Abstract: | This report discusses the findings of an Environmental Impact Assessment (EIA) carried out
for the proposed 11-storey building including an underground basement at H. Del Rio, Malé.
The project is proposed by the land owner, Mohamed Shafiu of H. Del Rio. EIA is required
for buildings with basements or foundations that are laid below 1.8m from the ground, as per
the EIA Regulations of the Maldives and all amendments to it up to date.
The main objective of the EIA is to identify potential impacts of excavation, construction of
foundation and dewatering and consider mitigation measures that may be adopted. In
addition, the EIA would also consider other construction phase and operational phase
activities such as waste management, energy and water supply although they are not directly
related to the scope of the EIA. Demolition of the existing single storey building has been
completed, and demolition impacts have not been covered in the EIA in detail.
The project is to commence as soon as the EIA is approved and the duration of the project
will not be more than 24 months. Substructure works, which is considered to be the most
sensitive component (socially and environmentally), is expected to be completed within two
months. The critical elements of excavation and dewatering are expected to be completed
within three to four weeks. Therefore, the project has a critical impact timeframe of less than
2 months.
Environmental assessment for building construction in Malé City was enforced following
incidents of cracks in neighbouring buildings and vibration and noise-related inconveniences
which occurred when deep piling was undertaken for the construction of the 15-storey
building in Athireege-aage. Based on this incident, deep piling is considered unsuitable for
congested Malé. Therefore, the most commonly adopted method of raft foundation will be
adopted in the construction of the proposed multi-storey building at H. Del Rio. This method
distributes the load from a structure over a large area, minimizing the pressure on the base.
This method of foundation is ideal for loose soils with low bearing capacity. However, since
the soil of Malé with well-compacted heterogeneous material provides very good base for
such foundations, there would be minimal disruption to adjoining structures. Since Del Rio is
on the original land of Malé close to the original shoreline, therefore, the foundation will be the on the original seabed and the same conditions would prevail. The area is also of compact
nature as this is close to the rim reef of the island and material is well compacted.
The proposed depth of the foundation for H. Del Rio is at about 2.8m below the existing
ground level or road level. This depth, which is greater than that of a typical building, is due
to the basement. The basement space is proposed as office space in the initial design,
however, may be used as parking space for the building in future. Parking is becoming an
important requirement due to the parking difficulties in Malé. The main concern in excavating
to this depth is the safety of the adjacent structures, most of which are old and do not have a
proper sub-structure. Therefore, appropriate protection measures have been considered during
the excavation, dewatering and foundation works. It is usual practice to provide a retention
structure to prevent the foundation of other buildings from collapsing during excavation and
the same methodology is proposed for this project. For dewatering, the current practice is for
Malé Water and Sewerage Company (MWSC) to install a purpose built catchpit connecting to
the main sewerage network and for the Contractor to pump effluent from the dewatering
process into this catchpit using multiple pumps at designated locations. Since dewatering is
required throughout the process of laying the foundation, it will be continuous and
irrespective of tide. In fact, tidal influence on the groundwater table has been seen to be very
little or negligible in most of the larger islands.
Heavy machineries that will be used in the construction include excavator and lorry for
demolition and excavation including demolition and excavation waste disposal and concrete
machine and large crane for concrete works on top floors. During excavation, excavators and
lorries will work inside Del Rio plot except for some minor works on the roadside. Soil that is
well segregated and free from debris and contaminants will be used in backfilling. Demolition
has been completed quite some time ago and is not within the scope of this EIA. The plot is
empty and grass has grown at the back of the plot indicating that the plot has been vacant for
quite some time. Cement dust during concrete works is expected to be less of an issue
compared to demolition dust and dust during sanding of walls. All these dust-prone activities
is expected to be carried out with caution to minimize dust levels in the area. During concrete
works, concrete machine and mobile telescopic crane will work from the road and appropriate
road blocks, safety and traffic diversion measures will be implemented according to the
requirements/recommendations of Malé City Council and Traffic Police. Safety measures within and outside the premises will be ensured during demolition of existing building until
the end of construction phase.
The project location is congested with mainly single storey buildings and a few multi-storey
buildings of less than 5 storeys. The previous building in Del Rio is a single storey residential
building with a normal roof. There is a multi-storey building on the south of Del Rio, at the
corner of the road. There are a couple of 6-storey buildings on the south of Del Rio but not
adjacent to Del Rio. The rest are mainly single-storey houses and a few 2-3 storey buildings.
There are a couple of 5 or more storey buildings in front of Del Rio. There is hardly any
vegetation in the area except for a mango tree on the west of the plot and a couple of Burmese
rosewood (ofi eley) on the road side southwards.
