Please use this identifier to cite or link to this item: http://saruna.mnu.edu.mv/jspui/handle/123456789/3081
Title: Environmental impact assessment : design and project management of the construction of bridges, channels, harbours and shore protection works at Hulhumale’ phase 2
Authors: Water Solutions
Keywords: Policy and legal framework
Administrative framework
Bathymetric survey
Marine survey
Marine water quality
Existing environment
Geographic setting
Topography
Soil condition
Geotechnical investigations
Wind climate
Wave climate
Currents
Tide and water levels
Morphology
Marine hazards
Temperature
Precipitation
Seismic information
Existing structures
Coastal environment
Coral reef system
Marine environment
Socio-economic environment
Mitigation measures
Environmental management
Monitoring plan
Issue Date: Jan-2018
Citation: Water Solutions. (2018). Environmental impact assessment : design and project management of the construction of bridges, channels, harbours and shore protection works at Hulhumale’ phase 2. Male': Maldives
URI: http://saruna.mnu.edu.mv/jspui/handle/123456789/3081
Appears in Collections:ތިމާވެށި
Environment A


Files in This Item:
File Description SizeFormat 
2018-01-31 - Hulhumale TUMAS EIA report FINAL.pdf45.7 MBAdobe PDFView/Open


Items in Saruna are protected by copyright, with all rights reserved, unless otherwise indicated.