoke disturbance from the generators to the community is high. However with the development of new powerhouse it is expected that the noise and smoke disturbance will be reduced greatly. The negative impacts during the construction will be loss of vegetation and risk of groundwater contamination. During operation also there is risk of groundwater contamination. However with proper daily maintenance and following proper chemical handling procedures the risks can be minimized. The positive impacts from the project will be very high as Fenaka Corporation would be able to provide electricity sustainably to Hithaadhoo with negligible disturbance to community.en_US
dc.subjectPowerhouse developmenten_US
dc.subjectLegislative and regulatory considerationsen_US
dc.subjectExisting environmenten_US
dc.subjectEnvironmental impactsen_US
dc.subjectMitigation measuresen_US
dc.subjectEnvironmental monitoringen_US
dc.subjectEnvironmental impact assessmentsen_US
dc.titleEnvironmental impact assessment for development of a new power house at B. Hithaadhooen_US
dc.typeTechnical Reporten_US
Appears in Collections:ތިމާވެށި
Environment E


Files in This Item:
File Description SizeFormat 
EIA for development of power house in B. Hithaadhoo.pdf10.07 MBAdobe PDFView/Open


Items in Saruna are protected by copyright, with all rights reserved, unless otherwise indicated.