Due to the congested nature of Malé and the area surrounding the project site, the condition of
neighbouring houses were considered including condition of the structures, condition of
groundwater (if groundwater is used) and living conditions to some extent. It has been
identified that most of the buildings are old, single-storey or two-storey buildings and have
several cracks due to ageing and settlement (mainly on the ground floor in high rise buildings)
but could not have been subjected to vibration impacts in the past. There is little or no
structural damage in the existing multi-storey buildings. Traffic in the area was considered
important and was assessed to be similar to other areas of Malé. Traffic and pedestrian
numbers increases in the evening after 1600hrs because people are usually out during the
evening to cool off, especially for use of recreational facilities near Del Rio. The roads in the
vicinity of the project area are one-way roads making traffic diversions during the
construction phase easier. All parking spaces are nearly full throughout the day mostly with
parked motor cycles. Private cars are becoming increasingly common in Malé today,
therefore, getting parking space on the road is also becoming increasingly difficult. In terms
of living conditions in the vicinity of the project site, most of the houses have congested living
conditions except for some multi-storey buildings. Groundwater is still quite commonly used
in households for washing, flushing and other non-potable uses. Noise levels in the area are
much higher than expected and average noise levels during day time as well as night time
surpasses acceptable international standards for residential areas. There are also constant
noise sources in the vicinity such as the STELCO powerhouse which add to the background
noise levels of the area. The primary objective of the development is to enhance the income of the plot owner while
improving quality of housing provided in Malé and improve living conditions in Malé. The
living environment in Malé is in grave condition with building after building without any
space except public spaces and roads. Most of the single storey houses and some of the multistorey
buildings have congested living spaces. With a population density of
18,000persons/square kilometer of land area, and thousands of vehicles, Malé needs vertical
growth and with increasing land value multi-storey buildings with adequate parking spaces in
the building is an important aspect of development in Malé.
The overall environmental and social impacts of the projects have been assessed and impacts
are considered to be low magnitude and of minor significance. The negative environmental
and social impacts of the development are also mainly short-term while the positive socioeconomic
impacts of the project are long-term. Therefore, the overall impact of the proposed
projects is greatly positive resulting mainly from improved living spaces and economic
benefits, both direct and indirect. There would also be direct and indirect employment
opportunities in the planning/design phase, construction phase as well as operational phase of
the project. The socio-economic benefits of the project can be considered to outweigh the
negative impacts of the project.
The main potential impact of the project is possible damage to neighbouring structures due to
vibration and weakness to substructure caused by soil movement due to deep excavation and
dewatering. Disturbances to neighbours is an inevitable impact that will have to be minimized
by taking appropriate measures to minimize nuisances such as noise and controlling dust and
taking safety precautions. The construction staff needs to know about the importance of
minimizing noise and dust and neighbours shall be made aware of the nature of works and
potential disturbances. A grievance redress mechanism would have to be in place and made
known to neighbours. Such a mechanism has been proposed in the report.
Protection to neighbouring structures is an aspect that needs to be carefully looked at. Details
of such protection are discussed in the report. Boundary walls of neigbouring structures would
have to be protected prior to excavation. Impacts due to dewatering may be felt on adjacent
buildings as well as neighbouring wells. Impacts of excavation and dewatering include
loosening of subsoil and reduction in bearing capacity of the soil. This would generally occur
in loose soil but not in compact sandy soil, as found in the project site, which is part of the
original island of Malé. Sand particles have irregular shapes and sizes, therefore, it is well locked in place giving it a good load bearing capacity. Since the excavation is not too deep
(about 3m from the ground surface), excavation would not have major impacts on the
adjoining structures/buildings. The drawdown caused by dewatering on the water table is not
expected to cause any loosening of subsoil in the area, since dewatering occurs at a shallow
depth from the water table. However, the superficial groundwater lens will become saline due
to drawdown. The current practice of using several small pumps instead of small number of
large pumps minimizes such drawdown and there would be minimal impact on neighbours’
use of groundwater. However, this has to be monitored for the adjoining wells and provisions
made to compensate for any drawdown effects. There is a mango tree on the west of the plot,
which may be adversely affected due to salinization of the water lens. Appropriate mitigation
of the impact by watering the tree regularly during the course of the dewatering works has
been recommended.
Atmospheric pollution due to concrete mixing works on site, cutting tiles, grinding and
sanding of walls and timber works are of concern. Often only interior walls undergo
smoothing by sanding and this process occurs within confined space. Carpentry works on site
would be limited. Yet, it is often the case in Malé that interior finishing works are undertaken
at night and with current regulations allowing noisy operations until midnight, there are
certain disturbances that has to be minimized, especially given that the project happens in a
residential area.
In addition to foundation protection measures, the main mitigation measures for the proposed
project would be to design for maximum natural ventilation and light, design for optimal
efficiency of building while minimizing on losses such as excess concrete as in some of the
recent buildings, minimizing and taking care in dusty operations, taking heed of noise during
school hours and prayer times as well as night time and keeping the work areas safe and
clean.
The overall impacts of the proposed project are largely positive with some minor negative
impacts. Yet, environmental monitoring has been proposed in order to ensure the
effectiveness of the proposed impact management and mitigation measures. The proposed
monitoring programme considers engineering inspection during foundation works,
groundwater quality changes and availability during dewatering, dust and noise during
construction, complaints/grievances, waste management measures including removal of excavated sand and demolition debris, measures to minimize falling of objects/materials
during demolition, provision of personal protective equipment and so on.
In conclusion, it appears justified from a socio-economic and environmental point of view, to
carry out the proposed project. |